针灸针刀治疗骨性关节炎的临床研究(编辑修改稿)内容摘要:

形成骨赘或骨刺。 The cartilage hyperplasia of epiphysis may occur in early stage, afterwards the cartilage hyperplasia occurs and osteophyte or spurs were formed. 针刀治疗  患者仰卧屈膝,应用针刀对膝关节髌骨周围、髌上囊、髂下囊、髌下脂肪垫、交叉韧带、髁间嵴和内外侧副韧带及股二头股、半腱肌、半膜肌、髂胫束等附着点处压痛点及骨质增生处的变性、结疤、粘连及挛缩的软组织进行切开松解。  Patients were resumed supine position and bent the joint knees. It was operated on the pain points of patella, suprapatellar bursa, infrapatellar bursa,infrapatellar fat pad, cruciate ligaments,intermalleolar crest and mediolateral accessory ligaments around the knee joint and attachment points of biceps muscle of thigh, semitendinous muscle,semimembronous muscle, iliotibial tract, and sites of hyperosteogeny. 外 手 法 治 疗 External manipulation treatment  所有患者均接受该辅助治疗 .患者仰卧 ,应用牵拉晃膝法、牵拉旋膝法、过屈和过伸膝关节和牵引状态下的推弹等手法,将膝内翻或处翻畸形或屈伸功能障碍给予校正,使膝关节内外恢复正常的力学 状态。  Patients were adopted this treatment in two groups. Patient lies on own back and with applying of pull and rotation of the knee, and over flexion and over extension of knee joint,under the traction condition ,to correct the genu valgum and genu valgum abnormalities and functional disorders of flexion and extension. 康 复 疗 法 Rehabilitation Therapy  治疗后三周内以间断性下肢牵引和自我锻练患肢屈伸功能为主。 三周后下肢负重( 1公斤沙袋)直腿抬高锻炼股四头肌收缩功能,每日不少于 150次。 6个月内不可长途行走或负重行走。  All patients were adopted this discontinuous traction of the lower limbs and selftraining of flexion and extension of the limbs are the main method in 3 weeks after three weeks the lower limbs carry a 1 Kg sandbag and raises the leg straightly upward and to exercise the contract funcion of quadriceps muscle of the thigh .No less than 150 times should not walk a long distance or carry a heavy load in 6 months. 统 计 学 处 理 数据用两组比较 X2检验进行处理。 All items were c。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。