中国农村能源生态建设二期项目invitationforbids招标公告(编辑修改稿)内容摘要:

the proposed works. 过去 5 年内至少成功或完全完成 2 价值不低于 300 万元人民币的类似性质和复杂程度的项目 . (3) Bidders should have passed through authentication of ISO9000 quality ISO9000 系列质量体系认证 (4) Project Manager should have Senior professional title in Rural Energy or Environmental Engineeringa and so requirement is applicable only to domestic bidders. Foreign bidders need not meet this requirement. 项目经理应具有农村能源或环境工程等同类专业高级技术职称。 此要求仅适用于国内投标人。 (5) Min. average annual turnover of million Yuan within last 3 1678 万元 Package 2 02 发电、配电设施 (1) Participation in at least 2 contracts within the last 5 years, each with a value of at least million Yuan that have been successfully or are substantially pleted and that are similar to the proposed works. 过去 5 年内至少成功或完全完成 2价值不低于 70万元人民币的类似性质和复杂程度的项目 (2) Bidders should have passed through authentication of ISO9000 quality ISO9000 系列质量体系认证 (3) Project Manager should be a Registered Associate Constructor on power engineering。 This requirement is applicable only to domestic bidders. Foreign bidders need not meet this requirement. 项目经理为电力工程专业二级及以上国家注册建造师。 此要求仅适用于国内投标人。 (4) Min. average annual turnover of million Yuan within last 3 三年最小年平均营业额不低于 万元 Package3 03 生态农业设施 (1)The qualification of Grade3 or above in Steel Structure contracting .This requirement is applicable only to domestic bidders. Foreign bidders need not meet this :投标人应具有钢结构工程专业承包三级及以上资质 .此要求仅适用于国 内投标人。 (2) Participation in at least 2 co。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。