建筑设计毕业论文中英文资料外文翻译文献(编辑修改稿)内容摘要:
liable uptodate information on excavators, loaders and transport is obtainable from the makers. Earthworks or earthmoving means cutting into ground where its surface is too high ( cuts ), and dumping the earth in other places where the surface is too low ( fills). Toreduce earthwork costs, the volume of the fills should be equal to the volume of the cuts and wherever possible the cuts should be placednear to fills of equal volume so as to reduce transport and double handlingof the fill. This work of earthwork design falls on the engineer who lays out the road since it is the layout of the earthwork more than anything else which decides its cheapness. From the available maps ahd levels, the engineering must try to reach as many decisions as possible in the drawing office by drawing cross sections of the earthwork. On the site when further information bees available he can make changes in jis sections and layout,but the drawing lffice work will not have been lost. It will have helped him to reach the best solution in the shortest time. The cheapest way of moving earth is to take it directly out of the cut and drop it as fill with the same machine. This is not always possible, but when it canbe done it is ideal, being both quick and cheap. Draglines, bulldozers and face shovels an do this. The largest radius is obtained with the dragline,and the largest tonnage of earth is moved by the bulldozer, though only over short disadvantages of the dragline are that it must dig below itself, it cannot dig with force into pacted material, it cannot dig on steep slopws, and its dumping and digging are not accurate. Face shovels are between bulldozers and draglines, having a larger radius of action than bulldozers but less than draglines. They are anle to dig into a vertical cliff face in a way which would be dangerous tor a bulldozer operator and impossible for a dragline. Each piece of equipment should be level of their tracks and for deep digs in pact material a backacter is most useful, but its dumping radius is considerably less than that of the same escavator fitted with a face shovel. Rubbertyred bowl scrapers are indispensable for fairly level digging where the distance of transport is too much tor a dragline or face shovel. They can dig the material deeply ( but only below themselves ) to a fairly flat surface, carry it hundreds of meters if need be, then drop it and level it roughly during the dumping. For hard digging it is often found economical to keep a pusher tractor ( wheeled or tracked ) on the digging site, to push each scraper as it returns to dig. As soon as the scraper is full,the pusher tractor returns to the beginning of the dig to heop to help the nest scraper. Bowl scrapers are often extremely powerful machines。 many makers build scrapers of 8 cubic meters struck capacity, which carry 10 m 179。 heaped. The largest selfpropelled scrapers are of 19 m 179。 struck capacity ( 25 m 179。 heaped )and they are driven by a tractor engine of 430 horsepowers. Dumpers are probably the monest rubbertyred transport since they can also conveniently be used for carrying concrete or other building materials. Dumpers have the earth container over the front axle on large rubbertyred wheels, and the container tips forwards on most types, though in articulated dumpers the direction of tip can be widely varied. The smallest dumpers have a capacity of about m 179。 , and the largest standard types are of about m 179。 . Special types include the selfloading dumper of up to 4 m 179。 and the articulated type of about m 179。 . The distinction between dumpers and dump trucks must be remembered .dumpers tip forwards and the driver sits behind the load. Dump trucks are heavy, strengthened tipping lorries, the driver travels in front lf the load and the load is dumped behind him, so they are sometimes called reardump trucks. of Structures The principal scope of specifications is to provide general principles and putational methods in order to verify safety of structures. The “ safety factor ”, which according to modern trends is independent of the nature and bination of the materials used, can usually be defined as the ratio between the conditions. This ratio is also proportional to the inverse of the probability ( risk ) of failure of the structure. Failure has to be considered not only as overall collapse of the structure but also as unserviceability or, according to a more precise. Common definition. As the reaching of a “ limit state ” which causes the construction not to acplish the task it was designed for. There are two categories of limit state : (1)Ultimate limit sate, which corresponds to the highest value of the loadbearing capacity. Examples include local buckling or global instability of the structure。 failure of some sections and subsequent transformation of the structure into a mechanism。 failure by fatigue。 elastic or plastic deformation or cr。建筑设计毕业论文中英文资料外文翻译文献(编辑修改稿)
相关推荐
主塔 江心洲大桥主塔承台以上塔高 107m, 桥面以上塔高为 80m, 桥塔高跨比为。 桥塔底部 3 m 段为塔座 , 采用实心圆形变截面 ,由直径 m 塔座底截面直线渐变至直径 m 塔座顶截面。 张拉膜结构 采用高强薄膜材料、加强构件(钢架、柱或索),内部产生一定的预应力,形成某种空间形状作为覆盖结构,并能承受一定的外荷载作用结构形式。 优点: 膜结构建筑外观雅致飘逸,空间开阔灵秀、结构轻盈
选择其他银行的免费服务。 短信金融 建行短信金融简介 手机短信金融服务是指基于中文短消息技术,通过建设银行短信平台,并依托建行业务系统,以手机短信的方式为客户提供的建行相关金融信息通知的服务。 建行短信金融的 优势 包括个人账户余额变动通知、个人存款到期通知、个人贷款催收通知、银行卡信息通知、风险预警类通知、个人账户 信息查询、银行与客户关系的维系等十二项服务。 建行短信金融存在的问题。 4
将迎来前所未有的发展机遇,推动项目以及整个物流产业的加速发展。 (四)项目选址优势 根据建设规模的需要及周边环境的要求,确定 项目选址 地点为 市 区 镇。 园区内区位交通优越,配套设施建设完善,用地充裕且土地开发前期工作基本完成,产业集聚优势明显,项目发展潜力巨大, 同时,项目入园后可按标准申请享受投资优惠政策,减少投资成本, 因此,项目选址可行。 五、项目功能定位 (一) 目标定位 根据
用无踢面的踏步和突缘为直角形的踏步; 四、踏步面的两侧或一侧凌空为明步时,应防止拐杖滑出; 五、梯段两侧应在 高度处设扶手,扶手宜保持连贯; 六、楼梯起点及终点处的扶手,应水平延伸 以上。 第 2 条 供拄杖者及视力残疾者使用的台阶 一、台阶超过三级时,在台阶两侧应设扶手; 二、台阶和扶手作法应符合第 1 条有关规定。 第 六 节 电梯 第 1 条 电梯候梯厅的面积不应小于 *。 第 2 条
5. 室内消火栓的布置,应保证有两支水枪的充实水柱同时到达室内任何部位。 6. 室内消火栓的布置间距根据两支水枪同时到达室内任何部位为原则,经计算确定。 7. 水枪的充实水柱长度应由计算确定,一般不小于 7 m,但超 过 6 层的层用建筑、库房,人防工程,车库和建筑高度不超过 100 m 的高层建筑,不应小于10 m。 管材选择 本设计中 ,消火栓管道安装要求与生活给水管基本相同
计算 校核 a b h H 终 — H 始 = a — b 成果校核 hf =5hf mm n容 队名 : 密 成员姓名: 封 线 3 比赛用时: 现场裁判签字: 1 附录 2 工程算量比赛规则 一 、 比赛内容 (一) 手算部分。 1. 计算范围:手算图纸不公开, 3— 5 层框架结构,建筑面积 1000m2以上,平屋顶,计算内容是土建(含钢筋)和简装。 2 .