chaptereightpragmatics(编辑修改稿)内容摘要:
I give and bequeath my watch to my brother. Features of performatives The first person singular Speech act verbs / performative verbs: The present tense Indicative mood Active voice I take a cold bath everyday. I jog ten miles every Sunday. I like to drive fast cars. Pedestrians are warned to keep off the grass. Turn right. Thank you! I promise to be there. / I’ll be there. I admit I was wrong. / I was foolish. I warn you, this gun is loaded. / This gun is loaded. I thank you. / I’m very grateful. I apologize. / I’m sorry. I order you to sit down. / You must sit down. The distinction between constatives amp。 performatives cannot be maintained. All sentences can be used to do things. Illocutionary Act Theory Speech acts can be analyzed on 3 levels: A locutionary act: the act of saying something in the full sense of “say”. An illocutionary act: an act performed in saying something. In saying X, I was doing Y. In saying “I will e tomorrow”, I was making a promise. Illocutionary force A perlocutionary act: the act preformed by or as a result of saying, the effects on the hearer. By saying X and doing Y, I did Z. By saying “I will e tomorrow” and making a promise, I reassure my friends. Shoot her! Searle’s classification of speech acts 1. representatives: stating or describing, saying what the speaker believes to be true. assert, state, swear, guess, deny, inform, notify, etc 2. Directives: trying to get the hearer to do sth. Request, advise, order, urge, tell, etc 3. misives: mittting the speaker himself to some future course of action Commit, promise, threaten, pledge, etc 4. expressives: expressing feelings or attitude towards an existing state Apologize, thank, congratulate, greet, etc. I‟m really sorry! Congratulations! 5. declarations: bringing about immediate changes by saying sth Declare, appoint, nominate, name, etc. I now appoint。chaptereightpragmatics(编辑修改稿)
相关推荐
protocoltree • dissectors – wiretap – plugins – displayfilters – ... 协议解析器 协议解析器 • 从数据列表中选中一个包 • 提取包中的数据,写入数据结构中 • 调用协议解析函数 epan_dissect_run 进行处理 协议解析器 主题大纲 • Wireshark 简介 • 嵌入 AVLSdk反病毒引擎 – AVLSdk简介
揭示實在道理或現存的認知框架,而非提供「無限的可能性」 (例如,虛構一趟到太陽中心的旅程去解釋太陽的溫度,那是科普,虛構一趟到太陽中心的旅程,展示旅程中所可能出現的變數及人性衝突,那就是科幻了 )所以說 文本的系統較為封閉是科普作品的另外一個特點。 36 科幻作品用於科普教學 1. 不少科幻作品,都是充滿 啟發性 (教育價值 /意義 )的,例如著名的「 2020年太空漫遊」 2.
N CLASS • =CLASSPATH Analysis Scope Representation • Reachable Methods • stored in file specified by (default = []/) • Resolved Reflection • stored in file specified by (default = []/)
Type 5: High Voltage Charge Pumps Design Considerations Typical Charge Pump Designs Charge Pump Design 1: Dual Compensation Charge Pump Charge Pump Design 2: NMOS Topology for a Dual
b)=C 23 The deduction can also be written as M (A, abab) = M (M (A, a) , bab) = M (B, bab) = M (M (B, b), ab) = M (C, ab) = M (M (C, a) , b) = M (B, b) = C 24 Example There is FA=({ W, S, P} ,{ t
理结果。 Connection con = ( jdbc:odbc:wombat, login, password)。 Statement stmt = ()。 ResultSet rs = (SELECT a, b, c FROM Table1)。 while (()) { int x = (a)。 String s = (b)。 float f = (c)。 } Example: JDBC