电气工程与自动化毕业论文中英文资料外文翻译(编辑修改稿)内容摘要:
quarature 毕业设计(中英文翻译) 6 axis because this is the position of the coils to which they are connected. The armature . wave then is along the brush axis as shown.. (The geometrical position of the brushes in an actual machine is approximately 90 electrical degrees from their position in the schematic diagram because of the shape of the end connections to the mutator.) The magic torque and the speed voltage appearing at the brushes are independent of the spatial waveform of the flux distribution。 for convenience we shall continue to assume a sinusoidal fluxdensity wave in the air gap. The torque can then be found from the magic field viewpoint. The torque can be expressed in terms of the interaction of the directaxis airgap flux per pole d and the spacefundamental ponent 1aF of the armature . wave . With the brushes in the quadrature axis, the angle between these fields is 90 electrical degrees, and its sine equals unity. For a P pole machine 12)2(2 adFPT In which the minus sign has been dropped because the positive direction of the torque can be determined from physical reasoning. The space fundamental 1aF of the sawtooth armature . wave is 8/ 2 times its peak. Substitution in above equation then gives adaada iKimPCT 2 Where ai =current in external armature circuit。 aC =total number of conductors in armature winding。 m =number of parallel paths through winding。 And mPCK aa 2 Is a constant fixed by the design of the winding. The rectified voltage generated in the armature has already been discussed before for an elementary singlecoil armature. The effect of distributing the winding in several slots is shown in figure ,in which each of the rectified sine waves is the voltage generated in one of the coils, mutation taking place at the moment when the coil sides are in the neutral zone. The generated voltage as observed from the brushes is the sum of the rectified voltages of all the coils in series between brushes and is shown by the rippling line labeled ae in figure. With a dozen or so mutator segments per pole, the ripple bees very 毕业设计(中英文翻译) 7 small and the average generated voltage observed from the brushes equals the sum of the average values of the rectified coil voltages. The rectified voltage ae between brushes, known also as the speed voltage, is mdamdaa WKWmPCe 2 Where aK is the design constant. The rectified voltage of a distributed winding has the same average value as that of a concentrated coil. The difference is that the ripple is greatly reduced. From the above equations, with all variable expressed in SI units: maa Twie This equation simply says that the instantaneous electric power associated with the speed voltage equals the instantaneous mechanical power associated with the magic torque , the direction of power flow being determined by whether the machine is acting as a motor or generator. The directaxis airgap flux is produced by the bined . ffiN of the field windings, the . characteristic being the magization curve for the particular iron geometry of the machine. In the magization curve, it is assumed that the armature . wave is perpendicular to the field axis. It will be necessary to reexamine this assumption later in this chapter, where the effects of saturation are investigated more thoroughly. Because the armature . is proportional to flux times speed, it is usually more convenient to express the magization curve in terms of the armature . 0ae at a constant speed 0mw . The voltage ae for a given flux at any other speed mw is proportional to the speed,. 00 amma ewwe Figure shows the magization curve with only one field winding excited. This curve can easily be obtained by test methods, no knowledge of any design details being required. Over a fairly wide range of excitation the reluctance of the iron is negligible pared with that of the air gap. In this region the flux is linearly proportional to the total . of the field windings, the constant of proportionality being the directaxis airgap permeance. The outstanding advantages of DC machines arise from the wide variety of operating 毕业设计(中英文翻译) 8 characteristics which can be obtained by selection of the method of excitation of the field windings. The field windings may be separately excited from an external DC source, or they may be selfexcited。 ., the machine may supply its own excitation. The method of excitation profoundly influences not only the steadystate characteristics, but also the dynamic behavior of the machine in control systems. The connection diagram of a separately excited generator is given. The required field current is a very small fraction of the rated armature current. A small amount of power in the field circuit may control a relatively large amount of power in the armature circuit。 ., the generator is a power amplifier. Separately excited generators are often used in feedback control systems when control of the armature voltage over a wide range is required. The field windings of selfexcited generators may be supplied in three different ways. The field may be connected in series with the armature, resulting in a shunt generator, or the field may be in two sections, one of which is connected in series and the other in shunt with the armature, resulting in a pound generator. With selfexcited generators residual magism must be present in the machine iron to get the selfexcitation process started. In the typical steadystate voltampere characteristics, constantspeed prime movers being assumed. The relation between the steadystate generated . aE and the terminal voltage tV is aaat RIEV 。电气工程与自动化毕业论文中英文资料外文翻译(编辑修改稿)
相关推荐
的应急照明灯或用蓄电池组供电的备用照明 ,作为发电机组投运前的过渡期使用。 C. 当采用两路低压供电时,备用照明的供电应从两段低压配电干线分别接引。 D. 当供电条件下不具备两个电源或两回路时,备用电源宜采用蓄电池组或带有蓄电池的应急照明灯。 ⑤ 备用照明作为正常照明的一部分同时使用时,其配电线路及控制开关应分开装设。 备用电源仅在事故情况下使用时,则当正常照明因故断电时,备用电源自动投入。 ⑥
护灯具。 对民用建筑,应选用与建筑装饰水平相协调的灯具。 对高级宾馆一类的照明,宜选用豪华型灯具或能满足环境气氛要求的特色灯具;对一般档次的建筑,宜选用 普及型灯具为主、对较低档次的建筑,宜选用简易经济型灯具为主 [1]。 室内灯具的布置,与房间的结构及照明要求等因素有关,既要实用、经济,又要尽可能地协调、美观。 室内灯具的布置方式通常有三种:
的电压和电流 V O ——— PFC 输出电压 I IN ——— 输入电流 其工作原理 ,如图 12所示 : ① 在 t0 以前 , 主开关 VM 、 辅助开关 VM1均截止, 二极管 D1导通, I IN通过 D1 输出到负载 , ILr = 0。 ② t0~ t1 阶段 , 在 t0时刻, VM 1开通, Lr中的电流 ILr 线性增长 , 同时 D1的电流 ID1 以互补的方式 线性下降
卡按键型。 4. 2 系统基本功能及特点 在电梯里安装控制主机和读卡头,能严格控制持卡人进入的层数, 即刷卡后,按相应的有权限的楼层按钮才有效,不刷卡或刷卡后按没有权限的按钮都没效。 基本功能及特点: 能严格控制每张卡的出入楼层。 采用美国原装内置电池芯片,电梯使用记录、时钟永不丢失。 可脱机或联网使用。 软件操作简明,可实时监控电梯的使用情况。 ID 或 IC 卡系统可选。
的小长方块代表。 它可以是两根距离约 1 mm 的裸导线。 若有铜板 3 可取一小块 , 用小刀刻去一条宽约 1mm 的 铜 形成绝缘缝隙 , 再在绝缘缝隙两边各焊 一根连线 , 便成了使用方便的触摸探头。 当人的手指触及探头 ( 其 意是指人的手指同时触及绝缘缝隙两边的导体 ) 时 , 相当予探头上 跨 接一个等效电阻 , 其阻值一般小于 2MΩ ( 实际阻值与人体手指的干 湿程度等因素有关
广告 lian 盟推广、即时通讯营销、口碑推广、博客营销、 播客推广、事 件营销、 Email 推广 … 综合成本、效果,搜索引擎推广优势最为显著,更为直接的带来定订单。 因此企业除了建立一支学习型团队,内部人才培养体系的建立将是重中之重。 当然,具备个性化和活力的企业文化,有着良好薪资福利的 企业,更容易吸引优秀人才的加盟。 (一)从网站用户体验的角度出发 在页面中需要引导客户