20xx年01月toefl真题(编辑修改稿)内容摘要:
es forming the framework, or skeleton, of the human body. (A) Being over (B)There are over (C) Where over (D)Over 16. The world39。 s water balance is regulated by the constant circulation of water in A B C Liquid and vapor tom among the oceans, the atmospheric, and the land. D 17. The major purpose of the United States Department of Education are to ensure A equal educational opportunity for all and to improve the quality of education. B C D 18. Massive gains in puter speed, power, and reliably have been largely due A B C to advances in silicon tec~logics and manufacturing processes. D 19. The sunflower, the official state flower of Kansas, and is widespread in A B the prairies of the western United States. C D 8 20. Lake Superior, part of the United StatesCanadian boundary, is a largest A B C freshwater lake in the world. D 21. The snapper, a largeheaded fish with a long dorsal fin, is named to its A B characteristic way of suddenly, shutting its mouth. C D 22. The aim of the decorative arts is to beautiful our surroundings. A B C D 23. Modern digital synthesizers, based on microprocessors, are virtually unlimited A B in the number and range of musical sounds it can produce. C D 24. During the years he posed, Charles Ives was isolation from the music world。 A B none of his major works was publicly performed. C D 25. Psychoanalysis is a form of therapy that attempts to eliminate conflict by alter the A B C personality in a positive way. D 26. Globally, the 199039。 s stood out as the warmest decade for what we have weather A B C D records. 27. Silicon chips are reliable and cheap to produce in large numbers and are A used them in puters, calculators, programmed household appliances, and B C most electronic applications. D 28. Because its pitch cannot easily be altered, the oboe serves as the standard A B which by the symphony orchestra is tuned. C D 29. Bursae are fluidfilled sacs that form cushions between tendons and bones and A B C protect them while movement. D 30. In 1916, United States suffragist Alice Paul founded the National Woman, s Patty, A a political party dedicate to establishing equal rights for women. B C D 31. The spice cinnamon and the drugs cascara and quinine all e from bark, the 9 A protective out layer of stems and roots of woody plants. B C D 32. Tunas migrate long distances over all the world39。 s oceans and occupy tropical, A B C temperate, and even some the cooler waters. D 33. Taste buds, small sensory an located on the tongue and palate, recognize four A B primary tastes: sweet, sour, salty and bitter. C D 34. Astronauts receive extensive training to prepare themselves both physically and A B C psychologically for plexity and rigor of a space mission. D 35. By 1900 several prominent technical institutions, including the Massachusetts A Institute of Technology, fashioned its own educational offerings to meet the B C industrial needs of the United States. D 36. Some of the earliest mechanical devices were designed to raise water from A B C streams for the irrigate of crops. D 37. The Louisiana Purchase of 1803 increased the territory of the United States A by approximate 846,000 square miles, practically doubling the area of the B C D United States. 38. A most useful tool for analyzing the elemental position of fossils is the A B C electron probe, a modify electron microscope. D 39. Few substance on Earth equal the beauty of gemstones such as twinkling A B C diamonds, green emeralds, red rubies, blue sapphires, and multicolored opals. D 40. For the purposes of the fine and decorative arts, metals have been used either in A B C their simple state and in unplicated alloys. D Section Three: Reading Comprehension 10 Question 110 After 1785, the production of children39。 s books in the Untied States increased but remained largely reprints of British books, often those published by John Newbery, the first publisher to produce books aimed primarily at diverting a child audience. Ultimate]y, Line however, it was not the cheerful, mercialminded Newhery, but AngloIrish author 5 Maria Edgeworth who had the stron。20xx年01月toefl真题(编辑修改稿)
相关推荐
际化。 全国性是从学校服务和影响范围来讲。 即思考南昌大学的所有问题都应摆在全国范围内这个参照系上来考虑,决不能满足在省内的所谓领先。 我们的服务和影响力也应在立足江西,面向全国,使全国各地、各条战线都能感觉到我们南昌大学的存在,感觉到南昌大学的影响;学生生源和师资来源也应该是全国性的,要逐步加大外省生源的比例,争取在 23年内达到 50%以上,要加大对全国各地名牌院校引进师资的力度
r乙 =1,两种情况下回归预测的准确性是 A. 甲 乙 B.甲 乙 C.甲 =乙 D.没一定关系 北京新现代学校 2 第二部分 非选择题 二、填空题(本大题共 10小题,每空 1 分,共 20 分) 请在每小题的空格中填写正确的答案。 错填,不填均无分。 11.推论统计的方法包括有关从 的数量特征推测 的数量特征的一系列问题。 12.心理统计中常用的集中趋势的指标有平均数、 和。
m status syndrome _______, (A) was first accepted by the World Health Organisation in 2020 (B) was proposed by Professor Marmot to describe social changes (C) is used to expose the major causes of
术园区(高新区、基地、孵化器、民科园 等)内和国家级(部级)立项的项目。 专题二十: 节能型轿车与汽车零部件设计制造技术 (专题编号 0020) 重点支持: ( 1)围绕中高档轿车的关键零部件设计制造技术,包括发动机优化设计技术,车身设计技术,自动变速箱关键技术,电子系统匹配及应用技术,轻量化材料应用技术,汽车排放后处理技术,以及汽车设计、制造、试验系统及软件等。 ( 2)节能型
中法人资本 亿,个人资本 亿,按照 2020 年底的上市收盘价格 11 元 /股计算, 12 企业总市值达到 亿元。 2020 年总资产达到 42亿元,比上年增长 %;总收入达到 50亿元,比上年增长%;工业增加值 亿元,比上年增长 %。 2020 年生产的主要产品:氧化铝118 万吨,比上年增长 %;全部铝锭 万吨,比上年增长 %,其中电解铝 万吨,比上年增长 %,再生铝 万吨,比上年增长 %
实习报告 第 3 页 共 5 页 增压泵 ―― 静态混合器 ―― 纺丝箱体 ―― 计量泵 ―― 组件 ―― 喷丝板 ―― 冷却成型 ―― 卷绕 ―― 往复 -- 集束 ―― 穿丝孔 ―― 导丝机 ―― 浸溶槽 ―― 第一牵伸机 ―― 油剂浸溶槽 ―― 第二牵伸机 ―― 蒸汽 加热 箱 ― — 19 辊牵伸机 ―冷却机 ―― 上油 ― — 叠丝机 ― 张力机 ―― 预热箱 ― 卷曲机 ― — 横