栅极腐蚀在线测量技术项目建议书(编辑修改稿)内容摘要:
北京和德宇航技术有限公司 China Head Aerospace Technology Co. Page: 10/31 3 Customer requirements 用户需求 Introduction 引文 The Lanzhou Institute of Physics aims at the measurement of the grid erosion produced on 1 kWclass ion engines to be placed in a dedicated new vacuum chamber and subjected to long duration tests. Accuracy, easiness of use, and reliability of the system are the key requirements that will be detailed in the next sections. 510 所旨在测量其专有的新型真空灌内 1kW 级等离子发动机所产生的栅极腐蚀,并进行长期测试。 操作的精确 、 可靠 、 简易和系统的可靠是关键要求,详见一下章节。 Detailed customer requirements 客户详细要求 R01 Target thruster grid dimensions 目标推进器栅极尺寸 The erosion measure should be made on grids up to 300 mm in diameter. The grids will not be plane, but curved. 对直径达 300mm的栅极进行腐蚀测量,栅极不非平面而是曲面。 R02 – Primary erosion measurement 初始腐蚀测量 The primary erosion measurement will be concerned with the hole erosion on the external grid (a dimension change of few percentage points should be considered as target for the minimum detectable erosion). 初始腐蚀测量主要涉及的是外部栅极的孔腐蚀(最小可测腐蚀应考虑到几个百分点的外形变化)。 R03 – Secondary erosion measurement 二次腐蚀测量 Pitgroove erosion should also be measured, if possible (if patible with resolution and illumination). 如可以也应测量坑槽腐蚀 (如果符合分辨率与光照条件) R04 – Additional Feature 附加特性 If possible, the ESM software should allow a posteriori reconstruction of a 3D image from two separate pictures taken with slightly different angle of the camera(s). 如果可以, ESM软件通过两张角度略有差别的图像可后期合成 3D 图像。 R05 Type of thruster 推进器类型 The used thruster will be a Gridded Ion Engine. 栅极离子发动机 R06 – Thruster dimensions and weight 推进器尺寸与重量 The thruster diameter will be less or equal to 300 mm. 北京和德宇航技术有限公司 China Head Aerospace Technology Co. Page: 11/31 The thruster weight will be less or equal to 10 kg. 尺寸 ≤300mm 重量 ≤10kg R07 – Environmental requirements 环境要求 The EMS should be patible with the IPL laboratory environmental requirements, summarized below: EMS 应满足 510 所实验室的环境要求: o Vacuum degree: 1x103 Pa to1x102 Pa。 o Cleanliness level: laboratory。 o Temperature: 040 176。 C。 o Humidity: 1060 %。 o Available power: 220 V AC 真空度: 1x103 Pa to1x102 Pa; 洁净度:实验室; 温度: 040 176。 C; 湿度: 1060 %; 可用电源: 220V AC R08 – Vacuum chamber requirements 真空罐要求 The EMS should be used in a new vacuum chamber, 2 m in diameter for about 5 m in length, described in the scheme of Figure 5 and Figure 6. 真空罐直径 2m,长约 5m,见图 5, 6。 Figure 1 Top view: the two DN100 flanges in the red box can be used by ALTA 图 1 顶视图: ALTA可利用红框内的 2 个 DN100 凸缘 北京和德宇航技术有限公司 China Head Aerospace Technology Co. Page: 12/31 1 液氮储供系统 2 副舱真空容器 3 推力器热控装置 4 安装电源专用副舱 5 主舱真空容器 6 真空抽气系统 7 地面 氙供气单元 8 离子推力器地面供电电源 9 电推进控制系统 10 真空抽气和推力器温控控制系统 11 冷却水系统 12 气动元件供气系统 Figure 2 Side view: the three DN100 flanges in the red box can be used by ALTA 图 2 侧视图: ALTA可利用红框内的 3 个 DN100 凸缘 13 液氮进出接口 14 推力器安装架 北京和德宇航技术有限公司 China Head Aerospace Technology Co. Page: 13/31 15 主舱电、气接口 16 主舱真空容器 17 真空规接口 18 鞍座 19 离子束靶 R09 – Mechanical interface with the vacuum chamber 与真空罐机械接口 Alta should clarify the required mechanical interface between the EMS and the vacuum facility. Alta 确定 EMS 与真空罐之间的机械接口。 