服装结构设计(一)电子教案(编辑修改稿)内容摘要:
1/4 of the hip measurement +1cm at the front hipline and 1/4 of the hip measurement 1cm at the back hipline ② 将( HW) /4分成三份, 1/3作省, 2/3为侧缝撇量,腰省合并后,臀围处放出,裙摆展开量由腰省拼合后自然形成。 ② Divide 1/4 of the ease between hip measurement and waist measurement into three, one third of which is waist dart and twothirds of which is side seam dart. Close waist darts. Add the amount transferred into the hip line. To obtain naturally the flared hemline only the waist darts. ③ 画顺裙外轮廓线。 ③ Curve the outlines of Aline skirt. 4.波浪裙 4. Flared skirt 第一种方法 —— 直接作图法(Ⅰ) The first method —— the direct graphic method(Ⅰ) ( 1) .规格设计: SL=~ +a; W=W*+0~ 2cm; H=H*+> 12cm ( 1) . Size Design: SL=~ +a; W=W*+0~ 2cm; H=H*+> 12cm ( 2) .结构制图要点: ( 2) . Pattern plot and development: ① 按裙长、腰围、臀围、臀长作裙原型结构图。 课堂讲授2课时 课内实验2课时 13 ① Draw skirt block based on the skirt length, waist measurement, hip measurement and hip depth. ② 将腰省关闭, 臀围处 放 出,为扩大裙摆,可从 WL 处将整个裙身拉展,形成更大裙摆。 ② Close out darts into hem. Slashup flare lines and add required amount fullness. The skirt will be opened out evenly at the hem if the waist line is slashed ③ 画顺裙外轮廓线,作成波浪裙结构图。 ③ Curve the outlines of flared skirt. 第二种方法 —— 直接 作图法(Ⅱ) The second method—— the direct graphic method(Ⅱ) ( 1) .规格设计: SL=~ +a; W=W*+0~ 2cm; H=H*+> 12cm ( 1) . Size Design: SL=~ +a; W=W*+0~ 2cm; H=H*+> 12cm (2).结构制图要点: (2). Pattern plot and development: ① 按 SL、 W/n( n 为裙片数)作矩形。 ① Draw a rectangle based on the skirt length and 1/n of waist measurement (n refers to the number of skirt pieces). ② 在 WL 中心处用直角尺旋转使裙片的臀围 =H/n( n 为裙片数)。 ② Use a set Square to acquire 1/n of the hip measurement at the center waist line. (n refers to the number of skirt pieces) ③ 画顺腰线和底边线作成波浪裙结构。 ③ Curve the waistlines and hemlines as the pattern of flared skirt. 第三种方法 —— 圆周制图法 The third method—— the circle graphic method ① 两片裙结构 ① halfcircle skirt ② 四片裙结构 ② quartercircle skirt ③ 八片裙结构 ③ eightcircle skirt ④ 三片裙结构 ④ threepanel skirt ⑤ 六片裙 结构 ⑤ sixpanel skirt 14 教 学 重 点 与 难 点 教学重点: Teaching emphasis: Patternmaking of Aline skirt Patternmaking of flared skirt 教学难点: Teaching difficulties 在裙装原型的基础上变化形成 A字裙和波浪裙的结构处理方法 The methods are to dissolve the pattern of Aline skirt and flared skirt based on the basic skirt block. 课 堂 讨 论 与 练 习 1. 在裙装原型的基础上作 A字裙 (比例 1: 1) Draw Aline skirt based on the skirt block (ratio 1:1). 2. 用 圆周制图法作波浪裙(比例 1: 1) Draw flared skirt by the circle graphic method (ratio 1:1). 参 考 资 料 《服装结构设计》 主编:张文斌 中国纺织出版社 《女装结构设计(上)》 主编:张向辉 于晓坤 东华大学出版社 《日本文化学院服饰大全-裙子、裤子》 张祖芳等译 东华大学出版社 备 注 注:教案按授课次数填写,每次授课均应填写一份。 重复班授课可不另填写教案。 15 周 次 第 6 周 章 节 名 称 第四章 下装结构设计 CHAPTER 4 Pattern Designing of Bottoms 二、 裙装结构设计 二、 Skirts pattern designing (二)、裙装变化结构 The construction of variation of skirts 授 课 方 式 课堂讲授( √ );实践课( ) Classroom Lecture( √); Practice course( ) 教 学 时 数 Class hour 4 时间分配 授 课 要 点 二、 裙 装结构设计 二、 Skirts pattern designing (二)、裙装变化结构 The construction of variation of skirts 节裙 tier skirt ( 1). 规格设计: SL=177。 a; W=W*+0~ 2cm; H=H*+> 12cm ( 1). Size Design: SL=177。 a; W=W*+0~ 2cm; H=H*+> 12cm ( 2).结构制图要点: ( 2). Pattern plot and development: ① 作前裙片的中 心线 AB, AB=裙长。 ① Draw the center line of front skirt panel AB (AB is skirt length). ② 在前中线上截取 1/4 裙长为第一节的长度。 ② Cut the quarter of front center line as the first tier. ③ 在 A点作一条腰口线并垂直于 AB。 ③ Draw a vertical line at the Point A. ④ 在腰口线上取腰围大为 W/4。 ④ Measure 1/4 of waist measurement at the waist line. ⑤ 加放腰围大的 1/2 作为裙腰的抽褶量,并作垂直线。 ⑤ Add half of waist measurement as the gathering amount, and draw a vertical line. ⑥ 第二节的长度可取裙长的 1/2。 ⑥ Tier 2 = Cut 1/2 of the skirt length. ⑦ 以第一节加放腰围的 1/2 作为第二节的抽褶量,并作垂直线。 ⑦ Add 1 1/2 of the first panel as the gathering amount, and draw a vertical line. ⑧ 第三节的长度可取裙长的 1/4。 ⑧ Tier 3 = Cut 1/4 of the skirt length. ⑨ 以第二节加放腰围的 1/2 作为第三节的抽褶量,并作垂直线。 ⑨ Add 1 1/2 of the second panel as the gathering amount, and draw a vertical line. ⑩ 后裙片的绘制方法基本同前片一样,区别在于 后中心位置向下低 1 ㎝。 ⑩ Repeat instruction for back skirt. The difference is to measurement down 1cm from the back center point. 课堂讲授3课时 课内实验1课时 16 高腰裙 Highwaisted skirt ( 1).规格设计: SL=177。 a; W=W*+0~ 2cm; H=H*+6~ 12cm ( 1). Size Design: SL=177。 a; W=W*+0~ 2cm; H=H*+6~ 12cm ( 2).结构制图要点: ( 2). Pattern plot and development: ① 在裙原型上作高腰位线,距腰线 8cm。 ① Draw a high waistline on the skirt block. Extend the original waistline upward 8cm. ② 合并两腰省,延长至高腰位线,画顺腰省。 ② Close darts. Extend the high waistline, and cut front on fold to make waist darts smooth. ③ 根据效果图 在裙身上作腰部育克分割线。 ③ Draw yoke lines on the skirt panels as diagram. ④ 其余裙身进行拉展作成抽褶裙造型。 ④ Traceoff the other skirt sections to make the gathered skirts. 抽褶裙 Gathered skirt ( 1).规格设计: SL=177。 a; W=W*+0~ 2cm; H=H*+6~ 12cm ( 1). Size Design: SL=177。 a; W=W*+0~ 2cm; H=H*+6~ 12cm ( 2).结构制图要点: ( 2). Pattern plot and development: ① 按规格作出裙原型图。 ① Draw the skirt block based on the size chart. ② 在两侧裙片 WL 和 HL 之间作斜向剪开线。 ② Place the bias lines between waistline and hipline on both side skirt panels. ③ 分别将剪开线剪开至裙身两侧并拉展,形成抽褶量。 ③ Cut separately along the bias lines to the side seam, and slash from hem up to the bias and open out the hem to obtain gathered amount. ④ 画顺裙身外轮廓线。 ④ Make the o。服装结构设计(一)电子教案(编辑修改稿)
相关推荐
从现在应用的技术方面和用户的操作方式方面以及经济性等方面研究 期刊管理 系统的总体需求、实现方案,并分析开发系统的可行性,为决策者是否开发该系统提供依据和建议。 项目背景 建议开发软件名称: 期刊管理 系统 项目的提出者: 张庭 开发者: 张庭、岳涛、吴李江、江一舟、孙晓渭 用户:读者 实现软件的单位: 盐城工学院 定义 该系统 是 基于 对 期刊 的借阅、归还 、管理 等提供 高效率
女湖的湖在全园的构图中心位置,三面被山包围,景观空间的形式属半开敞式。 在环湖步道上行走会有一种安谧的感觉。 整个园区基本上呈 中轴对称,以幸福广场和茶山神女区的表演广场形成的对景线为主轴线, J、 C两区和湖对岸的 F、 G、 H区坐镇轴线的两侧。 整个构图很均衡。 (五) 植物配置 神女湖公园的植物配置突出了永川“茶竹文化”,运用了大量的乡土植物,主要用银杏、小叶榕、香樟、国槐、水杉
y 等 [7]用 5%NaOH 溶液在 30 ℃下分别处理黄麻纤维 0、 2 h、 4 h、 6 h、 8 h,然后 室温干燥 48 h,再 100 ℃干燥 6 h。 对温度的影响一般认为,纤维素的碱化为放热反应,随温度提高,纤维素润胀程度下降,碱纤维的反应活性降低。 因此,碱润胀处理一般在较低温度下进行,如 20 ℃,进行为宜 [8]。 从多位研究者对纤维素碱处理的报道中得出
析 礼服的出租对象主要是主持群体。 每年在北高教园区举行的晚会、赛事等娱乐文化活动不胜枚举,因此礼服的需求量也是很大的。 而演出服主要针对的是各大剧社,以及晚会的表演者。 我们学校有白桦林、霁云、浅溪等剧社,每个学期都 会举办几场话剧,而且像迎新晚会,元旦晚会等晚会也不计其数。 因此演出服的需求量也很可观。 8 / 24 二、市场竞争分析 据调查了解,宁波北高教园区从事服装租赁的个体商铺并不多
应。 当群集中的一个节点失效,另外一个可以通过 失效切换 的过程接替失效节点上运行的应用程序。 同时,由于应用程序和客户端所需要的数据是存储在共享的存储设备中的,在 失效切换 的过程中共享存储的访问控制权也由失效节点切换至运行节点上,客户端和应用程序 可以通过共享存储设备继续访问必要的数据。 这样,通过群集,可以实现在一个服务器节点失效的情况下,仍然可以提供数据访问和网络服务的正常运行
清照、冯惟敏等一代名流。 有国家一级博物馆 “青州博物馆 ”,有国家级重点风景名胜区云门山风景区,国家森林公园仰天山森林公园和全国重点文物保护单位驼山。 龙兴寺佛教造像是中国 “二十世纪百项考古发现 ”之一。 经济总量平稳较快增长。 2020 年,全市地区生产总值( GDP)达 亿元,比上年增长 %。 其中,第一产业增加值 亿元,增长 %;第二产业增加值 亿元,增长 %,其中,工业增加值 亿元