洮南矿矿井设计_煤矿毕业设计说明书(编辑修改稿)内容摘要:
.......................................................... 123 初选水泵 .................................................................................................. 123 管路布置 .................................................................................................. 125 管道特性曲线及工况点确定 ..................................................................... 126 检验计算 .................................................................................................. 129 技术经济指标计算 .................................................................................... 131 第 3 节 水泵房及水仓 ......................................................................................... 132 水泵房 ...................................................................................................... 132 水仓 .......................................................................................................... 133 第 4 节 技术经济指标 ......................................................................................... 134 第 9 章 技术经济指标 ................................................................................................. 135 参考文献 ..................................................................................................................... 138 感 谢 ....................................................................................................................... 139 河北工程大学毕业设计 6 摘 要 这次毕业设计我们所做的是河北金 牛能源有限公司 下属的 洮南 矿矿井设计。 在 这次毕业设计之前,我们在 王同杰 老师的带领下到 邢台 矿进行了为期一个月的生产实习。 在这次生产实习中,我们收集了大量的设计资料并结合生产中现场工作的经验,完成了对 洮南 矿矿井的初步设计。 并且在这次生产实习中,更加深了我们对今后所从事的工作的了解;同时,我们也获得了先进的设计思想及设计中所涉及到的在学校里所学不到的现场工作经验,为毕业设计的顺利进行打下了坚实的基础。 本次毕业设计是我们毕业设计小组所有成员共同努力的成果。 是小组成员经过共同的研讨,反复计算并比较后共同确定的,是我在四年大学学习的结晶。 洮南 矿矿井设计共 包括以下几部分: 、地质等基本情况的概述。 ,矿井生产能力及服务年限的确定。 ,包括水平的划分,井筒位置的确定,经济比较部分,矿井延深方案的确定,采区的划分,井底车场线路计算,硐室布置及井底车场的通过能力计算等部分。 ,工作面生产程序的确定以及采区车场的设计计算等部分。 、运输、通风、排水方式的确定及其所用设备额选型计算与相关的硐室布置等。 由于本人水平有限,又没有长时间的生产和工作经验,所以在设计 中必定有很多不理想的地方,希望各位老师与同学多多指教,本人感激不尽。 关键词 :地质、井田、储量、矿井年产量、开拓、采煤方法、通风、提升、瓦斯、排水。 河北工程大学毕业设计 7 Abstract The graduation project we have done is Hebei Jinniu Energy Co., Ltd. under the the Taonan ore mine design. In this graduation project, we in Xingtai mine under the leadership of WangtongJie teacher conducted a monthlong production practice. This production practice, we collect a lot of design information bined with the experience of the production site to plete the preliminary design of Taonan ore mine. And in this production practice, deepened our understanding of the future are engaged in work。 the same time, we also get experience in the field of advanced design concepts and design to learn in school, laid a solid foundation for the smooth graduation project. The graduation project is the joint efforts we graduated from the design team members. The group members through mon seminars, repeatedly calculated and pared to determine the crystallization of my fouryear university study. 