R10 – Electrical interfaces 电接口 The electrical ponents, including wires and cables, should be patible with high voltage operation. In particular, the expected peak voltage is about 1500 V and the max peak current is 12A. The electrical ponents should be certified for at least 2500 V operation. 电组件,含电线电缆,应能适应高压工作。 最高电压约为 1500V,最大电流 12A,电 组件应至少能承受 2500V的电压。 R11 – Feedthroughs, connectors, and flanges 馈入装置,连接器和凸缘 The feedthroughs for the erosion measuring system stand should be realized in patibility with the available flanges (Figure 6). 腐蚀测量系统的馈入装置应符合可用凸缘(图 6)。 R12 – Control software requirements 控制软件要求 The control software provided with the EMS, should be capable of: o Perform atmospheric and invacuum preliminary setup (“calibration”) o Provide measurement of erosion in terms of circle diameters, linear length, depth of grooves/pits (not in realtime). o Provide alarms and possible information on recovery actions in case of EMS failures. o Being provided with highly automated procedures. o Being provided with extensive User Manual. o Being realized with easiness of use as key requirement. EMS 配有的控制软件应: 可在大气压下和真空中进行初始安装( “校准 ”)。 可测量腐蚀的圆圈直径,线性长度,坑 /槽处深度(非实时)。 EMS 一旦故障,发出警报,提供修复相关信息。 程序高度自动化。 北京和德宇航技术有限公司 China Head Aerospace Technology Co. Page: 14/31 全面的用户手册。 操作简便。 R13 – Control software source code 控制软件源代码 An option in the quotation should be present concerning the possibility of purchasing the control software source code, to be able to independently modify it in the future. 可购买控制软件源代码,以便日后可自行修改。 R14 – Operation requirements 运行要求 The EMS should be capable to operate and withstand the thruster derived temperature level, ining heat flux, and backsputtered particles when placed in safe position. The EMS calibration procedures should be rapid. EMS 不受推进器引起的温度升高,热流和回溅的影响,仍可正常运行。 EMS校准程序迅速。 R15 – Reliability and Service Life 可靠性与使用寿命 The EMS should be capable of withstanding very long times in vacuum (several consecutive months) with sporadic operation. The EMS expected service life should be 8 years, if possible, including options for regular maintenance and availability of spare parts. A set of basic failure。栅极腐蚀在线测量技术项目建议书(编辑修改稿)
相关推荐
的 NO2中的一个氧来氧化 PM中的碳烟,以达到再生的目的。 同时 CRT系统带来排放中的 NO2比例升高问题,虽然排放法规是限定氮氧化合物总量,但是国外研究表明 NO2毒性是 NO的 5~ 8倍,因此从真正清洁空气保护环境而不仅仅是追求排放法规要求角度,应用这一技术路线应考虑如何降低 NO2。 陕西理工学院毕业设计论文 第 7 页 共 35 页 4 固定式反吹再生 DPF 总体设计
张掖市 地处西北干旱荒漠区典型地段,是我国的主要风沙源区,防治荒漠化历史悠久,在与自然界漫长的抗争中积累了丰富的经验,防沙治沙成效明显,基础条件较好,经济实力较强,科技水平较高,特别是随着《防沙治沙法》的颁布以及退耕还林、“三北”四期等林业重点工程的实施,使防沙治沙事业得到了长足发展,沙化土地治理速度、质量、荒漠化动态监测、科技支撑、沙产业开发等方面都取得了重大突破
总分却是直接由原始分数相加而得,严重的误导了高校招生单位,导致高校招生单位很可能并没有招湖南科技大学本科生毕业设计(论文) 5 录到真正的优秀考生,并没有达到高考作为教育评 价的目的。 原始分数难以判断录取分数线 第一章 中已经说明高考作为教育评价所具有选拔的功能,要实现高考的选拔功能,必须借助于高考录取分数线这一标准。 在我国,各校的录取分数线都不一样,但是分数线划定的标准都是一样的
写选通 ) 表 2 AT89S52 P3口第二功能表 RST: 复位输入。 晶振工作时, RST 脚持续 2 个机器周期高电平将使单片机复位。 看门狗计时完成后, RST 脚输出 96 个晶振周期的高电平。 特殊寄存器 AUXR(地址 8EH)上的 DISRTO 位可以使此功能无效。 DISRTO 默认状态下,复位高电平有效。 ALE/PROG:地址锁存控制信号( ALE)是访问外部程序存储器时
6)协调好安装工程与业主、总承包方、设计单位、工程监理单位、政府主管部门和分承包方等各方面的关系。 7)在项目经理的领导下制定并执行安装项目管理人员的岗位责任制和管理制度,做到有章可循、有章必依、奖罚分明。 8)自觉接受上级职能部门、上级单位、政府部门的指导、检查、监督、审计,定期向项目经理报告工作。 9)建立安装项目成本核算制度,组织安装项目成本计划的编制和对审工作,建立“干前有预算
销直径加大受限制;④在杆身与大头圆弧过渡区需制成螺栓头的支承面,对该处强度有影响。 其在小型高速柴油机上有广泛应用。 平切口大头定位形式采用重庆科技学院本科生毕业设计 连杆参数设计及校核 8 螺栓定位。 平切口大头所连接的曲柄销直径 2D 可以增加到 ~ ,取2D mm70 , 2 为轴瓦厚度,查《内燃机设计》,对于柴油机, 2 mm3~2 ,取 2 ,大头内径 1D 2D