norton39stheorem(53,88)(编辑修改稿)内容摘要:

train, R is the nominal resistance, GF is the Gauge Factor Backing Foil ECE201 Lect14 8 Typical values • Measured strain values are typically fairly smallusually less than 103. • GF is usually close to 2. • Typical values for R are 120W, 350W, and 1000W. • A typical change in resistance is DR = 2•103•120W = ECE201 Lect14 9 Measuring Small Changes in R • To measure such small changes in resistance, the strain gauge is placed in a Wheatstone bridge circuit. • The bridge circuit uses an excitation voltage source and produces a voltage that depends on DR. ECE201 Lect14 10 The Bridge Circuit R+DR Vex R R R + – Vout + – ECE201 Lect14 11。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。