1. Summary of the mine, this chapter mainly introduces the position, geology and conditions of the coal seam. 2. Mine development. This chapter extrapolates among other areas, reserve, serving limits, working system, spot of the draft, selection of level, further drift of mine, panel division and underground station. of mining districts and retreating technology. This chapter explains the general situation of the mining district, technology and techniques of the working face, roadway layout and operation system in the mining district, the design of the mining district station, cave layout and the schedule for drainage and mining in the main mining district. 河北工程大学毕业设计 8 system of the mine, this chapter states transportation, haulage, ventilation and drainage systems of the mine and the selection of equipment used in the system mentioned above. mine production, transport, ventilation, drainage patterns to determine the amount of equipment used selection calculation of the relevant chamber arrangement and so on. Due to my limited ability, not a long period of production and work experience in the design must be a lot of undesirable fellow teachers and students a lot of advice, I appreciate. Keywords: annual production of geology, Ida, reserves, mine development, mining methods, ventilation, upgrading, gas, drainage. 河北工程大学毕业设计 9 第 1 章 矿区概述及井田特征 第 1 节 矿区概述 洮南矿位于河北省邢台市西南部 30km 处,邢台地区白城市与邯郸地区武安市的接壤地带。 井田大部分属白城市显洮南县管辖,只有东南少部分属武安市邑城乡管辖。 地理坐标为:东经 106176。 03′ 03″~ 106176。 06′ 00″,北纬 36176。 33′ 33″~ 36176。 35′ 00″。 矿区范围 矿区东以 F5断层为界,和四平矿四井 相邻;北部以 F1断层为界;南部东边以 F6为界,界线以北为上关煤矿;西边以 F7为界;西部以 F8断层。 采矿许可证许可范围具体由 52 个坐标点圈定,见表 11。 井田东西宽约 4km,南北长约6km,面积。 矿区范围内有沙河市恒利煤矿和孟石岗煤矿。 开采深度由 +238m 至 400m 标高。 交通条件 矿井东距京广铁路沙河车站 25km,距矿山村支线铁路权村车站 6km。 煤矿外运铁路专线从权村车站接轨延伸至工业广场。 井田内有两条主要公路穿过,邢台至渡口公路从东向西经过井田北部;邢台至都党公路从井田 东部通过,经工业广场伸向西南方向,通往武安市和山西省。 总之,矿区内公路四通八达,交通非常便利。 见矿区交通位置图(图 1河北工程大学毕业设计 10 图 洮南矿交通位置图 自然地理地貌 地貌 洮南矿区位于太行山东麓山前地带,呈山前台地地形,并被北西向次一级分水岭分割,最高标高 ,位于孟石岗附近,最低标高 ,位于得义东侧河床,全区地势西高东低,起伏较大。 按地貌成因类型划分,本区为冰碛台地地形。 井田内发育有三级台地,自下而上依次为:漫滩及一级台地、二级台地和三级台地。 漫滩及一级台地由全新统冲 洪积物覆盖;二级台地由上更新统黄土及洪冲积卵石层组成,具二元结构;三级为扇形台地,全区标高在 300~ 320m 左右,上部台地由中更新统红粘土卵砾石层组成,其下为下更新统间冰期的冰水泥积物及冰碛泥砾。 河北工程大学毕业设计 11 水文 井田内地表水系不发育,仅有季节性小溪共三条,雨季有水,旱。洮南矿矿井设计_煤矿毕业设计说明书(编辑修改稿)
相关推荐
流动儿童接受教育的环境。 如何改进流动儿童学校的教学质量以及它们如何面对在未来发展中的种种困境。 第三阶段是从 8 月上旬到 10 月中旬,我们对前面两个阶段的成果进行了总结,并通过深入的思考和研讨,对前期取得的资料进行了取舍和组织,并且在指导老师的大力支持和修改、完善后形成最终的研究报告。 (二)研究的基本假设 本课题的研究基于这样一种视角:一个学校教学质量的好坏,直接影响 其生源及未来的发
,应用面狭窄,高指标专用品种少等问题(目前,日本、英国都 有 300— 400 个品种,而我国仅有 5060 个品种); 在经营过程中,尤其是外贸出口,多头经营、竞相压价,造成恶性竞争(根据相关材料显示,我国活性炭 的价格只有国际市场价格的三分之一,甚至更低); 在生产资源利用方面,我国部分地区还是将整片山林承包给个 22 人,个体企业主为追求最大利润,只考虑到眼前利益
年降到最低点,到 2020 年出现了较大幅度的上升, 2020 年 111月,产量同比增长为 26%左右,预计全年的产量增速在 25%左右,比上年有较大的增长。 19 图 2 20202020 年瓶(罐)装饮用水产量及其增速 050010001500202025002020 2020 2020 2020 2020万吨0 . 0 05 . 0 01 0 . 0 01 5 . 0 02 0 . 0
置及尺 寸是否准确无误,模板支撑是否牢靠,接缝是否严密。 梁柱接头处是模板施工的难点,处理不好将严重影响混凝土的外观质量,此处不合模数的部位用一定要精心制作,固定牢靠,严禁胡拼乱凑。 所有模板在使用前都要清理干净并涂刷隔离剂,破损的模板必须淘汰。 混凝土施工时安排木工看模,出现问题及时处理。 模板施工中一定要加强安全管理,模板施工前要有专项方案并经审批。 施工方案 混凝土采用 商品混凝土
............................................................ 226 石门镇镇中心集镇安置区 ............................................................................... 228 古城街前进村安置小区 ...........................
经验丰富 中国邮政的前身成立于新中国成立之初, 较之 2020 年新成立的 “ 洛阳才子 ” ,在经营管理和专业技术方面有 着不言而喻的优势。 且多年的经验使其有着成熟的营销模式和稳定的客户群。 认清 了 中国邮政的这些优势,便于我们在今后的业务开展过程中发挥自身优势,规避风险,避免与对方硬碰。 ( 五 ) 企业内外部 环境分析 外部环境分析 ( 1) 竞争环境 竞争是市场经济的基本特点