定量给料皮带秤控制器软件设计_毕业设计论文中英文翻译(编辑修改稿)内容摘要:
tension automatic adjustment device, transmission and speed reducer, motor, belt。 detection circuit and device mainly prises: weighing sensor and its circuit, speed sensor and its circuit. The controller includes chip and MCU to realize some of the features needed auxiliary circuit, such as a A/D conversion circuit, the expansion of the circuit, the watchdog circuit. After the power is applied, the motor drives the belt begins to rotate, microprocessor according to current operating control motor speed, through a chain drive roller so that the belt running. Materials in the hopper fall on the blanking zone, through a belt delivery to the weighing zone, its weight through belt weigher body delivered to the weighing sensor, the sensor generates a forceelectricity effect, the object39。 s weight is converted into known weight of objects with certain functional relationship between ( generally proportional to the relationship of signal ( voltage ) or current ). The signals are amplified by the amplifying circuit, the filter and then by a / D ( A/D ) for the conversion of digital signals, and then sent to the microprocessor CPU, CPU constantly scan the keyboard and various function switch, according to the 10 keyboard input and various functions of switch state the necessary judgment, analysis, instrumentation software to control various operations. Results of operations to the memory storage device, display, CPU sends an instruction from memory, read to a display, or send the printer to print, at the same time it can according to the operator on the numeric keypad input given value by changing the control of motor speed to achieve the corresponding change of belt transmission speed, which can quickly and easily the realization of industrial control in what people need belt speed. General signal amplification, filtering, A/D conversion and signal processing in various instrument pleted. The microcontroller technology and the development of sensor technology and the wide application of puter technology, electronic product updates speed to change rapidly. In the system design process, in addition to the realization of the basic functions of the system, but also increases the print and munication function, can be achieved and the other machines or equipment ( including the upper PC and a data storage device ) to exchange data. In addition, the system microcontroller section selects the patibility better AT89Series MCU in the system, update time, requires only a little increase of hardware circuit, even just modify system control procedures can be achieved. In addition the, called can have on the practical application of volume overload, but not beyond the scope of the. To sum up, the system39。 s main design idea is : the use of pressure sensors for pressure changes produced by the voltage signal, after the voltage amplifying circuit, and then after analog to digital converter for converting the digital signal, the digital signal into the microcontroller. Single chip microputer after corresponding treatment, reach current referred to the weight of goods, and then displayed. At the same time, according to the operation personnel to the set value, SCM through regulate the speed of the motor to the belt speed corresponding adjustment, in order to work when people want the belt speed. This system is posed of 5 parts: control, measurement, data display, the keyboard part part part part, and power supply circuit. Measuring portion is utilized for weighing sensors to detect the pressure signal, get weak electrical signals ( the design into a voltage signal ), and then through the processing circuit ( such as filter circuit, differential amplifier, ) after treatment, send A/D converter, analog quantities are converted into digital quantity output. The controller portion for receiving from the A/D converter output digital signal, through plex algorithms, the digital signal 11 is converted to objects in the actual weight signal, and stores it in the storage unit. At the same time controller can also accept from the keyboard input of the digital speed numerical order, after the controller corresponding software processing, instruction signal through the I\O port into the thyristor power control circuit, thyristor power control circuit in accordance with the instructions of regulate the speed of the motor, and the motor speed control of belt transmission speed also change accordingly. The controller can also based on extended I/O control, keyboard scan, and then through the keyboard to disperse transfer procedure, to control the whole system data display part according to needs to realize the display function. This system requires the use of single chip puter as the system as the main controller, and the controller based on single chip design, can easily be the puter technology and measurement and control technology are bined together to form a novel, only need to change the software program can update the intelligent measurement and control system. This new type of intelligent instrument in measuring process automation, measurement data processing, control the process convenient and functional diversification, have made tremendous progress. According to the overall design analysis, can be used with EEPROM SCM, because the application is not big, the application directly stored in the chip, not in the external extended memory, so that the circuit can be simplified. Intel39。 s 8051and 8751can be used, here choose ATMENL production AT89CXX series mcu. AT89CXX has two advantages: first, sheet memory storage device with flash memory, so that the writing program more convenient。 second, with a smaller size of the chip, so that the hardware circuit is smaller in volume, and low prices stable performance parison of MCPU,8K 8ROM,256 8RAM,2of 16timer counter,4a8 I/。定量给料皮带秤控制器软件设计_毕业设计论文中英文翻译(编辑修改稿)
相关推荐
套。 10 (三)、钢筋加工机械 选用 GQ40 钢筋切断机 4 台, GW40 钢筋弯曲机 2 台, UN1100对焊机 2台, B 6160交流弧焊机 4台, B 6315交流弧焊机 2台,电动型材切割机 2台进行钢筋制作及加工。 (四)、木工加工机械 选用 MJ104 木工圆锯机 4台,木刨板机 4台,木刨床 4台作为木模加工机械。 (五)、垂直运输机械 选用 25吨吊车
83。 34 定子结构尺寸设计 37 38 左配油盘封油区夹角 38 左配流盘 V形尖槽 39 左配流盘结构尺寸设计 40 ****本科毕业设计(论文) 目录 41 42 材料选择 42 花键轴段的设 计 42 校核轴段花键的挤压强度 44 轴的结构设计 44 轴上载荷分析 46 按扭转切应力校核轴的强度 47 校核轴的刚度 48 49 泵体材料选择: 49 左泵体结构设计 50 右泵体结构设计
整个工程的采暖、通风、防尘、防潮设计。 设计参数 (1) 室外设计计算参数 冬季:计算温度: – 9℃ (2)室内设计温度: 18℃ 设计依据 (1)《民用建筑照明设计标准》 (GBJl33— 90) 12 (2) 有关的设计条件 设计范围 包括本工程的供配电、照明、火灾报警、 电话系统等 接地系统 消防系统、供电照明系统均与防雷接地共用接地体 , 接地电阻小于 1 欧姆。 防雷接地
本工程所有建筑均属于三类防雷建筑。 采用 TNCS 与 TNS 相结合接地方式,并进行总等电位联结。 防雷、防静电、工作及保护接地共用一套接地装置,综合接地电阻值要求 1,本工程利用建筑物基础作为接地体。 在屋顶设避雷带,沿建筑物四周设避雷引下线,所有避雷系统均利用建筑物钢筋构成。 本工程在各单体 进线处均设有总等电位联结箱,浴室各个卫生间内均设局部等电位联线箱。
根据当地镇村组织的要求, 黄砂桥 位于 省道 ( S226) 黄砂口村处横跨定河。 投资估算、 资金 筹措 及工期安排 投资估算 本项目投资估算根据交通 运输 部 [2020]82 号通知颁发的《公路基本建设工程投资估算编制办法》和《公路工程估算指标》及江西省交通厅 [2020]10 月 15 日起执行的 《江西省〈公路基本建设工程概预算编制办法〉补充规定》编制。 估算费用按 三
77。 10 钢尺量两端、中间各一点,取最大值 排距 177。 5 保护层厚度 基础 177。 5 钢尺检 查 柱、梁 177。 3 钢尺检查 板、墙 177。 3 钢尺检查 绑扎箍筋、横向钢筋间距 177。 10 钢尺量连续 5 档, 取最大值 钢筋弯起点位置 177。 15 钢尺检查 郑州市第一建筑工程集团有限公司 19 河南省建筑业 10 项新技术应用示范工程验收资料 之三 施工组织设计