sf6替代气体绝缘及局部放电性能的综合研究-科技项目申请书及可行性研究报告(编辑修改稿)内容摘要:

346. [9] Katagiri H, Kasuya H and Mizoguchi H, et al. Investigation of the Performance of CF3I Gas as a Possible Substitute for SF6 [J]. IEEE Transactions on Dielectrics and Electrical Insulation, 20xx, 15(5):14241429. [10] Dodd D E and Kinkead E R, et a1. Acute and subchronic inhalation studies on trifluoroiodo—methane vapor in Fischer 344 Rats[J]. Fundamental and Applied Toxicology, 1997, 35: 6477. [11] Danilov OB and Elagin VV,et a1. Thermal dissociation of trifluoroiodom etheane [J]. Translated from kiical kataliz, 1975, 16(2):302—305. [12] Xu Gaofeng, Sun Caixin and Tang Ju, etal. The Analysis on Propagation Characteristics of Electromagic Waves Excited by Partial Discharge in Gas Insulated Substation[C]. IEEE Proceedings of 20xx International Symposium on Electrical Insulating Materials. 20xx, Himeji, Japan: 367370. [13] Katagiri H, Kasuya H and Mizoguchi H, et al. Investigation of the Performance of CF3I Gas as a Possible Substitute for SF6 [J]. IEEE Transactions on Dielectrics and Electrical Insulation, 20xx, 15(5):14241429. [14] Nguyen Ngoc M, Denat A, Bonifaci N and Lesaint O, et al. Electrical breakdown of CF3I and CF3IN2 gas mixtures [C]. 20xx Annual Report Conference on Electrical Insulation and Dielectric Phenomena, Virginia Beach, 20xx: 557560. [15] Toyota, H., S. Matsuoka, and K. Hidaka, Measurement of Sparkover Voltage and Time Lag Characteristics in CF3IN2 and CF3IAir Gas Mixtures by using SteepFront Square Voltage[J]. Electrical Engineering in Japan, 20xx. 157(2): 17. [16] Takeda, T. et al. Sparkover and surface flaschover characteristics of CF3I gas under application of nanosecond square pulse voltage. in 16th International Symposium on High Voltage Engineering[C]. CapeTown, South Africa: South African Institute of Electrical Engineers, 20xx. [17] Katagiri H, Kasuya H and Mizoguchi H, et al. BTF interruption capability of CF3ICO2 mixture [C]. 17th International Conference on Gas Discharges and Their Applications, Cardiff, 20xx: 105108. [18] Taki M, Maekawa D and Odaka H, et al. Interruption capability of CF3I gas as a substitution candidate for SF6 gas [J]. IEEE Transactions on Dielectrics and Electrical Insulation, 20xx, 14(2): 341346. [19] J de Urquijo, A M Ju225。 rez and E Basurto el at. Electron impact ionization and attachment drift velocities and longitudinal diffusion in CF3I and CF3I–N2 mixtures [J]. Journal of Physics D: Applied Physics, 20xx, 40(7): 22052209. [20] L. G. Christophorou, J. K. Olthoff and D. S. Green, Gases for Electrical Insulation and Arc Interruption: Possible Present and Future Alternative to Pure SF6, National Institute of Standards and Technology Technical Note 1425,1997. [21] , and . Application of a gas Mixture with cC4F8 in gas insulation. Proceedings of 11th Intel. Symp. on HV Engineering, London. 1999, Paper . 197. P3. [22] 吴变桃 .cC4F8及其混合气体绝缘性能的研究 .上海交通大学 . 博士学 位论文 . [23] Yamamoto O, Takuma T, Hamada S, et al. Applying a gas mixtures containing cC4F8 as an insulation medium[J]. IEEE Transactions on Dielectrics and Electrical Insulation, 20xx, 8(6):10751081. [24] Wu Biantao, Xiao Dengming, Liu Zhangsheng, et al. Analysis of insulation characteristics of cC4F8 and N2 gas mixtures by Monte Carlo method[J]. Journal of Physics D: Applied Physics, 20xx(39): 42044207. [25] Hiroaki Y, Osamu T, Yutaka Y, et al. Analysis of discharge voltage in cC4F8 mixtures with N2[J]. Papers of Technical Meeting on Plasma Science and Technology, 20xx, PST00(4453):3944. [26] Zhang Liuchun, Xiao Dengm。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。