(江苏专用)20xx届高三英语一轮复习精品学案:module4_unit_2_sporting_events(编辑修改稿)内容摘要:

ward. 我们意识到这个任务并非轻而易举。 ① I recognized him as soon as ② They recognized the need ③ We recognized that 【 8】辨析 divide, separate (1) divide 指把整体“划分”成若干份,常与 into 搭配。 The island is divided into two parts. 这个岛屿被分成两部分。 be divided into halves/be divided in half 分成两份 divide up 分配 divide among/between 在„„之间分配 be divided by 被„„除 (2) separate 把原来连在一起或靠近的“分隔开来”,常与 from 搭配。 Separate the boys who are fighting. 把打架的男孩子们分开。 Physiographically (从地形上 )the United States may be ______ three major divisions (区 ). A. divided from B. divided into C. separated from D. separated into B 【 9】 otherwise adv. 另样;否则,要不然 (相当于 or) You obviously think otherwise. 你的首选资 源互助社区 显然你的想法与众不同。 He reminded me of what I should otherwise have fotten. 他提醒了我,要不然我就把这事给忘了。 We must run, otherwise we will be late. 我们必须跑,否则我们将会迟到。 Do as you are told, otherwise you will be in trouble. 叫你怎么做你就怎么做,否则就有麻烦了。 ① You have failed two tests. You39。 d better start working harder, ______ you won39。 t pass the course. A. and B. so C. but D. or ② Thanks for your kind help! We would have ______ lost the game! (20xx 安徽两地三校联考 ) A. Therefore B. or C. otherwise D. then ① D 考查并列连词的用法。 or 用作并列连词,意为“否则,要不然”,相当于 otherwise; and 意为“和,而且”; so 意为“因此,所以”; but 表示转折,意为“但是”。 ② C 本句为省略句,省略了“ but for your kind help(要不是有你的好心帮忙 )”。 句意为:感谢你好心帮忙,否则我们就输了比赛。 【 10】 transport n. 交通运输系统,运输 v. 运输,输送 Transport to and from the airport is included in the price. 价格中包括往返机场的交通费。 transportation n. 运输业 【注意】 transport 和 transportation 都可以表示“运输”,但 transportation 更多表示运输, transport 同时表示运输工具。 ① We mon people care most for ____________________________. 我们普通人对衣食住行关心最多。 ② The city is __________________ to the stadium from downtown. 本市现在提供从市中心到体育场的免费交通。 ① clothing, food, shelter and transport ② providing free transportation 你的首选资 源互助社区 【 1】 listen to sb. do sth. 听某人做某事 The kids sat in a circle to listen to their mother tell a story. 孩子们 坐成一圈,听妈妈讲故事。 listen to sb. do sth. 指听到某人做某事,强调动作的完整性、真实性;而 listen to sb. doing 也指听到某人做某事,但是强调动作的连续性、进行性。 I listened。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。