无功功率补偿毕业论文中英文资料外文翻译文献(编辑修改稿)内容摘要:
onic Distortion in Electronic Drive Applications Larry Ray, PE。 Louis Hapeshis, PE December 2020 Abstract This paper provides an overview of harmonic considerations for designing industrial and mercial electric power distribution systems. These power systems must serve a bination of loads, many of which produce nonsinusoidal current when energized from a sinusoidal ac voltage source. While conventional power distribution systems acmodate a significant amount of nonsinusoidal current, the design engineer can utilize existing IEEE guidelines and basic software tools to avoid some special circuit and load configurations that exacerbate harmonic distortion problems. Introduction Power system harmonic distortion has existed since the early 1900’s, as long as ac power itself has been available. The earliest harmonic distortion issues were associated with third harmonic currents produced by saturated iron in machines and transformers, socalled ferromagic loads. Later, arcing loads, like lighting and electric arc furnaces, were shown to produce harmonic distortion as well. The final type, electronic loads, burst onto the power scene in the 1970’s and 80’s, and has represented the fastest growing category ever since. A better understanding of power system harmonic phenomena can be achieved with the consideration of some fundamental concepts, especially, the nature of nonlinear loads, and the interaction of harmonic currents and voltages within the power system. Harmonic Distortion Basics What’s Flowing on the Wire? By definition, harmonic (or nonlinear) loads are those devices that naturally produce a nonsinusoidal current when energized by a sinusoidal voltage source. Each “waveform” on the right, for example, represents the variation in instantaneous current over time for two different loads each energized from a sinusoidal voltage source (not shown on the graph). For each load, instantaneous current at some point in time (at the start of the graph, for example) is zero. Its magnitude quickly increases to a maximum value, then decreases until it returns to zero. At this point, the current direction appears to reverse – and the maximumtozeromagnitude trend repeats in the negative direction. This pattern is repeated continuously, as long as the device is energized, creating a set of largelyidentical waveforms that adhere to a mon time period. Both current waveforms were produced by turning on some type of load device. In the case of the current on the left, this device was probably an electric motor or resistance heater. The current on the right could have been produced by an electronic variablespeed drive, for example. The devices could be single or threephase, but only one phase current waveform is shown for illustration. The other phases would be similar. How to Describe What’s Flowing on the Wire? Fourier Series While the visual difference in the above waveforms is evident, graphical appearance alone is seldom sufficient for the power engineer required to analyze the effects of nonsinusoidal loads on the power system. The degree of nonlinearity must be objectively established, and the method of quantifying the harmonic distortion must also facilitate future analysis and mitigation. One method of describing the nonsinusoidal waveform is called its Fourier Series. Jean Fourier was a French mathematician of the early 19th century who discovered a special characteristic ofperiodic waveforms. Periodic waveforms