高考英语重点内容复习(编辑修改稿)内容摘要:
9. I’m sure he is to e to the meeting on time. A. likely B. probably C. possible D. probable 30. He made clear to his workmates that he would leave the pany. A. it B. that C. them D. this 31. surprised me most was Mary spoke Chinese just like a native speaker. A. That, what B. Which, that C. What, that D. That, that 32. is known to all, smoking is harm our health. A. As, for B. As, to C. It, for D. It, to 33. The teacher as well as the students planting trees. A. are B. is C. has D. have 34. We’d better hurry. Our teacher us. A. wait for B. must wait for C. must be waiting for D. has waited for 35. I go out to play now, mum? No, you . You should do your homework first. A. Must, mustn’t B. Might, wouldn’t C. Need, mustn’t D. May, had better not 36. In the south of China, there is of rain every year. A. numbers B. a great many C. a number D. plenty 37. It worried her a bit she is being weaker and weaker. A. what B. whether C. that D. why 38. Can I smoke here? No, at no time in the library. A. smoking permits B. smoking does permit C. smoking is permitted D. is smoking permitted 39. I wonder why he left without a word. He some trouble for he looks dull. A. could have had B. should have had C. can have had D. must have had 40. Our success whether everyone works hard or not. A. lies down B. leads to C. depends on D. results in 完型填空 从所给的四个选项中选择最佳答案 How far is the sun from the earth? This is a question you have asked yourself since you began asking anything. In fact, for thousands of years astronomers (41) the same question. But they had no way (42) getting an exact answer (43) the sun was far, far away. Now with the use of radio telescope, they (44) give a very exact answer: the sun is 92,956,000 miles away from the earth. Can you ima。高考英语重点内容复习(编辑修改稿)
相关推荐
句, 否则是同位从句。 newspaper [5njU:s9peip[] n. 1.(C) (=paper) a paper printed and sold to the public usu. daily or weekly, with news, notices, advertisements, etc. 报纸 a daily newspaper 每日发行的报纸 a newspaper
50。 yīn【解释】:在寂静的山谷里听到脚步声。 比喻极难得到音信、言论或来访。 【出处】:《诗经小雅白驹》:“皎皎白驹,在彼空谷。 ”《庄子徐无鬼》:“闻人足音跫然而喜也。 ”【示例】:幸~,得见君子,机缘难再,千载一时,故忍耻相投。 ◎清纪昀《阅微草堂笔记》卷十七【近义词】:稀世之珍、千载难逢、凤毛麟角【反义词】:多如牛毛、门庭若市、比比皆是【语法】:偏正式;作宾语;形容事物等【成语】
按要求组合信息。 根据 题 目要求,既然是说四点理由,那么就要从四个不同 的 方面来筛选,组织答案时,要注意和“幸福”含义相关。 本 题 解答误区在不能准确捕捉文段 的 主要信息,误把冗余信息、次要信息当作主要信息,从而导致压缩后要点概括不全面;语言组织不合理,导致压缩后 的 文字不能准确表达语意。 如易将文中 的 “ 闲暇时,与友人一起 K歌,购物,喝早茶,逛花市,看粤剧,尝粤菜,观羊城„„
原料。 图 8 中甲城市为世界最大的麻纺工业中心,也是该地区联系河运和海运的重要港口。 图 9 为甲城市的气候资料。 图8 图 9 (1)简述图示黄麻产区的气候特征。 (6 分 ) (2)简析图示黄麻产区的地形特征。 (4 分 ) (3)说明该地区有利于黄麻生产的水文条件。 (6 分 ) (4)分析甲城市发展麻纺织业的有利条件。 (12 分 ) 参考答案 一、选择题 1.
have learned one important rule: Almost all mon troubles eventually go away! Something good is certain to happen in the end when you do not give up, and just wait a little! I believe that my life