日产9万包油炸型方便面生产方案(编辑修改稿)内容摘要:
面箱、轴、叶、下料斗,普通钢或铸铁:传动件、机座,尼龙:定位套Motor: Mixing capacity: 150 kg/time.Included: tank body, mixing shaft, paddle, discharge hopper, pipe pump。 Material: tank body, mixing shaft, paddle, discharge hopper, outer shell are made of stainless steel.Drive part, base are made of carbon steel.Locator is made of nylon.用途:和面是将面粉与盐水混合液按一定比例进行搅拌,使面粉中的蛋白质和淀粉吸水膨胀形成散状面絮的过程。 (Use: Aprocess of mixing flour with liquid in a certain proportion to make rippen dough through protein Absborbing liquid fully )4圆盘熟化机Round ripen machine1料盘规格:直径1600mm、高410mm,电机功率:,材料:不锈钢:熟化盘、拨杆、闸板,普通钢或铸铁:传动件、机座。 Dimension of disk: φ 1600 x (H) 410 mm.Motor: kwIncluding aging plate, roller gap adjusting handle, feeding plate.Material: Aging plate, roller gap adjusting handle, feeding plate are made of stainless steel.Driving part and seat are made of steel or cast iron.用途:用于将和面机输出的面团进行熟化(Use: Dough ripen process is way to get stable inner structure for uniformly dough feeding)5复合压延机Compound roller machine1电机功率:4+=,压辊7组:辊宽330mm,包括:导料斗、喂料拨棒、面片输送带、成型器。 材料:不锈钢:导料斗、拨棒、机罩、护板。 普通钢或铸铁:传动件、机座。 冷硬合金铸辊:压辊。 食用橡胶:面片输送带。 尼龙:压辊边板Motor: 4+= (frequency conversion speed regulator)Roller: 7sets, width of roller: 330 mm.Including: dough storage hopper, perpendicularity feeding plate, dough sheet conveyor.Material: Dough storage hopper, perpendicularity feeding plate, dough sheet conveyor are made of stainless steel.Drive part, seat are made of steel or cast iron.Roller is made of alloy cast iron.Dough sheet conveyor is made of food grade rubber.用途:将经过熟化的絮状面团用7对轧辊连续压延成片后,经面刀切条再由切断刀将其定长切断。 (Use: Make ripen dough into dough sheet for slitting after 7 times rolling)6单层蒸面机Single layer steamer1规格:长12000,动力由切断机提供。 包括:蒸槽、网状输送带、蒸汽喷注管、减压阀、阀门、压力表、温度表、排气罩、管。 材料:不锈钢:槽体、喷管、输送链、导轨、排汽罩、排汽管,普通钢或铸铁:传动件、垫板、机脚调节螺栓、上下开盖机构。 硅酸铝:机体保温层。 Dimension:L12m,power supply by: Heat preserved trough, mesh conveyor, steam pipe, reducing valve, pressure gauge, temp gauge, airejecting cover and pipe.Material: Stainless steel: Heat preserved trough, steam pipe, conveyor chain, mesh, track, airejecting cov。日产9万包油炸型方便面生产方案(编辑修改稿)
相关推荐
过程精品,质量责任重于泰山 17 河南国基建设集团 有限公司 HENANGUOJIJIANSHEJITUAN 郑州日产汽车第二工厂项目 施工组织设计 q3 = P1 N3 K4/( t 8 3600) =400 40 /( 2 8 3600) =式中 K4— 施工现场用水不均衡系数{查《建筑施工手册》表 337}; t— 每天工作班数(班); N4— 生活区昼夜全部生活用水定额,第一居民每昼夜为
500℃ 中国矿业大学 2020 届本科生毕业设计 第 1 页 14 Q7=122424 kJ ( 8)带出物的物理热 Q8=4 550 =2772 kJ ( 9)灰渣化学热 Q9=135636kJ ( 10)灰渣物理热 Q10=3567kJ ( 11)炉壁热损失(取原料发热量的 7%) Q11=2585300 =180971 kJ 共计 3810376 kJ 故需从料层中吸取的热量
0%NaOH 1)投 加 点:调节池和 pH 调整槽 2)投 加 量:设计分别为 450ml/min(中和槽)和 70ml/min( pH 调整槽),由pH 控制仪控制 3) 注意事项: NaOH 溶液为强腐蚀性药品。 在操作时请带好防护手套和眼罩,避免液体接触身 体,特别是眼部。 如不慎溅上药品,立即用布清除,后用清水冲洗;如溅入眼中,立即用清水冲洗,然后去医院检查。 ( 2) PAC 溶液
水量为4%; 混合机容量为2000kg干基。 计算如下:2000㎏中砂岩的干基用量为:[2000(200020%)]%= (kg) 根据需求配合料的水分为4%,所以 (2000400)/= =。 产量计算玻璃生产的产量计算是依据设计计划任务书规定的生产规模,生产方法和产品品种,计算的基准是熔制车间的生产能力。 各项产品相关参数见表26:表26
mgsl干生料理论消耗量, kg/kg 熟料 Aar燃料 应用基灰分含量, % α 燃料灰分掺入量 ,取 100% Ls生料的烧失量, % b 出袋收尘飞损及回灰量: )/(0001099901101熟料kgkg.).(.η)(mm fhFh )/(熟料kgkgmm Fhfhyh myh入窑回灰量, kg/kg 熟料 mfh出预热器飞灰量,
柳松菇、滑菇等。 草腐菌的工厂化生产以双孢蘑菇的历史最长 ,技术也最为成熟。 1974 年 , 荷兰的Bels 等首先使用控制湿度、温度和通风量的技术种植 双抱蘑菇 ,进而使双抱蘑菇发展到了工业化生产。 之后 , 美国、荷兰、德国、意大利等相继实现了双抱蘑菇的机械化、工业化生产。 至今 , 欧美的双抱蘑菇从菌种制作、培养料发酵到覆土材料制备等都已形成了专业化、规模化、工业化生产。 美国