职称英语综合类考试模拟试题8(编辑修改稿)内容摘要:

mpathy. It was impossible to tell her age。 she reminded me faintly of my grandmother because, although her eyes were friendly. I could see that she was not a woman to fall out with. I spoke at last. I was just looking really, I said, though secretly wondering how much of the stuff I could cram into the bus. The woman turned away and went at once towards a back room, indicating that I should follow her. But it in no way lived up to the first room. The light made me feel peculiar, too. It came from an oil lamp that was hung from the centre of the ceiling and created huge shadows over There were no rare electric guitars. no old necklace, no handpainted boxes with delicate flowers. It was also obvious that it must have taken years, decades, to collect so much rubbish, so many old documents arid papers. 请点击右上角的分享按钮与好友共享 唯一交流 1294383109 I。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。