直流电动机闭环控制系统毕业论文中英文资料外文翻译文献(编辑修改稿)内容摘要:
ripherals onto a single chip , TMS320 devices reduce system costs and save circuit board space. The 16bit ,fixedpoint DSP core of the „C24x devices provides analog designers a digital solution that does not sacrifice the precision and performance of their system performance can be enhanced through the use of advanced control algorithms for techniques such as adaptive control , Kalman filtering , and state control. The „C24x DSP controller offer reliability and programmability . Analog control systems, on the other hand ,are hardwired solutions and can experience performance degradation due to aging , ponent tolerance, and drift. The highspeed central processing unit (CPU) allows the digital designer to process algorithms in real time rather than approximate results with lookup tables. The instruction set of these DSP controllers, which incorporates both signal processing instructions and generalpurpose control functions, coupled with the extensive development time and provides the same ease of use as traditional 8and 16bit microcontrollers. The instruction set also allows you to retain your software investment when moving from other generalpurpose„C2xx generation ,source code patible with the‟C2x generation , and upwardly source code patible with the „C5x generation of DSPs from Texas Instruments. The „C24x architecture is also wellsuited for processing control signals. It uses a 16bit word length along with 32bit registers for storing intermediate results, and has two hardware shifters available to scale numbers independently of the CPU . This 滨州学院本科毕业设计 (外文翻译 ) 6 bination minimizes quantization and truncation errors, and increases p2ocessing power for additional functions. Such functions might include a notch filter that could cancel mechanical resonances in a system or an estimation technique that could eliminate state sensors in a system. The „C24xDSP controllers take advantage of an set of peripheral functions that allow Texas Instruments to quickly configure various series members for different price/ performance points or for application optimization. This library of both digital and mixedsignal peripherals includes: Timers Serial munications ports (SCI,SPI) Analogtodigital converters(ADC) Event manager System protection, such as lowvoltage and watchdog timer The DSP controller peripheral library is continually growing and changing to suit the of tomorrow‟s embedded control marketplace. The TMS320F/C240 is the first standard device introduced in the „24x series of DSP controllers. It sets the standard for a singlechip digital motor controller. The „240 can execute 20 MIPS. Almost all instructions are executed in a simple cycle of 50 ns . This high performance allows realtime execution of very ple8 control algorithms, such as adaptive control and Kalman filters. Very high sampling rates can also be used to minimize loop delays. The „ 240 has the architectural features necessary for highspeed signal processing and digital control functions, and it has the peripherals needed to provide a singlechip solution for motor control applications. The „240 is manufactured using submicron CMOS technology, achieving a log power dissipation rating . Also included are several powerdown modes for further power savings. Some applications that benefit from the advanced processing power of the „240 include: Industrial motor drives Power inverters and controllers Automotive systems, such as electronic power steering , antilock brakes, and climate control Appliance and HVAC blower/ pressor motor controls Printers, copiers, and other office products 外文翻译 7 Tape drives, magic optical drives, and other mass storage products Robotic and CNC milling machines To function as a system manager, a DSP must have robust onchip I/O and other peripherals. The event manager of the „240 is unlike any other available on a DSP . This applicationoptimized peripheral unit , coupled with the high performance DSP core, enables the use of advanced control techniques for highprecision and highefficiency full variablespeed control of all motor types. Include in the event manager are special pulsewidth modulation (PWM) generation functions, such as a programmable deadband function and a space vector PWM state machine for 3phase motors that provides stateoftheart maximum efficiency in the switching of power transistors. There independent up down timers, each with it‟s own pare register, support the generation of asymmetric (noncentered) as well as symmetric (centered) PWM waveforms. OpenLoop and ClosedLoop Control Openloop Control Systems The word automatic implies that there is a certain amount of sophistication in the control system. By automatic, it generally means That the system is usually capable of adapting to a variety of operating conditions and is able to respond to a class of inputs satisfa。直流电动机闭环控制系统毕业论文中英文资料外文翻译文献(编辑修改稿)
相关推荐
投入 28 亿元,实施各类城建项目 442项。 新建改造道路 公里。 迎宾路高架桥、开发大路跨化工园铁路桥、中德大街一 标段、开发 22 号路宝马铁路专用线下穿桥等重点工程竣工通车,浑河四街、中德大街二标段、地铁九号线铁西段、中法大道等建设工程加快推进。 北一路、保工街等 “三横两纵 ”快速路网建设全面启动,北一路快速路管网排迁工程完工。 铁西金谷二号路、三号街竣工通车。
弟明确分工, 董事长 杨钊主抓市场,副董事长杨勋主抓生产。 进入房地产业 到 1981 年, 香港 经济多年的快速发展,使每年 银行 的存款都保持了 4 倍以上的增速,财 富的积累,使房地产市场需求极其旺盛,整个香港就像 人声鼎沸 的大卖场, 招标 、 评估 、竞投、 拍卖 ,土地交易炙手可热。 但随之而来的世界经济萧条和中英香港问题谈判,突然令港人出现信心 危机 , 1982 年楼价暴跌
目的注册执业人员执业印章印模 勘察设计单位申请意见 我本人及本企业承诺 : 依法诚信经营,保证勘察设计质量,认真遵守勘察设计市场管理的有关规定。 法定代表人签字: (公章) 年 月 日 项目所在市或试点县建设部门意见 年 月 日 备 注 注:本表一式三份,申请单位、项目所在市或试点县(市)建设部门各一份,并报省建设厅一份。 省外勘察设计单位进江苏省承接勘察设计业务 单项核验登记申请表
72/126 120/174 120 180 +40/0 +63/0 0/25 0/40 +28/+3 +40/+15 43/83 85/125 85/148 145/208 180 250 +46/0 +72/0 0/20 0/46 +33/+4 +46/+17 50/96 100/146 100/172 170/242 250 315 +52/0 +81/0 0/32 0/52 +36+/4
措大大 提高了空间 使用 率。 图 所示的 分别为多盘式和格子式刀库,虽然它 们都有前面所说的一些优点,但是由于换刀动作过于复杂,因此得到了较少的运用。 5 刀库的类型 加工中心上普遍采用的刀库是盘式刀库和链式刀库。 密集型的固定刀库目前于用于 FMS 中的集中供刀系统。 ( 1)盘式刀库 盘式刀库结构简单,应用较多,如图 所示。 因为刀具被排列成环形 ,降低了空间使用率。
程设计 TCC RCUn Tee 2 式中: RRR a。 若 U, , R 均为常数,机械特性是一条向下倾斜的直线,如图 3 所示。 Tnn β0 (1) 或 nnn 0 由式( 1)可知, β 越大, n 越大,机械特性曲线越斜,称之为软特性;反之将 β 小、n 小的特性称硬特性。 当电枢上加额定电压、气隙每极磁通为额定磁通