20xx年11月份托福阅读真题及答案(编辑修改稿)内容摘要:
parent bird does. (D) They are expensive to operate. 22. Which of the following terms is defined in thepassage? (A) Aviculturists (line I) (B) Gradient (line 8) (C) Incubation (line 15) (D) Embryo (line 24) Questions 2333 The mineral particles found in soil range in size from microscopic clay particles to large boulders. The most abundant particles— sand, silt, and clay— are the focus of examination in studies of soil texture. Texture is the term used to describe the line posite sizes of particles in a soil sample, typically several representative handfuls. (5) To measure soil texture, the sand, silt, and clay particles are sorted out by size and weight. The weights of each size are then expressed as a percentage of the sample weight. In the field, soil texture can be estimated by extracting a handful of sod and squeezing the damp soil into three basic shapes。 (1) cast, a lump formed by squeezing (10) a sample in a clenched fist。 (2) thread, a pencil shape formed by rolling soil between the palms。 and (3) ribbon, a flatfish shape formed by squeezing a small sample between the thumb and index finger. The behavioral characteristics of the soil when molded into each of these shapes, if they can be formed at all, provides the basis for a general textural classification. The behavior of the soil in the hand test is determined by the (15) amount of clay in the sample. Clay particles are highly cohesive, and when dampened, behave as a plastic. Therefore the higher the clay content in a sample, the more refined and durable the shapes into which it can be molded. Another method of determining soil texture involves the use of devices called sediment sieves, screens built with a specified mesh size. When the soil is filtered (20) through a group of sieves, each with a different mesh size, the particles bee grouped in corresponding size categories. Each category can be weighed to make a textural determination. Although sieves work well for silt, sand, and larger particles, they are not appropriate for clay particles. Clay is far too small to sieve accurately。 therefore, in soils with a high proportion of clay, the fine particles are measured on the (25) basis of their settling velocity when suspended in water .Since clays settle so slowly, they are easily segregated from sand and silt. The water can be drawn off and evaporated, leaving a residue of clay, which can be weighed. 23. What does the passage mainly discuss? (A) Characteristics of high quality soil (B) Particles typically found in most soils (C) How a high clay content affects the texture of soil (D) Ways to determine the texture of soil 24. The author mentions several representative handrals in line 4 in order to show (A) the range of soil samples (B) the process by which soil is weighed (C) the requirements for an adequate soil sample (D) how small soil particles are 25. The phrase sorted out in line 5 is closest in meaning to (A) mixed (B) replaced (C) carried (D) separated 26. It can be inferred mat the names of the three basic shapes mentioned in paragraph 2 reflect (A) the way the soil is extracted (B) the results of squeezing the soil (C) the need to check more than one handful (D) the difficulty of forming different shapes 27. The word dampened in line 15 is closest in meaning to (A) damaged (B) stretched (C) moistened (D) examined 28. Which of the following can be inferred from the passage about a soil sample with little or no clay in it? (A) It is not very heavy. (B) It may not hold its shape when molded. (C) Its shape is durable (D) Its texture cannot be classified 29. The word they in line 23 refers to (A) categories (B) sieves (C) larger particles (D) clay particles 30. It can be inferred from the passage that the sediment sieve has an advantage over the hand test in determining soil texture because (A) using the sieve takes less time (B) the sieve can measure clay (C) less training is required to use the sieve (D) the sieve allows for a more exact measure 31. During the procedure described in paragraph 3, when clay particles are placed into water they (A) stick to the sides of the water container (B) take some time to sink to the bottom (C) separate into different sizes (D) dissolve quickly。20xx年11月份托福阅读真题及答案(编辑修改稿)
相关推荐
,由地方人民政府根据当地实际规定。 () 2国家机关工作人员和教科书审定人员应当参与教科书的编写工作。 () 2宁宁今年小学毕业了,他可以到商 店当售货员。 ( ) 2县级以上人民政府具体负责义务教育实施工作。 () 2义务教育经费投入实行国务院和地方各级人民政府根据职责共同承担,县级人民政府负责统筹落实的体制。 () 四、词语理解 思维: 是事物在人脑中的概括的和间接的反映
联合会 年发生了汶川大地震,中国政府做了各种努力, 84017 人被抢救出来, 140 万被解救, 430万被救治, 1万伤员转到 20个城市地区,被 375所医院及时救治,这个事实表现了 A. 我国社会主义制度珍爱生命,保护人民的性质 B. 中华民族关爱生命,崇尚理性的民族品格 C. 党和政府为人民服务的根本宗旨 D. 社会主义核心价值体系建设的显著成效 32. 2020年 6月 20号
B. on C. at D. of ( )6. A. is B. are C. am D. be ( )7. A. He B. Her C. His D. Him ( )8. A. aunts B. uncles C. cousins D. sisters ( )9. A. are B. aren’t C. is D. isn’t ( )10. A. group B. family C.
O 6 x y y O 6 x y O 6 x O 6 x y A B C D 3 y=x26x+5. ( 1)解析式化为 y=a(xh)2+k 的形式; ( 2)求出该函数图像与 x轴、 y 轴的交点坐标 .. 15. 如图,在正方形 ABCD 中,点 E 是 CD上一点( DECE),连接 AE,并过点 E 作 AE 的垂线交 BC 于点 F,若 AB=9,BF=7,求 DE 长 . 16.
00ml含维生素C5mg~60mg,%~8%,具有生津、止渴、祛暑、安胎等功效。 柠檬酸可与钙离子结合成一种可溶性结合物,能减弱钙离子的凝血作用,防止血小板凝聚,预防高血压和心肌梗塞。 柠檬还是极好的天然美容产品,柠檬中的枸援酸能与皮肤表面的碱中和,防止显色粒子沉积皮下,使皮肤白嫩红润。 柠檬独特的价值决定了它的市场优势。 柠檬市场状况安岳柠檬居于国内主导地位,竞争优势突出。
启动前, DEH 主控画面:各指示灯均灭,“已跳闸” 指示灯亮。 手 操盘:调门开度显示正常 , (高压调门全关)“打闸”按钮灯亮,其余按钮灯 均 灭。 2. 挂闸、运行 本机组 挂闸 采用 电动 挂闸,运行人员到 按挂闸按钮 对机组进行挂闸操作,安全油建立后,“电调主控”画面上“已挂闸”指示灯亮,待 “已运行”指示灯亮后运行人员 即可 开始 对机组 进行冲转 升速 操作。 3. 升速控制