基于蓝牙技术智能灯光控制设计毕业论文外文翻译(编辑修改稿)内容摘要:

mobile phone creator Ericsson in 1994 as a method to let laptop puters make calls above a mobile phone. As then, numerous anizations have signed on to create Bluetooth the lowpower thoughtless wireless average for a broad variety of devices (LeVitus, 216220). Industry spectators anticipate Bluetooth to be fitted in billions of devices through 2020. Discussion Developed by engineers at Ericsson in the late 1990s, Bluetooth is more and more special technology that facilitates thoughtless wireless munication among a diversity of electronic devices. Its mainly important aspect is that it permits devices to “talk” (relocate and orchestrate data) wirelessly with each other, terminating the requirement for the outwardly continuous tangle of cables, cords, and adapters important for numerous today’s expertise. The Bluetooth Special Interest Group (SIG) was formed in 1998 to manage the expansion and prologue of Bluetooth knowledge (LeVitus, 216220). IBM, Intel, Toshiba and Nokia connected with Ericsson as the beginning associates of the SIG, and in excess of 8,000 anizations have contracted since. So as to trade products with the Bluetooth requirement and logo, manufacturers should be associates of the SIG and the devices should meet welloutlined credentials. These procedures make sure that Bluetooth wireless devices international may converse with each other, apart from pany or nation of derivation. l Speed and Range Range is application specific and although a minimum range is mandated by the Core Specification, there is not a limit and manufacturers can tune their implementation to support the use case they are enabling. Range may vary depending on class of radio used in an implementation:  Class 3 radios – have a range of up to 1 meter or 3 feet  Class 2 radios – most monly found in mobile devices , have a range of 10 meters or 33 feet  Class 1 radios – used primarily in industrial use cases , have a range of 100 meters or 300 feet That creates Bluetooth technology appropriate for transporting lesser files for example cell phone contracts and text documents, also as lowerquality pictures and audio (Kumkum, 160162). At these relocate speeds。 Bluetooth may not actually deal streaming video or highquality pictures and audio at this end, except this possibly will alter in the future when fresh Bluetooth standards are initiated. Simple and Competent to Utilize Creating and configuring Bluetooth allowed devices is moderately unplicated, with little extra motion than acquire the two devices close to one another and twist them on. There is no requirement to mount drivers or further software to plex an adhoc, personal wireless work (Kumkum, 160162). It has a uniform anization, meaning that some two wireless products attributing Bluetooth technology, despite of product or nation of origin, have the ability to converse faultlessly with each other. Common Applications One of the mainly ordinary applications of Bluetooth is handsfree cell phone procedure. About each cell phone fashioned in our day has constructed Bluetooth (Meier, 1520). Only pair phone with a Bluetooth headset, and he may talk whereas his phone is in his purse or pocket. Several of today’s car stereos as well have fitted Bluetooth for handsfree calling in his vehicle. And if his vehicle has a plant stereo or grownup aftermarket one that he merely doesn’t wish to restore, he may yet like handsfree identifying with a Bluetooth car kit. Bluetooth Bluetooth is the fresh Bluetooth wireless typical adopted through the Bluetooth SIG on April 21, 2020. The fresh standard supports elevated data remove speeds and constructs ahead the preceding standards (Meier, 1520). With its superior speed, the technology has the probable to transfigure the consumer electronics industry. l Technology PROTOCOL The Bluetooth technology standard is set to make different applications can “municate” with each other. Remote devices in munication use the same protocol stacks, while different applications need different protocol stacks. Bu t, every application needs the data link layer and physical layer of the Bluetooth technology. The whole Bluetooth protocol stacks is shown as blow. Not any application should use all of the protocols, but one or some lists of these. The chart below shows the relationship between protocols, but the relationship may change in some applications. The pletely protocol stacks include Bluetooth special protocols (like LMP and L2CAP) and not special ones (such as OBEX and UDP). The basic principle for designing protocol and protocol stacks is that use existing high level protocol as possible, ensure the bination of protocols and Bluetooth technology, and take the best advantage of the software and hardware which adapt to the Bluetooth technology standards. The open Bluetooth technology makes device manufacturers can choose protocols freely as they like or used to. The protocols in Bluetooth protocol system There are four layers in Bluetooth protocol system according to the SIG  Core protocols  Cable replacement protocols  Telephony control protocols  Adopted protocols Except the protocol layers above, the standard also defines Host/Controller Interface (HCI),which provides mand interface for baseband controller, connection manager, hardware state and control register. Bluetooth core protocols consist of the special protocols made by SIG. Most Bluetooth devices need core protocols, while other protocols are used depend on needs of the application. After all, cable replacement protocols, technology control protocols and adopted protocols based on the core protocols constitute the objectoriented protocols.  Core protocols  LMP (Link Management Protocol) l Used for control of the radio link between two devices. Implemented on the controllers. It identifies and。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。