职业学院食品与药品检测中心采购进口激光拉曼光谱仪协议(编辑修改稿)内容摘要:

Automatic Intensity correction to pensate for detector wavelength dependence/拉曼信号强度自动校正 Automatic Fluorescence correction for use with all excitation frequencies/ 自动荧光背景扣除 Laser Power Control for reproducible laser power at sample, independent of laser power output/自动激光功率调节 Smart capabilities to recognize and record serial numbers for lasers, gratings, filters, fiber launcher and Smart sampling accessories and toolheads/ 智能识别激光,光栅,滤光片,光纤探头与智能样品附件以及序列号 Smart capabilities to track laser lifetime/智能记录激光使用时间 OMNIC Macros\Basic to pile your routine tasks into simple push button operations/宏操作指令编辑 Quantitative analysis method development (TQ Analyst EZ Edition) and analysis including:/智能定量分析软件 BeerLambert calibration and prediction (peak height or area integration)/ 比尔 朗伯校准定量方法 Classical Least Squares calibration and prediction /经典最小二乘回归( CLR) Discriminant analysis prediction/判别分析技术 Partial Least Squares (PLS) prediction/偏最小二乘回归( PLS) Principal Component Analysis (PCR) pred。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。