毕业设计(论文)_从福尔摩斯侦探集看维多利亚时期伦敦的形象(编辑修改稿)内容摘要:
ccording to Christopher Morley and Steven Rothman‘s study, the author got some information about Arthur Conan Doyle. Andrew Smith, it found the gradual emergence of a selfconscious scrutiny of gender in London from the tales of Sherlock Holmes as the author did. Joshua Hammer introduced the stories of Arthur Conan Doyle‘s writing the tales of Sherlock Holmes to the public. Jeffrey Meyers and Valerie Meyers showed the social responsibility of Holmes. And the Inter web, , also produces the key points about Victorian Era and Arthur Conan Doyle. The Chinese scholars did many systematic studies, too. Chen Xiaolan studied deep relationship between the cities and the detective novels in her thesis, Detective Novels and the control of Cities: A Study Based on Conan Doyle’s Novels. Yu Fang found the caring for humanity of Sherlock Holmes. Wang Ting chose to understand Victorian Era with reading Conan Doyle‘s tales of Sherlock Holmes in her study, and introduced Holmes‘s influences to the Britain populace. Zhang Jiong tried to inquire into the image of Holmes by the details. Gao Jie described the detectives in detective literatures as heroes in the thesis Discussion on the Detective Literatures from the View of Culture. The side of colonialism in London is presented by Liu Xiaohan. Chen Zhang pointed An Analysis on Victorian London in Conan Doyle‘s Tales of Sherlock Holmes 4 out that the real cities and the cities in literary works exist side by side and play a part together in his Writers and Cities: the Writing Characteristic of the Cities in Literatures. Li Zeng and Long Ruicui discussed the classes in Victorian Era in their study. There is no doubt that the previous scholars did good jobs in their works, but their studies failed to show the London in Victorian Era from the tales of Sherlock Holmes. This thesis will have the aid of the textual analysis, and try to find out the clues from the work, presenting the London where the gentleman in Victorian Era, Holmes lived. And it will make a full understanding to the London of Victorian Era. It is significant to study the London of Victorian Era in the tales of Sherlock Holmes. This thesis will recover and reunderstand to the history. The author wants to show respect to the writer and his work. At the same time, it is a salute to Mr. Sherlock Holmes across time and space. And this thesis will be divided into four parts as follows: The first part mainly introduces the writer, Conan Doyle, the tales of Sherlock Holmes and shows this thesis‘ background, significance and Structure. The second part is literature review. It concludes the previous studies not only on the tales of Sherlock Holmes, but also on London in Victorian Era. It will summarize the experiences of Chinese and foreign scholars in this field and present their advantages and short points. The next part is the key ponent of this thesis. The third part is an analysis on Victorian London in Conan Doyle‘s tales of Sherlock Holmes. And it will be divided into four parts. The first part in it is the basic image of Victorian London. It analyzes the basic appearance of the London in Victorian Era from all the descriptions in the work. In other words, it presents the surface of the London in that time. The second part in it is the defects of Victorian London. In this section, it will show the society problems in London of Victorian Era, presenting their influences to the city, and making a decipherment to the defects in the city. The third part in it is the advantages of Victorian London. According to the large numbers of descriptions in Conan Doyle‘s tales of Sherlock Holmes, it analyzes the advantages in London, and tries to find out the invisible side of the city in Victorian Era. The fourth part is an overall image of Victorian London. It will summary the image of Victorian London according to the analyses of Conan Doyle‘s tales of Sherlock Holmes in this thesis. The last part serves as a conclusion of this thesis and presents a concrete Victorian London. 宁波大学科学技术学院本科毕业设计(论文) 5 2 Literature Review Previous Studies on the London of Victorian Era This thesis refers to the London of Victorian Era, and mits to recover the original image of the London in Victorian Era. So it is necessary to summarize the previous studies on the London of Victorian Era. The foreign scholars make full studies in the field. Sally Mitchell focuses on the daily Victorian life. Her study states small and provides the detailed and perfect data about the Victorian Era in all directions between 1837 and 1901. As the writer said in her work—Daily Life in Victorian England, ―In addition to conveying the concrete and physical texture of daily life, I have tried to answer many of the questions that high school and college students generally ask and to clear up some mon misapprehensions about the class system, money, marriage, the laws of inheritance, and the social importance of religion.‖ (Sally Mitchell, 1996: 15) So there are enough evidences of the London in Victorian Era in this book. Lee Jackson studies the Victorian London with an interesting method. His monograph, A Dictionary of Victorian London: an AZ of the Great Metropolis, lists the most abundant particulars in Victorian London brilliantly and effectively. He expresses in the monograph, ―I hope many of the topics covered will be surprising: from plasterofparis pornography hawked on the streets, to the world39。 s first gaspowered traffic light。 and I hope modern readers will sympathize with the pedestrians plagued by prams, and infuriated by the postal service, even if our forebears had slightly higher standards.‖(Lee Jackson, 2020: 12) It must make a help to study the London of Victorian Era. By the way, the website ―Wikipedia‖ provides the related information, too. The domestic scholars‘ studies in this field are meri。毕业设计(论文)_从福尔摩斯侦探集看维多利亚时期伦敦的形象(编辑修改稿)
相关推荐
IV特性曲线 图 28 不同温度下的 PV特性曲线 综上,太阳能电池板的输出特性具有以下特点: ① 太阳能电池的输出特性近似为矩形,即低压段近似为恒流源,接近开路电压时近似为恒压源; ② 开路电压近似同温度成反比,短路电流近似同日照强度强成正比;太阳能电池板的输出功率随着光强和温度成非线性变化; ③ 输出功率在某一点达到最大值,该点即为太阳能电池板的最大功率点(MPP, Maximum
83。 41 安全消防设施 42 4. 7 基础及主体施工阶段的平面图布置 42 第 5 章 特殊气候条件施工技术质量保证措施 43 夏季高温施工 43 雨季施工 43 第 6 章 各项保证措施 44 质量保证措施 44 安全生产管理措施 45 防止人员高空堕落的措施: 45 防止物体堕落措施 45 防止触电的措施 46 塔吊使用主要安全措施 46 确保工期的管理措施 46 现场文明施工管理措施
; VR公交车平均运行速度( km/h); lI线路 I 的长度( km); I ijl 线路 I 站点 i,j 间的距离( km); I ij 经过节点 i,j 的客运需求量在线路 I 上的分配比例; R线路集合;AI线 路 I 的节点集合。 城市公交线网优化方法很多 ,但大多数方法仅限于理论研究 ,很难在实际工程中操作。 相比较而言 ,王炜教授于 1989 年提出的“逐条布设
............................ 12 汝城县农村中学体育比赛开展 现状 .............................................................. 12 汝城县农村中学课余体育训练开展 现状 ...................................................... 12 第四章
IijAji ijWIijIijAji ijRCRIBR QCqClqVlCQCC P **21**m i n11 ,11 式中 :CR公交线网系统的总费用 (元 /小时 ); CB运营费用单价 (元 /小时); CP乘车时间价值(元 /小时); CW等车时间价值(元 /小时); QI 路线 I 的最大断面流量(人); qij借点 ij 间的公交需求量;
取得了自主权。 但这种行为规范等必须是求之于人格神性质的天命。 经过孔子的毕生努力,将人性与天命融合为一,使人的生命从生理的限制中突破出来,每个人即可求之于自身之中,“为仁由己”。 但孔子似乎没有把它客观化加以观念的诠释,所以性和天道对于孔子来说还是个人的事实的存在。 子思上承孔子,下启孟子,《中庸》篇讲天命之谓性的性,自然是善的,所以可以直承上句而说“率性之谓道”。