(江苏专用)20xx届高三英语一轮复习精品学案:module4_unit_3_tomorrow180s_world(编辑修改稿)内容摘要:
好厨师,并且总是使所有的人知道这一点。 remind sb. of sth. 使某人想起某事;提醒某人某事。 【 1】 put forward 调快 (钟表,时间 ),提出 (观点、议案等 ),推荐 The clock slows down. Please put forward the hands of it. 钟慢了,请把指针调快些。 I wasn39。 t convinced by any of the arguments that he put forward. 他所提出的任何论据都不能说服我。 She has decided to put her name/put herself forward as a candidate. 她打算推荐自己作为候选人。 put/set/lay aside 搁置一旁;把 (钱,时间等 )留存起来,储蓄;抑制 (愤怒等 );忽视 (忠告等 ) put away 收拾起来,放好;储蓄= put aside put back 放回;拨回钟表的针 put down 放下,使乘客下车;记下,写下;镇压 你的首选资源互助社区 put off 推迟;脱去,除去 put on 穿上;增加 (速度,体重等 )。 上演 put out 伸出;扑灭;生产 put together 组合,拼凑 put up 举起;建造,挂起;提高 (价钱 ) put up with 容忍 put an end/a stop to 制止,使停止 put„ to bed 使„„上床睡觉 put„ to death 处以死刑,杀死 ① It39。 s reported that Changsha has ______ the general plan for city- building. A. put out B. put forward C. put up D. put away ② As teachers and students, we need to ______ our old ideas and prejudices and learn to be more ______ in both our teaching and study. (20xx 江苏宝应学情调查 ) A. put away。 flexible B. put out。 clever C. put down。 clever D. put aside。 flexible ① B ② D put away 收起来; put out 扑灭; put down 记下,镇压; put aside 储蓄;抛在一边。 根据句意,我们应把我们旧的观念和偏见抛在一边,在教学和学习中学会更加“灵活”。 故选 D 项。 【 2】 at the moment 在此刻 I39。 m afraid she39。 s not here at the moment. 恐怕她现在不在这儿。 for the moment 暂时 Stop discussing for the moment, please. 请暂时不要讨论。 at any moment 随时 The firefighters rushed into the burning building though it might fall down at any moment. 尽管正在燃烧的那栋房子随时都可能会倒塌,但是消防员还是冲进了大火中。 the moment 还可以充当连词,引导时间状语从句。 He stopped what he was doing the moment the teacher came in. 你的首选资源互助社区 老师一进来,他就停止了手头上做的事。 The classroom is big enough ______, but we39。 ll have to move if we have more students. A. for the moment B. on the moment C. in a moment D. for a moment A 【 3】 at a speed of 以某种速度 New maglev train nowadays can travel at an amazing speed of 430 km/h. 目前的磁悬浮火车能以每小时 430 千米的惊人速度行驶。 at top/full speed 以全速 He was driving at top speed down the street when the accident happened. 当事故发生时他正沿着街道高速驾驶。 speed up 加速 This drug may have the effect of speeding up your heart rate. 这种药物能够使你的心率加速。 at a safe/dangerous/low/high speed 以安全 /危险 /低 /高的速度 pick up/gather speed 加快速度 【 4】 e across 偶然碰到;走过来;出现于 I came across his name on the list. 我无意中在名单上发现了他的名字。 She came across an old school friend in Oxford Street this morning. 今天早上她在牛津大街碰到一位老校友。 — Have you ______ some new ideas? — Yeah, I will tell you later. A. e about B. e across C. e up。(江苏专用)20xx届高三英语一轮复习精品学案:module4_unit_3_tomorrow180s_world(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。