绿化工程施工组织设计中英文版参考(编辑修改稿)内容摘要:
树木种植完成后,应根据观赏效果进行复修剪,进一步美化植物造形。 7, the reshaping and binds the trees planter to plete, should act according to watches the effect to carry on duplicate prunes, further beautifies the plant shape. 固定和支撑: is fixed and the strut: I 为保证树木成活,种植完毕应及时进行固定和支撑;防止树木摇晃或被风吹倒。 In order to guarantee the trees survive, the planter finished should promptly carry on fixed and the strut。 Prevented the trees sway or are blown down by the wind. 根据苗木习性和设计要求,在满足美观的要求上,对所有苗木进行支撑;为保证绿化景观效果,采用招标文件及设计要求中规定的支撑方式进行支撑,要求方向、高度一致,保持支撑后美观、整齐。 According to the nursery stock habit and the design request, in satisfies in the artistic request, carries on the strut to all nursery stock。 In order to guarantee the afforested landscape effect, selects the strut method which the tender document and in the design request stipulated to carry on the strut, the request direction, highly consistently, after the maintenance strut artistic, is neat. 各项资源配置计划 Each item of resources disposition plan 9 为确保该工程施工能顺利进行,施工前及施工过程中,公司及项目经理部为该工程配置较充分的资源,其中: In order to guarantee this project to execute the ability smoothly to carry on, before the construction and in the construction process, the pany and the project management dispose a fuller resources for this project, among: 一、 施工管理及技术人员配置计划: (见附表 1) 1th, the construct control and the technical personnel dispose the plan: (Sees attached list 1) 二、 主要施工机械设备配置计划: (见附表 2) 2th, the main construction machinery equipment disposition plan: (Sees attached list 2) 三、 施工资金配置计划: 3th, the construction fund disposition plan: 该工程施工中的资金投入量及投入频率较大,开工前,由公司财务联系工程部、项目经理部、行政部编制成本控制及资金投入计划,施工中各相关部门均严格按照计划办事,为确保该工程施工顺利进行创造条件。 In front this project construction fund investment quantity and the investment frequency are bigger, begins, by the corporate finance relation engineering dept, the project management, the executive establishment cost control and the fund investment plan, in the construction each correlation department strictly according to the plan management, for guarantees this project construction smoothly to carry on creates the condition. 四、 施工材料及各种附材配置计划 4th, the construction material and each kind attach the material of disposition plan 施工材料及各种附材能及时、准确的供应至现场,是确保工程进度和质量的必要条件之一,该部分工作由项目经理部组织落实。 苗木按照合同清单提供;附材(如支撑、草绳等)数量则以施工工艺要求数量为准,施工中如有变更应及时更改工程量清单及材料供应计划单。 the accurate supply to the scene, is guarantees one of the project progress and quality essential conditions, this part of work anizes by the project management to carry out. The nursery stock provides according to the contract detailed list。 Attaches the material (for example strut, grass rope and so on) the quantity then take constructs the technological requirement quantity as, in the construction like has the 10 change to be supposed promptly to change the resilience detailed list and the material handling plan list. 五、 技术资源投入计划: 5th, technological resource investment plan: 根据工程性质需要,组建项目经理部时已投入了相应的计划力量,为进一步搞好工程质量,公司工程部、技术部将随时为该工程提供所需的技术力量。 According to the project nature need, set up when the project management invested the corresponding plan strength, for further will do well the project quality, the pany engineering dept, the technology department as necessary the technical force which provided for this project needs. 