水稻纸膜覆盖插秧机改进设计与试验研究硕士论文(编辑修改稿)内容摘要:
g for the paper breakage and paper film rate... 38 Experimental study on paper film slip rate....................................................................... 42 Test methods ......................................................................................................................... 42 Analysis of test results ...................................................................................................... 43 Comparative study of transplanter rice quality ............................................................... 45 Analysis of test results .............................................................................................................. 45 Summary of this chapter .......................................................................................................... 46 Chapter5 Conclusion and prospect....................................................................................... 48 References ............................................................................................................................................. 50 Acknowledgement ........................................................................................................................... 55 Publication during master study ............................................................................................. 56 沈阳农业大学硕士学位论文 1 摘 要 地膜覆盖技术的优点显而易见,对农作物增产起很大作用,但随着普通单体聚乙烯塑料膜的发展及广泛应用,其不容易被微生物降解带来了一系列 包括 对环境污染等 副作用。 针对塑料薄膜的缺点,应运而生出纸质地膜不但继承了塑料地膜的优点 , 有 良好的保温、保水和控草效果 , 、 在稻田中自然降解 、 不会残留 , 不造成环境破坏等优点。 是一种生态友好型种植技术, 可以 有效 地 控制农药使用量, 种植 出无公害的有机稻米。 人工铺设纸膜劳动强度大、劳动效率低还容易在铺设过程中踩出“脚窝”影响纸膜覆盖效果 ,设计机械作业水稻纸膜覆盖插秧机迫在眉睫。 水稻 纸膜插秧机的研制就是解决 了 人工铺设纸膜所带来的问题。 在研制和试验过程中,纸膜水稻插秧机出现了辊轮 支撑臂 刚度不足发生变形、承膜板壅泥严重、插秧机振动影响机架连接处寿命等问题。 本文就是在设计完成的水稻纸膜覆盖插秧机的基础上 ,在研发和试验过程中发现设计的缺陷 、 改进不适 应 实际生产需求的结构、替换不能满足田间作业的 零件,完善纸膜水稻插秧机的功能。 本文主要改进了辊轮支撑系统、承膜板结构,并对改进的主要结构进行分析。 辊轮支撑臂原样机设计是各个辊轮分别安装在以弯曲成直角的钢板 , 没有很好的抗 弯 能力,在应力集中部位发生了严重 变形,改进辊轮支撑臂不但要满足原有功能包括:挂载辊轮,承载辊轮及泥水对其的作用力,还要在受力时不会发生严重变形甚至断裂,简化结构,安装方便。 为此设计了以 方钢管为材料的将所有辊轮及承膜板挂载在同一辊轮支撑臂的支撑平台。 通过 SOLIDWORKS SimulationXpress 对设计完成的辊轮支撑臂进行分析满足正常工作的同时在超出正常工作受力一定范围内 不 会发生变形。 纸膜承膜板在整个纸膜铺放机构中起着承上启下的作用,不但与展膜板配合将纸膜展平还可将水田中不平的淤泥履平,原样机承膜板下沿设计成台阶状很容易在插秧机前 进过程中堆积起淤泥影响铺 插秧机作业,将承膜板下沿设计成圆弧过度就可以避免淤泥堆积,为研究淤泥堆积 受不同半径的圆弧过度板 和 不同速度载荷 影响进行 试验 研究。 试验结果表明 :圆弧过渡板半径可能不是影响试验指标 的显著因素 ;影响试验指标壅泥量的最重要因素是承膜板的行进速度,其次是承膜板载荷。 在插秧机行驶和作业过程中铺放机构中纸辊机架受到插秧机振动影响强烈,这是由于机架本身结构引起的,本文改进了机架尺寸、更换机架固定位置降低了机架振动的摆幅,减少了振动对固定点的影响。 水田作业环境十分恶劣,水田作业有大量的泥沙会侵入轴承内部 ,并且泥水对轴承也有一定的腐蚀作用。 轴承选取必须满足农业机械生产要求,原插秧机轴承没有良好的密封,泥沙进入轴承滚珠周围影响轴承正常工作降低轴承寿命,辊轮轴承必须选用有调心功能 强 并具 有 良好密封 性 的轴承。 铺放机构辊轮转动较慢 轴承选择带有密封圈的深沟球轴承可以满足要求。 在装配完成样机后主要对纸膜铺设质量和机组插秧质量进行试验研究。 田间铺膜 对中文摘要 2 比 试验结果表明 : 样机铺设 纸膜破损率都是随着前进速度增加而上升的,但在一定速度范围内改进前结果优于改进后,正常插秧机行驶速度下改进后纸膜 贴合率指标均优于改进前,这是由于承膜板改 进为圆弧过度不但大大减 少 了壅泥现象还将纸膜更平整的展开。 在不同载荷条件下纸膜破损率与纸膜贴合率改进后也略优于改进前,说明改进后插秧机工作更稳定,适用性更强。 改进后对样机进行纸膜滑移率试验结果表明,影响纸膜滑移率最显著为展膜 辊 与承膜板之间的加紧力,随着夹紧力上升,纸膜滑 移率有上升趋势;其次是机械前进速度随着前进速度提高,纸膜滑移率 也有上升趋势。 展膜辊和压膜辊垂直距离影响小于前两个因素。 本文为了未来实现产品化设计提供了设计依据,为最终水稻纸膜插秧机问世打下基础。 关键词: 铺膜插秧。 改进。 贴合率。 破损率。 滑移率 沈阳农业大学硕士学位论文 3 Abstract TheAdvantages of film covering technology is obvious, playing an important role in crop production, but with the development of a mon single polyethylene plastic filmed and widely used, it is not easy to be microbial degradation brought a series of side effects. In view of the disadvantages of plastic film mulching, emerge as the times require paper not only inherits the advantages of plastic mulch film has good heat insulation, water conservation and weed control effect, the residual natural degradation, not even in paddy field. Artificial labor intensity of paper film, labor efficiency is low also easily in the process of laying on the track of paper mulching effect, design of mechanical operation of rice paper mulch transplanter imminent Development of rice paper film transplanting machine is to solve the artificial paper film problems. In the development and testing process, paper film rice transplanter appeared problems of roller supporting the lack of rigidity of arm deformation, bearing diaphragm mud blocking and serious, connection of transplanting effect of machine vibration life. This paper is to cover the basic transplanter in rice paper film on the design is pleted, found in the development and testing of process design defects, can not meet the demand of the improvement of production structure, can not meet the field operation of replacement parts, improve paper film rice transplanter function. Roller support arm is machine design is all roller wheels are respectively installed on the bending rectangular plate, there is no good flexural capacity, at the stress concentration position of serious deformation, improve the roller support arm should not only meet the original functions include: Mount roller, roller bearing force of mud and water on the the, also not under stress of serious deformation or rupture, simple structure, convenient installation. This design of the square steel tube as material will all roller and bearing plate mounted on the same roller support arm support platform. Carries on the analysis to meet the normal work at the same time beyond the normal working stress is not within the scope of certain deformation by SOLIDWORKS SimulationXpress on the roller design support arm. Paper film bearing plate in the whole paper film shop played the role of connecting link mechanism, not only with the film spreading plate will paper film flattening can also be water field uneven sludge shoe flat, the original machine bearing film plate along the designed steplike easily in rice transplanter and advance the process of accumulation of silt Pu rice transplant。水稻纸膜覆盖插秧机改进设计与试验研究硕士论文(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。