新久煤矿二井09mt_a通风设计毕业设计说明书(编辑修改稿)内容摘要:
ield错误 !未定义书签。 Survey of mining area ....................................................... 错误 !未定义书签。 Traffic location ........................................................... 错误 !未定义书签。 The topography of the terrain ..................................... 错误 !未定义书签。 Rivers ......................................................................... 错误 !未定义书签。 Meteorology ............................................................... 错误 !未定义书签。 Mining economy ........................................................................................ 2 Water and Power ........................................................................................ 2 Current Situation of the local environmental protection ............................ 2 Geological Characteristics of the Coal Field..................... 错误 !未定义书签。 Geological structure ................................................................................... 3 Coal bed and coal quality ........................................................................... 4 Degree of geological exploration ............................................................... 5 Mine safety profile ............................................................................................ 5 Hydro geological characteristics .............................................................. 5 Gas storage conditions ............................................................................... 6 Coal dust explosion hazards and coal explosion prevention measures ...... 6 Nature of coal ............................................................................................. 7 Treatment of underground high temperature ............................................. 7 2 Mine reserves and production capacity................................................................ 8 Mine field level and reserves ............................................................................ 8 State Of Mine ............................................................................................. 8 Reserves ..................................................................... 错误 !未定义书签。 VIII Mine production capacity and service life ........................................................ 8 Mine system ............................................................................................... 8 Mine production capacity and service life ................................................. 9 3 Mine development .................................................................. 错误 !未定义书签。 Mine development ............................................................. 错误 !未定义书签。 Open up the way......................................................... 错误 !未定义书签。 The number of locations use of the wellbore and equipment错误 !未定义书签。 High level and phase of the vertical .................................. 错误 !未定义书签。 Level ........................................................................... 错误 !未定义书签。 Mining level of the main open up roadways .............. 错误 !未定义书签。 Mine band connection ..................................................................................... 21 Striped partition ........................................................................................ 21 Order and continue in stripe mining plan ................................................. 22 4 Ventilation design for the band ........................................................................... 23 Striped ventilation ........................................................................................... 23 Overview of the band ............................................................................... 23 Ventilation design principles and requirements of the band .................... 23 Striping parameters .................................................................................. 23 Preparation roadway layout of the band................................................... 24 With a production capacity of the region ................................................. 24 The ventilation system in coal mining face.............................................. 25 belt region production capacity ................................................................ 25 Design of local ventilation .............................................................................. 26 Local ventilation system design principles .............................................. 26 Local ventilation methods ........................................................................ 26 Selection of air duct ................................................................................. 27 Selection of auxiliary fan ......................................................................... 28 IX Local ventilation safety measures ............................................................ 31 5 Design of mine ventilation ................................................................................... 33 Gas cases of spontaneous bustion of coal dust ......................................... 33 Development of mine ventilation system ........................................................ 33 Mine Ventilation System Requirements .................................................. 33 Selection of mine ventilation system ....................................................... 34 Determine how the mine air ..................................................................... 37 Calculate the total air flow and distribution of the mine ................................. 38 Calculation of air flow ............................................................................. 38 Air distribution and regulation ................................................................. 40 Wind speed calculation .....................。新久煤矿二井09mt_a通风设计毕业设计说明书(编辑修改稿)
相关推荐
和健全安全管理各种台账,强化安全管理工作,负责各种安全记录资料的填制、收集工作。 ○ 5 强化工地施工的环保意识,积极配合地方政府做好对城市环保有影响的工程的有效防护措施。 ○ 6 监督开展安全教育工作,做好分部 (分项 )工程技术安全交底工作。 ○ 7 监督和认真执行安全、保卫、消防、环保法规、条例、标准和规定的实施。 生产准备 安排好冬施期间施工计划,明确冬季施工项目,落实到各承包单位
合理统一,主要解决剩余索取权与控制权的合理配置问题 [2]。 新会计准则构建和实施的决策有用导向,能够方便机构投资者的发展,促进财务控制权市场的竞争并进而发挥资源配置作用;改善企业和银行都存在的“预算软约束”现状,发挥债权人治理机制。 尤其是在我国股权分置改革即将完成,股票市场进入全流通时代和主要国有商业银行进行股份制改造并成功上市的背景下
电话用户 万户,增长%;宽带网用户 万户,增长 %。 2020 年主要运输工具运输量 指标 单位 运输量 比上年177。 % 客运量 万人 铁路 万人 公路 万人 民航 万人 客运周转量 亿人公里 铁路 亿人公里 公路 亿人公里 民航 亿人公里 货运量 万吨 铁路 万吨 公路 万吨 民航 万吨 货物周转量 亿吨公 里 铁路 亿吨公里 公路 亿吨公里 民航 亿吨公里
化问题。 国外经验表明:能耗最优化研究可以使输气管道的运行能耗在一定程度上降低。 目前,国外涉足油气管道行业的专业软件开发公司已经拥有了干线输气管道或官网优化运行的商品软件,这些优化软件已经在国外一些干线 输气管道或者管网上得到了应用。 近些年来,国外的输气管道优化运行方面的发展趋势是干线输气管道上推广应用这项技术,并将进一步研究管网优化运行技术和非稳态优化运行技术。 美国的
中国特色社会主义伟大旗帜,以邓小平理论、“三个代表”重要思想、科学发展观为指导,解放 思想,改革开放,凝聚力量,攻坚克难,坚定不移沿着中国特色社会主义道路前进,为全面建成小康社会而奋斗。 此时此刻,我们有一个共同的感觉:经过九十多年艰苦奋斗,我们党团结带领全国各族人民,把贫穷落后的旧中国变成日益走向繁荣富 强的新中国,中华民族伟大复兴展现出光明前景。 我们对党和人民创造的历史伟业倍加自豪
工作面,但需要边界准备专用回风巷上山,增加了巷道掘进、维护费用。 “ U”型通风系统布置方便,通风简单,工作面可采用后退式回采。 上、下顺槽在煤体中维护,漏风量小,风流流动为上行方向,上、下顺槽布置于煤体中,漏风量小;瓦斯自然流动方向和风流方向一致,有利于较快降低工作面瓦斯浓度。 开掘井巷费用低,同时结合煤层的储存形式,本设计在回采工作面应用“ U”型通风系统。 12 4 掘进通风系统设计