180万吨矿井初步设计毕业设计(编辑修改稿)内容摘要:

..................................59 三、预防井下火灾的措施 ..........................................................................................62 四、预防井下水灾的措施 ..........................................................................................64 五、矿井安全出口 ....................................................................................................65 六、自救器及安全仪器配备 ......................................................................................65 七、反风措施 ...........................................................................................................65 第十章 经济部分 ..................................................................................................................67 第一节 矿井设计概算 ....................................................................................................67 一、井巷工程概算的编制依据 ...................................................................................67 二、井巷工程概算的编制方法 ...................................................................................67 三、矿建工程费用的计算方法 ...................................................................................68 第二节 计算劳动定员和劳动生产率 ...............................................................................68 一、定员范围 ...........................................................................................................69 二、定员依据 ...........................................................................................................69 三、定员方法 ...........................................................................................................69 四、计算劳动生产率 .................................................................................................70 参 考 文 献 ...........................................................................................................................71 致 谢 ....................................................................................................................................72 摘 要 古书院矿位于位于山西省东南部,沁水煤田的东 南缘,面积 平方公里。 主要开采 3 号煤层。 3煤层埋藏较浅,瓦斯含量低。 各层煤自燃性不强,属于不易自燃煤层。 本设计的对象是 3 号煤层。 矿井工业储量 22113 万吨,可采储量 万吨。 矿井设计生产能力 180 万 t/a。 3 号层煤为 米厚,倾角 3 到 5 度,距地面 160 米左右。 采用斜井、集中大巷开拓方式。 沿井田走向布置三条大巷,轨道大巷、运输大巷布置在岩石中,轨道大巷沿 3 号煤层底板布置。 矿井移交生产至达到设计能力时,共开凿 3 个井筒,即主、副斜井、回风立井。 主斜井装皮带,副斜井铺轨道,工业广场位于井田 中部。 本井田 3 号煤层划分为 4 个采区,采 用带区式准备。 设计采用倾斜长壁采煤方法开采。 回采工艺采用后退式、综合机械化放顶煤采煤法。 作业制度为“四六制”,三班采煤、一班检修。 工作面的设备有双端可调双滚筒采煤机、液压支架 、可弯曲刮板运输机、破碎机、转载机等。 采空区采用全部跨落法管理顶板。 矿井运输大巷采用皮带运输作为主运输,轨道大巷采用矿车作为辅助运输,通风方式为中央并列式通风。 矿井总风量为 ,主扇工作方式为机械抽出式,风机型号为: , n=740r/min,电机功率为390KW。 关 键字:斜井 带区式 倾斜长壁采煤方法 Abstract Gushuyuan Coal Mine place in Shanxi Province is located in the southeast, southeast edge of Qinshui Coal, Coal Mine area of square kilometers. Major coal mining on the 3rd. 3 coal seam buried in shallow, low gas content. Spontaneous bustion of coal at all levels is not strong, spontaneous bustion of coal is not easy. The design of the target coal seam is on the 3rd. Mine industrial reserves of million tons, recoverable reserves of 164,317,500 tons. Mine design capacity of million t / a. Coal on the 3rd floor meters thick, 35 degree angle, about 160 meters from the ground. Focus on the use of inclined to open up the way roadway. Along the mine field to the three main roadway layout, the track roadway, transportation roadway layout under coal seams in the rock on the 3rd, the wind back to the 3rd Lane along the coal seam floor layout. Mine the transfer of production capacity to meet the design of drilled shaft 3, that is, Lord, Viceinclined, return air shaft. The main belt inclined shaft installed, the Deputy Shop inclined orbit. The transfer of the total mine production for a twoyear period. Industry Square is located in the central mine. The No. 3 coal mine is divided into four mining areas, with a zonetype preparations. Designed with inclined long wall coal mining method. Extraction process using backstyle, integrated mechanized sublevel caving mining method. Operating system as system 46, three coal mining, a group of maintenance. Equipment face a doubleside doubledrum shearer adjustable, hydraulic support, flexible scraper plane, broken machines, etc. are reproduced. Goaf method make use of all crossloading roof management. Transportation Roadway mine used as a main transport belt transport track roadway tub used as a supplementary transport, ventilation tied for the central ventilation. Mine the total wind capacity of / s, the main fan for the work out of style, fan model: , n = 740r/min, electric power is 390KW. Keywords: inclined shaft type bands inclined long wall mining method 太原理工大学继续教育学院 毕业设计说明书 1 第一章 井田概述和井田地质特征 第一节 矿区概述 一、矿区地理位置 古书院矿位于山西省东南部,沁水煤田的东南缘,其地理座标为东经 112176。 48′34″ 112176。 52′ 56″,北纬 35176。 30′ 33″- 35176。 34′ 15″,行政隶属晋城市管辖。 位于晋城市城北。 该井田西受白马寺断层控制,北与凤凰山、王台铺井田相接,西南为北岩井田,井田东部有太原-焦作铁路经过。 本矿专运线 5公里与晋城北站接轨,向南于月山,新乡分别与焦枝,京广线相通。 207 国道从井田西部经过,与 207 国道平 行的 是 晋(城)-长(治)高速公路 、 晋(城)-阳(城)、晋(城)-焦(作)、长(治)-邯(郸)高速公路 均 已建成通车;省级公路四通八达。 交通甚为方便(见图) 二、矿区地形地貌 井田内地形以构造剥蚀中低山为主。 西北高,东南低,最高峰方山海拔 米,一般标高在 700- 800 米之间。 由方山向东南经向马寺山、大岭头一线为地表分水岭,其东北部为北石店盆地,西南部为钟家庄盆地,地表北部一般为基岩出露,南部为黄土覆盖,地貌属低山丘陵。 太原理工大学继续教育学院 毕业设计说明书 2 三、矿区水文 简况 晋城市属黄河流域沁河水系。 井田内无常年迳流的地表水系,均为季节性河流。 雨季流量较大,西南部大气降水经晋城西河、古书院河、晋城东河流入钟家庄盆地,经白水河流经孔庄注入丹河,东北部大气降水汇入刘家川河、司徒河向东于背荫汇流经水东注入丹河。 四、矿区的气候 本区属太行山西侧山间盆地,属暖温带大陆性气候。 四季分明,温和宜人,日照充足。 秋季多西北风,春夏季多东南风。 年最小降雨量 296mm,最大降雨量 1010mm,平均。 降雨量集中在 9 三个月。 蒸发量一般为降雨量的 2- 3倍。 气温一般较 高,日最高温度达 ℃,最低气温- ℃,平均气温达 11℃。 无霜期较长,全年约 180 天。 冻结期为 11 月至次年 2月,最大冻土深度一般为 43cm,最大积雪厚度为 21cm。 风力不大,一般 3- 4 级,最大 6级。 五、矿区的地震资料 历年地震资料及文献记载,晋城地区未发生过 5级以上的破坏性地震。 外围强震的波及曾对本区造成房屋倒塌,人畜伤亡。 据山西省地震局 1978 年省震字第 29 号文《关于颁发山西省地震基本烈度区划图及说明》的通知,将本区划为六度地震烈。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。