11 附表 1:施工管理及技术人员配置计划 Attached list 1: The construct control and the technical personnel dispose the plan 附表 2:主要施工机械设备配置计划 序号 名称 型号 /规格 数量 适用性 备注 1 运输车 东风 5T 1 良好 交通运输 2 水泵 四冲程 3 良好 浇水 3 修枝剪 日枝 8 良好 修剪乔木枝条 4 割草机 SAE30 1 良好 割草、修剪 5 水平仪 1 良好 测量 6 12 Attached list 2: Main construction machinery equipment disposition plan No Name Type/specification Amount Applicability Remark 1 Transport Vehicle Dong feng5T 1 All right Transportation 2 Water Pump Four stroke 3 All right Irrigate 3 Pruning Shears twig 8 All right Prunes The Tree Branch 4 Cropper SAE30 1 All right Cuts Grass, Prunes 5 Gradienter 1 All right Measure 6 13 工程质量控制计划 Project quality control plan 为保证工程质量,我公司将加强工程质量监控力度,完善工程质量监控及保证措施,以使本工程能够按质、按量、按时完工,创造良好绿化景观效果。 In order to guarantee the project quality, the our pany will strengthen the project quality monitoring dynamics, the perfect project quality monitoring and the guarantee measure, will enable this project according to the nature, in proper amount, on time to finish, creation good afforestation landscape effect. 一、 工程质量监控措施: Project quality monitoring measure: 工程质量监控体系:建立以项目技术负责人为主的质量监控体系,全面贯彻 ISO9001 质 量管理体系,分级控制工程质量,行使协调、控制、检查、监督、否决职能;控制苗木验收到种植完毕及养护管理的全过程。 1th, project quality monitoring measure: 1st, project quality monitoring system: The establishment by the project technology person in charge39。 s primarily quality monitoring system, prehensively implements the ISO9001 quality control system, the step control project quality, exercises the coordination, the control, the inspection, the surveillance, the veto function。 The control nursery stock approves the planter to finish and to maintain the management the entire process. 工程质量控制体系结构:(附图表) 2th, project quality control system structure: (Attaches graph) 14 工程监理 项目经理部 项目总工 施工质量检查组 工程材料检查组 工序质量控制 分项工程质量控制 工程项目质量目标 公司经理室 15 工程质量监控原则:施工每一道工序、每一个分项都按工艺标准操作,实行工序把关;保证 每株树的移植。绿化工程施工组织设计中英文版参考(编辑修改稿)
相关推荐
工材料必须与样板一致 实操上岗; A13: 所有工人培训合格后挂牌上岗,合格牌为绿色,不合格不允许上岗 A14: 施工过程中发现绿牌工人施工不合格,直接转为黄牌,需重新培训合格后方可上岗 工作面准备 A15: 除土壤中的石砾、瓦砾等杂物; A16: 根据土层有效厚度,土壤质地,酸碱度和盐分,采取相应的消毒,施肥和改换土壤等措施; 施工步骤 A17:平整场地,清理场内的垃圾 A18:
六、时常保持笑容 笑是一种无声的语言,它能显示出魅力和涵养。 凡是经常面带微笑的人,往 往能将别人吸引住,使人感到愉快。 人的行为比言语更能切实地表露出一个人的 真心,而微笑则胜过任何雄辩的语言。 微笑是需要练习的。 有的人会说:“我不习惯微笑。 ”习惯从何而来。 习惯是 慢慢养成的。 要改变一个习惯,最好的方法就是养成一个好的习惯去替换它。 要 去除不微笑的习惯,就要养成微笑的习惯
.................................... 112 绿洋山庄二期(华发178。 龙庭) A 区工程 施工组织设计 方案 广州市金辉建筑置业有限公司 1 第一章 方案 说明和 依据 第一节、 工程 内容 本工程为绿洋 山庄 (华发178。 龙庭) 二期 A 区 工程 A A A3栋 ,我司施工内容 主要包括设计图纸中 所有 土建 、 水电安装工程 、 精装修工程
对该药剂的敏感程度。 应先经过小面积的药效和药害试验,以确定使用药剂的种类、浓度和施用方法,切实做到安全、有效。 禁止在开放地区使用对人畜毒性高的除莠剂。 ⑵调配药剂应采用标准量具,按照经过试验确定的浓度比例和当天需用量进行配制。 己配制好的药剂,应避免置烈日下曝晒。 ⑶喷药应严格防止沾染到花木上,对敏感性强的花木,尤其是生产绿地,必须划出保护区或设置保护物隔离。 喷药应均匀,有风时,应注意风向
人事先填写《请假单》,经批准后方可离开工作岗位。 如有特殊情况(如急诊、急事等),应于请假当天电话申报所在部门主管领导与行政人事部获准,并明确请销假时间,上班后在销假同时补办请假手续。 ( 9) 请假期满仍不能上班者应办理续假手续。 未办理请假、续假手续或请假、续假未获批准而不按期上班者按旷工处理。 ( 10) 请假人必须在规定假时结束前亲自及时向 行政人事部办理 销假手续,未办 理销假手续的
壤土为 1223%,粘土为 2123%。 需水量大的植物,其土壤含水量一般要求砂土为 %,砂壤土为912%,壤土为 1823%,粘土为 2223%;需水量少且不耐涝的植物,其土壤含水量控制在:砂土为 %,砂壤土为 69%,壤土为1218%,粘土为 2122%。 6、 验收标准 四、 工作标准 : 绿化养护浇灌 检视浇灌工具及配件 按植物生长需要安排浇灌 连接浇灌用管,打开截门 适量浇水 检查工具