变形监测技术毕业论文中英文资料外文翻译文献(编辑修改稿)内容摘要:
ysis has the parison test and the t inspection method. Comparison test use simple, but quite rough, the t inspection method effect is better, at present applies 中英文资料外文翻译 6 widely. Pelzer proposed in 1971 at present widely uses whole displacement analysis average gap law. The steady iteration power estimated the law is first carries on bythe free freedom method to two issue of s , obtains the coordinates two groups smallest two to ride the solution and the coordinates is bad. Then, through the simple point stability examination and the selection weight function, unceasingly changes in the reference datum datum power, the gradually ite rative putation, finally causes the displacement power is 1,live moving point displacement power takes according to its displacement quantity size is smaller than 1 positive number. Because steady iterates the power to estimate has the stronger localization model error the ability, uses in to move analyzes the effect well, especially when exists pares the imperial throne effect to be after a short while better. But the above each displacement analysis method has the following shorting: (1) Regarding the concrete deformation work, its displacement moves the situation differently, when the observation value pretreatment chooses the datum to be different, will draw the different conclusion to the displacement determination, sometimeseven will draw the wrong conclusion; (2) If two issue of monitor sprecisions are different, namely two issue of parent substances units power variance is inconsistent, then cannot apply; (3) When carries on the supposition examination, the remarkable level selection has enormously is subjective at will. Therefore, the displacementanalysis method still had further to study and the consum mation. 中英文资料外文翻译 7 4 distortions analyzes and forecasts the method As a result of the deformable body structure, the constituentarchery target physics mechanical properties, the exogenic process plexity and the determinism, does not establish the appropriate indeed qualitative model to be difficult, therefore, through promulgates the distortion monitor data sequence the structure and the rule, establishes the performance forecast model, reflected the distortion characteristic, the inference change tendency, bees one effective method. In recent years, approached with the mathematical model, simulates and promulgates changes The physique distortion and the dynamic characteristic bee the new research direction, parison has the representative model is: Definite function model, regression analysis model, time series analysis model, gray system model, nerve work model, Mar tan oak husband model The definite function model main characteristic is: Using the deformable body mechanical properties and the physical parameter, establish between the load and the distortion the indeed qualitative functional relation, is one kind has first examines the nature forecast method. The modelling does not need the massive distortions monitor material, can carry on the distortion forecast in the distortion monitor initial period. When the plex deformable body distortion uses the determination the theory relations type to express with difficulty, uses the limited unit law putation, because the deformable body is impossible is the plete elastomer, 中英文资料外文翻译 8 can introduce the error as a result of the elastic supposition, therefore this method has not been able to promote the application. The regression analysis model is the basis measured data with the least squares method determination regression equation parameter, after the modelling belongs to the experience model or examines the model the category. T。变形监测技术毕业论文中英文资料外文翻译文献(编辑修改稿)
相关推荐
线时提出来的,它的优点是概念清晰,计 算简单。 只能用于矩形微带天线以及微带振子天线,对其他形式的微带天线,比如圆形,则不实用。 缺点是计算输入阻抗误差较大,而且没有考虑沿着与传播方 向正交的方向上场的变化。 因此尽管传输线模型易于使用,但是很多结构类型不 能使用它来分析。 腔模理论 腔模理论是目前应用比较广泛的一种理论,它适用于分析多种形状的微带天 线
专业从业人员的专业技术水平和职业道德观念势在必行。 这种强大的 市场缺口也为我校开设口 5 腔工艺技术专业,培养适应社会需求的口腔人才提供了极好的契机。 三、 调查结果对 存在问题的分析和对 今后工作的启示 (一)存在问题及原因分析 需进一步加大投入,加强硬件建设。 由于学校办学经费主要来自学费收入,实训基地建设、教改科研工作的开展都需要大量的专业建设经费做支撑。 需 要
障碍设施改造 165 户,为 2283 名一级重度残疾人办理意外保险。 城镇实名制就业达到 万人,城镇登记失业率控制在 4%以内,零就业家庭继续保持动态为零。 实名制扶持创业带头人 647 人,带动就业 7882 人。 扎实推进安居工程,安置居民 3400 户。 年初确定的 42 项为民办实事工作全面完成。 ——新农村建设取得明显成效。 加强农业基础设施建设,完成设施农业建设 450 亩。 5
字母来表示。 按 JB、 Z145- 79 规定如下: 考虑到双电机拖动直线振动筛的优点,在此设计中采用双电机拖动的直线振动筛。 物料在筛面上的运动分析 物料在筛面上的运动状态与筛子的工作参数有密切关系。 对于直线振动筛,物料运动平均速度 v可按下式计算:
( c)、( d)所示。 毕业设计(论文) 12 按有包心形成内外摆线 如图 24,设圆 O O2半径为 R R2;圆 O O4半径分别为 R R4.当滚圆O2在基圆 O1圆周外作纯滚动时,滚圆上点 E 的轨 迹称为外摆线,如图 24( a)所示。 当滚圆 O3在基圆 O4圆周内作纯滚动时,滚圆上点 F 的轨迹称为内摆线,如图24(b)所示。 R 4R3R 1R 2O 2O 1W1P 1EO
脚手架专项 方案 11 (4)雨、雪 、雾 及六级以上大风等天气,严禁进行脚手架搭设、拆除工作。 (5)应设安全员负责对脚手架进行经常检查和保修。 A 在下列情况下,必须对脚手架进行检查 | a 在六级 以上 大风和大雨后 b 停用超过 一 个月,复工前。 B 检查保修项目 a 各主节点处各杆件的安装、连墙件等构造是否符合《施工 方案》 的要求; b 扣件螺丝是否松动; c