智能传感器的蓝牙技术与soc结构设计(编辑修改稿)内容摘要:
e a voice munication processing standard and the corresponding control mand. (4) choose agreement. Choose agreement and the user39。 s application related, including point to point agreement (PPP), the user datagram/transmission control protocol/Inter protocol (UDP and TCP/IP), target exchange protocol (OBEX), wireless application protocol (WAP), wireless application environment (WAE), vCard, vCal, infrared mobile munication (IrMC). Choose the specific contents of the protocol layer by application system choose according to need In addition to the above agreement layer outside, bluetooth protocol stack shall include two interface: one is the host controller interface (HCI), used for baseband controller, link controller and access hardware state and control regiter, provides the mand interface。 The other is a and baseband processing part directly connected audio interface to transfer audio data. In the bluetooth protocol stack, HCI above part usually use software to realize, including the logical link control and adaptive agreement L2CAP, serial simulation RFCOMM, link management protocol (LMP), telephone alternative agreement and choose agreement。 And HCI the following part use hardware implementation, including baseband agreement and link management protocol (LMP), this part also called bluetooth protocol system structure of bottom hardware modules. 2 bluetooth core protocol stack hardware circuit structure Bottom module is the core of the bluetooth module, mainly by radio frequency (RF) unit circuit, baseband layer (base band) circuit and Link management (LMP, Link Manger Protocol) circuit position. (1) radio frequency (RF) unit RF unit circuit for bluetooth technology provides the munication of the physical layer, also called bluetooth transceiver. Through the GHz microwave, realize data stream filter and transmission. Bluetooth protocol provides information about bluetooth transceiver various technique indexes. (2) baseband layer circuit Baseband layer provides base band digital signal processing hardware, its function is to provide link control, so also known as baseband and link control layer circuit. Through the baseband layer circuit, can build a bluetooth munication work in physical link, thus forming pico (pico). Baseband layer there are two physical link, one kind is connectionoriented synchronous link (SCO) partners, another kind is asynchronous connectionless link (ACL). In addition, baseband layer can also for voice and data packet to provide different levels of forward error correction (FEC) or circulating redundancy check (CRC) processing, and can be used for data encryption. At the same time, baseband circuit layer for different types of data (including transmit information data, link management and control information) to provide specific channel. (3) link management (LMP) circuit Link management circuit also called link manager circuit, the function is to provide link management protocol. Link management protocol used to link to set and control, and is responsible for establishing and cancellation of the bluetooth connection of equipment room, power control and the authentication and encryption, but also control bluetooth device working condition (keep hold, dormancy park, breathing sniff and activities active). The main functions of the link management by software, link manager circuit provide runs on bluetooth device processor of software. Link manager of munication between the agreement called the link management protocol (LMP). Bluetooth technology overall framework to HCI (Host Controller Interface) as a border, divided into hardware module, and the upper software agreement two parts. Bluetooth technology standard, the choice of the USB, UART or RS232 as hardware module and interface between the host. When the bluetooth module with USB, UART RS232 or any one of the interface and host connection, HCI interface upper munication protocol by host is responsible for processing, and the lower HCI interface munication protocol by the module of the baseband layer chip and RF chip is responsible for. According to the bluetooth standard, bluetooth system basic ponents including antenna, transceiver, baseband controller. Therefore, in the antenna, RF receive multiplier and baseband controller, under the support of bluetooth system position can be very flexible, can achieve a variety of different implementation scheme. Embedded bluetooth system is will RF and baseband part integrated on a single chip, single chip bluetooth hardware module structure. In the embedded bluetooth devices, hardware structure can be divided into link manager, link controller and RF module 3 parts, responsible for handling LMP layer, baseband layer and RF layer protocol. Link manager contains processing unit (CPU), memory, etc ponents. Link manager and baseband layer chip known collectively as link controller. RF module contains RF radio frequency emission ponents, and host connected interface is located in the link on the controller. In embedded scheme, bluetooth protocol upper software agreement also all curing in chip, chip through the USB or UART interface and application system connected. Because on chip embedded CPU, so, the embedded bluetooth system is actually a intelligent terminal, suitable for any device with CPU of the system. For example, intelligent sensor, want to add a singl。智能传感器的蓝牙技术与soc结构设计(编辑修改稿)
相关推荐
、云台等进行遥控,以完成对被监视场所全面、详细 的监视或跟踪监视; ● 根据整个系统供电的要求,考虑电源的设定。 ● 系统管理软件还可以设置操作员的控制级别,它决定了操作者可以控制的范围。 系统设置、主管、记录查看 /备份等控制权限也可根据需要分配给不同的操作人。 所有操作的登录 /注销均需使用姓名和口令来完成。 ● 根据别墅的具体情况,我们采用了硬盘录相机进行存储、软件权限管理、 ●
虚拟网电话系统由电信 /铁通实施,也可以租用中继线建立自己的程控交换机系统。 综合布线系统 在小区内建立光纤骨干布线连接小区信息中心和各住宅楼,楼内各单元采用双绞线进行级联。 室内采用 Highman 多媒体家庭布线控制箱实现家庭综合多媒体网络布线。 管理中心 物业管理系统 物业管理系统是小区的智能化程度的集中体现,系统采用当前使用最广、操作直观简 第 7 页 洁的 B/S 技术
2 单片机有 4 组 8位的可编程 I/O 口,分别位 P0、 P P P3 口,每个口有 8位( 8根引脚),共 32 根。 PO 口( Pin39~ Pin32): 8位双向 I/O 口线,名称为 ~ P1 口( Pin1~ Pin8): 8 位准双向 I/O 口线,名称为 ~ P2 口( Pin21~ Pin28): 8位准双向 I/O 口线,名称为 ~ P3 口( Pin10~
机制。 对于避免和防止交通事故,保障国家财产和人民生命安全,提高运输能力和效率,减少汽车因怠速而产生排放增加带来的环境污染,于国于民具有很高的社会效益和经济效益。 本发明组成的 ITS 智能交通系统同现有技术相比具有成本低,反应快,高可靠,自成独立系统不依赖其它系统(比如 GPS 等)的显著特点。 它不是只针对某个方面的应用,而是我 国 ITS 通讯 一揽子解决方案,是全面智能交通 通讯 系统。
平,在网络游戏、网络文学等领域具备国际竞争力,成为国内信息服务业高地。 主要保障举措 加大投入力度 ; 优化市场机制 ; 着力科技创新 ; 强化试点示范 ; 完善政策法规 ; 营造良好氛围 ; 开展统计评估 ; 加强组织领导。 2. 扬州 智慧城市总体规划 (参考文献:《 扬州 市 智慧城市 建设 行动计划 》) 阶段 /方案 /规划分类 方案 /规划内容(重点专项) 重点任务 指导思想
率 36%,打出 800 万造景 广告,项目一期规划有 5 栋 11+1 小高层。 广告语: 中国园林区优品生活住宅 /好房子一辈子 投资商:浙江春辉集团 开发商:江西华意房地产开发有限公司 代理商:丰汇置业 电话: 8471188 项目 12 月 28 日 5 栋小高层售 VIP 卡, 5000 元抵 8000 元, 均价 3200 元 /㎡。 多层仅剩 5 套房源,均价 2600 元 /㎡