机电工程系0601-王玉鹏毕业论文(编辑修改稿)内容摘要:
, the sequential design method is mainly used in the preparation of the ladder. System, the choice of using more power in between the stepping motor and DC motor options, as stepper motor can be precisely start and stop, and relatively easy to control, step motor to power the final choice. Taken into account during the design of nonstandard parts and standard parts, standard parts selection, design nonstandard parts, standard parts of nonstandard 运城学院学士学位论文 parts by the restrictions. In the design process, as more transmission ponents, transmission ponents to be considered with the fixed support and to ensure noninterference between all the ponents. Possible to simplify the transmission system, accurate. Main point is the design should consider safety and reliability, economy and feasibility of such a bination of factors, including safety and reliability first place. Safety and reliability is reflected in the choice of some basic parameters, most of the domestic parameters determined based on experience, but also by internal parameters of the design is generally more secure. Economy reflected in the program simple and mature technology. If the program selected the PLC control ponents in the design sought to at least. Consider the feasibility of technical information and manufacturing costs. The design of control systems mature, lower manufacturing costs, feasibility strong. Select the PLC control program, seek to control ponents in the design at least, the simplest structure, bandaging accurate, stable and reliable. A parison of alternative control scheme, choose the best program for preliminary design, calculation. If not meet design requirements, pared to the rest of the program, and then choose the best preliminary design of the program again, if meet the requirements, select the model, the detailed design. Control options: options in the choice of control because the reality hardware and software limitations, some requirements had to be simplified, considering the various factors to determine the program for the PLCbased control of electrical systems. The main technical data: Renovation of internal information on the dressing and bandaging machine video at home and abroad, and other information related to the mechanical design. Key words: Automatic, wrap machine, PLC, electrical control system design 运城学院学士学位论文 I 目 录 第一章 绪论 .................................................................................................................1 选题目的、价值和意义 ......................................................................................1 研究范围以及所要达到的技术要求 ..................................................................1 本课题在国内外的发展状况及存在的问题 ......................................................2 本课题的指导思想 ..............................................................................................2 本课题应解决的主要问题 ..................................................................................3 第二章 基于 PLC 的自动包扎机电气控制系统设计、控制方案介 绍 ....................4 控制方案简介、分析、选择 ..............................................................................4 控制方案确定、介绍 ..........................................................................................4 第三章 步进电机基本原理 .........................................................................................7 步进电机简介 ......................................................................................................7 步进电机结构及工作原理 .................................................................................8 步进电机的运行控制 .......................................................................................10 工作过程 ....................................................................................................10 PLC 介绍 ......................................................................................................... 11 PLC(可编程控制器)的特点 .................................................................. 11 PLC 基本原理 ....................................................................................................12 CPM2A 的性能和功能 ......................................................................................15 第四章 编程设计(接线图、梯形图、功能表图) ...............................................16 步进电机 ...........................................................................................................16 PLC 选择、参数 ................................................................................................17 控制过程分析 ...................................................................................................18 程序编制 ...........................................................................................................19 电机间的速比 ....................................................................................................21 步进电机与 PLC 衔接配合 ..............................................................................35 运城学院学士学位论文 II 第五章 实验 .............................................................................................................36 条件实验 ............................................................................................................36 实物连线图 .......................................................................................................36 设计成本分析 ...................................................................................................38 第六章 结论 ...............................................................................................................39 参考文献 .....................................................................................................................40 附录 .............................................................................................................................42 致谢 ...........................................。机电工程系0601-王玉鹏毕业论文(编辑修改稿)
相关推荐
空吸盘的设计 真空吸盘是利用吸盘 内形成负压(真空)而把工件吸附住的元件。 它适用于抓取薄片状的工件,如塑料板、矽钢片、纸张及易碎的玻璃器皿等,要求工件表面平整光滑、无孔无油。 吸盘材料构成 除结构外,吸盘材料也是决定其 密封性能 的关键因素。 目前市场上的真空吸盘采用的材料有丁腈橡胶、硅橡胶、聚氨酯、氟橡胶等。 由硅橡胶制成的吸盘适于抓住表面较粗糙的制品;由氨酯制成的吸盘则很耐用。 另外
方式 消防竖管的布置是否保证同层相邻两个消火 栓充实水柱同时达到保护范围内的任何部位 系统采用防超压措施 消火栓系统消防设备 消防水泵接 合器 类型 地上 [ ] 地下 [ ] 墙壁 [ ] 规格 数量 (个 ) 增压设备 高位消防水箱静水压小于《高规》时采用的 措施 增压泵 [ ] 数 量 (台 ) 功 率 (kW) ( )用 ( )备 流 量 (L/s) 扬 程 ( m ) 气压罐 [ ]
售,但价格相对整体销售较贵。 特征:浴室整体销售,整体销售价格相对于单个销售相对较贵。 7 品牌:“金香浴”整体浴室 包装:采用店内部分整体浴室设计陈列,更有几十款不同浴室整体设计三维图供顾客参考。 ( 3) 延伸产品 顾客可以通过我们在店内摆放的浴室模型和图册进行浴室的 DIY 设计,顾客可以通过摆放我们的浴室模型和选择图册中 不同浴室的家具和设计师进行沟通,完成自己的浴室设计及浴室家具购买。
8K 字节程序存储空间; 256 字节数据存储空间; 显示器介绍 显示器是最常用的输出设备,其种类繁多,但在单片机系统设计中最常用的是发光二极管显示器( LED)和液晶显示器( LCD)两 种。 由于这两种显示器结构简单,价格便宜,接口容易实现,因而得到广泛的应用。 发光二极管 LED,组成的显示屏,每个点都是一个或多个发光二极管,通过控制电路控制二极管的亮与灭来控制点的发光
全的长期战略目标。 改变水稻生产“面朝黄土背朝天,弯腰曲背几千年”的生产方式,一直是广大农民的迫切愿望,广大农村对提高水稻生产机械化水平的呼声日高涨。 与此同时,随着我国农业机械化水平的提高,水稻生产机械化得到了长 足发展。 本课题来源于江苏东洋机械有限公司,它受到了江苏省科技攻关计划项 目的支持。 针对我国水稻生产实际情况,东洋公司对以前产品进行了优化设计、 生产的新机型 PDrow4。
置、分度装置、工件和刀具装卸装置、工件输送装置等,采用液压传动后,有利于简化机床结构,提高机床 自动化程度。 、高速机床、高精度机床上的轴承、导轨、丝杠螺母机构等处采用液体静压支承后,可以提高工作平稳性和运动精度。 液压传动在其他机械工业部门的应用情况见表 11 所示。 行业名称 应用场所举例 工程机械 挖掘机、装载机、推土机、压路机、铲运机等 起重运输机械 汽车吊、港口龙门吊、叉车、装卸机械