are those waveforms prised of identical values that repeat in the same time interval, like those shown above. Fourier discovered that periodic waveforms can be represented by a series of sinusoids summed together. The frequency of these sinusoids is an integer multiple of the frequency represented by the fundamental periodic waveform. The waveform on the left above, for example, is described entirely by one sinusoid, the fundamental, since it contains no harmonic distortion. The distorted (nonlinear) waveform, however, deserves further scrutiny. This waveform meets the continuous, periodic requirement established by Fourier. It can be described, therefore, by a series of sinusoids. This example waveform is represented by only three harmonic ponents, but some realworld waveforms (square wave, for example) require hundreds of sinusoidal ponents to fully describe them. The magnitude of these sinusoids decreases with increasing frequency, often allowing the power engineer to ignore the effect of ponents above about the50th harmonic. The concept that a distorted waveform (even a square wave!) can be represented by a series of sinusoids is difficult for many engineers. But it is absolutely essential for understanding the harmonic analysis and mitigation to follow. It’s important for the power engineer to keep in mind a few facts: • The equivalent harmonic ponents are just a representation – the instantaneous current as described by the distorted waveform is what’s actually flowing on the wire. • This representation is necessary because it facilitates analysis of the power system. The effect of sinusoids on typical power system ponents (transformers, conductors, capacitors) is much easier to analyze than distorted signals. • Power engineers fortable with the concept of harmonics often refer to individual harmonic ponents as if each really exists as a separate entity. For example, a load might be described as producing “30 amperes of 5th harmonic”. What’s intended is not that the load under consideration produced 30 A of current at 300 Hz, but rather that the load produced a distorted (but largely 60 Hz) current, one sinusoidal ponent of which has a frequency of 300 Hz with an rms magnitude of 30 A. • The equivalent harmonic ponents, while imaginary, fully an。无功功率补偿毕业论文中英文资料外文翻译文献(编辑修改稿)
相关推荐
8, 每个 HCS08 系列的 MCU 都是由 HCS08 核加上几个存储器以及外设模块组成。 HCS08 核的组成部分都有 HCS08 CPU, 背景调试控制器 (BDC),支持多达 32 个中断 /复位源,芯片级地址译码, 无线收发单元。 毕业 论文 8 方案三: AT89C51是一种带 4K字节闪烁可编程可擦除只读存储器( FPEROM— Falsh Programmable and
2国道,交通便利,通讯通信设施、水电设施齐全,各种基础设施条件完善。 为项目的实施提供了有利的保障。 其它建设条件 交通条件 312国道、西南铁路、沪陕高速横贯商南东西,商郧公路、商卢公路、郭山公路纵横南北,交通运输条件优越。 水文及河流 项目区所在地水资源条件优越,地下水蕴藏丰富,水能蕴藏量,流域面积 100平方公里以上的河流 8条,开发潜力巨大。 气候、气象条件 项目区所在地气候温暖
重点的惩防体系建设日趋完善,审计监督、行政监察和督查考核得到强化,软环境建设成效明显。 深入开展 “打非治违 ”、 “百日安全生产大检查 ”等专项行动, “党政同责、一岗双责、齐抓共管 ”的安全生产责任体系逐步完善,基层安全监管能力进一步增强 ,全县安全生产形势持续稳定。 “六五 ”普法工作圆满收官,社会法治化管理水平不断提高。 法制政府工作大力推进,政府法律顾问制度建立运行。
用户可选择前端的任一摄像机进行监控,能够灵活方便地做到:对任一图像的亮度、对比度、饱和度、色彩进行调节;对每台变焦摄像机的镜头进行变倍、聚焦控制;对全方位云台进行各种方向的控制和操作;直接在画面上进行控制操作;通过键盘控制,对摄像机视角、方位、焦距、光圈、景深进行调整;通过RS485 总线,对系统内的高速智能球型摄像机的控制,使球机直接到预置的方向和观察角度(包括水平转动角度和垂直转动角度)。
所以及卫浴产生的污水。 由于施工现场人员数量受到施工内容、施工季节、施工机械等多种因素影响,变化较大。 根据类比分析,本项目施工过程中,施工人员预计为 150~ 200 人。 人均生活用水量按 120L/d 计算,则生活污水量为 18~ 24 m3/d,废 水中其主要污染物为: COD、 BOD SS 等。 通过类比进行估算,废水中主要污染物浓度为:COD 200~ 300mg/L、 BOD5
竞争力。 (三)搬迁工作量少 **县盛世山庄旅游 度假村建设项目 —— 项目建议书 **市建筑规划设计院有限责任公司 6 项目用地范围内仅有少量住户, 区内荒山草坡、林地、 耕地 和少量开荒地可收归国有,土地征用量不大, 山体台地 宽平,环境容量大,是开展旅游的理想地方,景区开发条件较好。 第 三 章 市场 分析及 预测 一、 市场现状 随着我国国民经济的高速发展,国民生活水平大幅度提高