系统设计组(编辑修改稿)内容摘要:

摘要: 本设计以 TMS320VC5509A 为系统的核心,实现一个 全 TI解决方案 的具有实时检测、无线传输和 24小时心电数据连续记录功能的多功能 Holter系统。 心电信号通过 EASI导联系统模块采集心电信号,然后采用第二代小波变换算法对心电信号进行实时的特征提取,并将心电数据存入 MicroSD卡实现 24小时心电数据记录;或者通过 TI的 Zigbee无线传输模块将心电数据传输到电脑进行远程实时监测以及十二导联心电数据的推导。 关键字: TMS320VC5509A; Holter; EASI十二导联; ECG;第二代小波变换 DSP based Holter system with EASI 12lead Abstract: In this design, a multifunctional Holter system is developed by using TMS320VC5509A. In the solution provided by TI, realtime detection, wireless transmission and 24hours continuous recording of ECG (Electrocardiograph) signal are implemented. ECG signal are acquired by EASI Lead System module, then processed by 2nd generation wavelet transformation based algorithm for feature extraction. The data of ECG signal are saved to MicroSD card, or transmitted to the puter by TI’ s Zigbee module for distance realtime monitoring and derivation of 12lead ECG data. 國 立 交通大學 以 DaVinci平台實現即時影音追蹤與語音純化系統 本專案主要設計並建 立 一套即時影像追蹤、聲源定位與語音純化系統。 專案選用德州儀器推出的 DaVinci(TMS320DM6446)為發展平台,透過使用 DaVinci 優化的影像處 理 子系統與強大運算能 力 的 DSP 晶片,研發一雙模式聽覺與視覺之智慧型人機互動介面。 本專案以嵌入式雙核心系統開發技術為基礎,配合上 數 位式麥克風陣 列 訊號處 理 技術、語音活動偵測演算法、聲源方位估測演算法、適應性語音純化演算法以及人臉追蹤演算法 來 建置此人機互動平台。 國 立 交 通大學 高階伺服器電源單晶片 DSP全 數 位適應控制之設計與實現 本專題為研究 數 位控制技術於伺服器電源之應用,伺服器電源包含 兩 級轉換器,前級為交 流 直 流 升壓式 PFC轉換器,改善輸入線電 流 諧波失真,提高功 率 因 數 ,並使輸出提升為400 V直 流 電壓。 後級為全橋相移直 流 直 流 轉換器,將 400 V直 流 電壓 降 為 12V輸出並具良 好的動態響應。 本專題使用德州儀器 數 位信號處 理 器 TMS320F2812去實現具低斜波失真及高功 率 因 數 之交 流 直 流 轉換器與具 復 載適應性控制之相移全橋直 流 直 流 轉換器。 國 立 台灣科技大學 即時影像 監控與追蹤系統 Realtime Surveillance and Image Tracking System ㄧ般的監控系統因為使用廣角攝影機的緣故,無法得到目標物的清晰影像以做為辨 識用,而 若 使用 PTZ(Pan, Tilt, Zoom)攝影機,雖然可做旋轉及放大功能,但在監控單一目標時,就無法兼顧其他的物體。 因此本研究將結合德州儀器 TMS320DM642 DSP 模組及雙攝影機模組進 行 多目標物之協同追蹤,其中以場景攝影機做多目標物之即時追蹤,並透過座標轉換方式引導 PTZ 攝影機做單一目標物之追蹤,此時 便 可使用橢圓偵測找出頭部,並且得到臉部之清晰影像以做為身分辨 識 用途,最後本系統將結合網 路 傳輸的架構以 DSP 平台當作 Server 端,以ㄧ般 PC 的視窗介面作為 Client 端,可透過網 路 由遠端直接框取想要放大畫面或針對多個移動目標做選擇性之單一目標物的鎖定追蹤。 當 Server 端偵測到有 異 常移動物體侵入,也會自動的將警示影像畫面資訊即時傳遞給 Client 端,如此可建構出一套具網 路連 線警示功能及選擇性多目標監控能 力 之即時追蹤系 統。 哈尔滨工程大学 高分辨浅水多波束测深系统 摘要 : 本设计以 我国 海洋开发 所 迫切需要但仍处于空白状态的高性能多波束海底地形地貌探测设备 为背景,以 TI公司的 TMS320C6713B 为核心处理器, 结合 FPGA构建了一个多 DSP阵列的 MIMD并行信号处理系统,硬件包括 56 通道信号源和发射机、 80通道接收机和数据采集器、并行声纳信号处理机;软件包括可程控信号产生模块、信号 调理 与 预处理模块、 实时数据采集模块、实时海底信号检测与参数估计模块、实时监控与显示模块。 关键词:数字信号处理,高分辨,多波束,测深系统 High Resolution Shallow Water Multibeam Bathymetry System Abstract: The design of a multiDSP array signal processing system based on MIMD parallel architecture was constructed with TI39。 s TMS320C6713B and FPGA as core processor and a highperformance multibeam seabed topography detection equipment as background, which is urgently needed in the field of China39。 s marine development. The system hardware includes a signal generator with 56channel and transmitter, a receiver and data collector with 80channel and a parallel sonar signal processing system. The system software includes a phased signal generator module, a signal preconditioning and conditioning module, a realtime data acquisition module, a realtime seabed signal detection and time of arrival(TOA) and direction of arrival(DOA) estimation module and a realtime monitoring and display module. 算法组 基于 DSP的印刷数字水印认证算法 王玲 王晓建 晏飞 李治野 刘允 电子科技大学通信与信息工程学院 UESTCTI技术中心,成都, 610054 摘要 :本文提出了两种印刷数字水印的算法 +系统方案 : 一种是基于 TMS320VC5509A的无意义数字水印算法。 这套方案的特点在于能够快速地检测印刷品的真伪,功耗小,便于携带。 另一种是基于 TMS320DM642处理器的有意义数字水印算法,该套方案能够更加准确,直观地对印刷品进行检测和认证。 该设计已经被 2020北京奥组委采纳成为奥运会门票的防伪技术之一,也为国家大剧院提供了票务检测样机和技术支持,并正在申请成为我国新版护照的防伪措施。 Abstract: This work proposes two algorithms and systems for printed digital watermarking, satisfying two different situations. One is Meaningless Printed Digital Watermark and corresponding system based on TMS320VC5509A DSP. This system excels in its fast detection time and low power consumption. The other is Meaningful Printed Digital Watermarking, which could give more accurate and intuitionistic detection results. The TMS320DM642 Processor is selected to realize this high performance algorithm. These designs have already been adopted as one of the two technologies used for 2020 Beijing Olympic Game tickets’ anticounterfeiting, and provides sample system and technical support for The National Centre for the Performing Arts, also currently is running for the bidding of RPC’ s new passport’ s authorization. 基于 Gabor小波的人脸识别算法及其在达芬奇平台上的实现 摘要: 本设计在国际上首次将 Intel OpenCV 计算机视觉库中两个核心库 cxcore、 cv移植到德州仪器公 司 TMS320DM6446 达芬奇平台的 ARM和 DSP平台上,并在该平台上实现了基于Gabor小波的人脸识别算法。 算法使用 灰度图像中 的 Haar特征 和 Boosting 分类器 检测 人脸并定位眼睛,通过 Garbor小波抽取特征,最后采用。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。