建筑工程灌注桩毕业论文中英文资料外文翻译文献(编辑修改稿)内容摘要:
ical to plan, should not only guarantee a pile hole construction does not affect the last pile hole drill, and the moving distance of not too far and mutual interference. (6) the hole cleaning The drilling depth, diameter, location and shape of hole is directly related to the quality of pile and pile body black. Therefore, in addition to drilling process close 中英文资料 observation supervision, to meet the design requirements in drilling hole depth, with deep, hole, pore shape, pore size and other inspections. In the end hole inspection in full pliance with the design requirements, shall immediately proceed to bottom hole cleaning, avoid it too long that mud settling, caused by borehole collapse. For friction pile when the hole wall is easy to collapse, in underwater concrete perfusion before the sediment thickness of not more than 30cm。 when the hole wall is not easy to collapse, not more than 20cm. For the post, in water or shoot the breeze, sediment thickness less than 5cm. Hole cleaning method is to use different and flexible application of drilling rig. Usually you can use normal circulation rotary drilling rig, reverse circulation rotary machine vacuum suction machine and slag pumping cylinder hole cleaning. The mud suction machine hole cleaning, required equipment, convenient operation, hole cleaning is thorough, but unstable in the soil should be used cautiously. Its principle is to use pressor generates high pressure air into a suction dredge pipeline will mud blowing. (7) pouring underwater concrete After finishing hole, can be prefabricated reinforcement cage hanging vertically into the hole, positioning to be fixed, and then using a perfusion catheter concrete, pouring concrete don39。 t interrupt, or prone to the phenomenon of broken pile. Effect of bored pile bearing performance factors In the construction process, construction machinery, due to geological effects, often caused by pile soil ( weak layers ), the thickness of ~ , thick and up to 1m. Especially in soft soil with mud, drilling, hole bottom sediment is inevitable。 even after careful cleaning hole, the hole cleaning after and before concrete, will precipitate some sediment, and in drilling process, widespread presence on the hole wall and the hole bottom soil disturbance. All of these affect the bearing capacity of bored pile play. Pile static load test show that, bored pile end bearing capacity of only the ultimate load of the 15% ~ 35%, the side resistance and tip resistance of the existing synchronization phenomenon. Give full play to the role of lateral friction resistance is only a few millimeters of the displacement of pile top, to give full play to the role of tip resistance of pile diameter, needed to reach 10% 30% of the displacement of pile top. Such a large displacement in engineering is not allowed. Pile side friction resistance to damage, and the damage limit is reached, and the end resistance cannot get sufficient play, its potential is great. This is the ultimate bearing capacity of bored pile is not to cause. 中英文资料 Research shows that, at the bottom of pile soil exists, not only affects the tip resistance of the play, also make the side friction resistance loss. The existence o。建筑工程灌注桩毕业论文中英文资料外文翻译文献(编辑修改稿)
相关推荐
钢盖。 ( 5)室外强、弱电窨井设置排水管道,直接排入就近的雨水管网。 其它要求: ( 1) 排水需按《重庆市建委初装验收标准》和《住宅设计规范》将排水设计到厨房、卫生间、阳台等排水点。 ( 2)卫生间采用全下沉方式设计,同时解决好卫生间通风排气的设计。 如果采用全下沉方式确有困难,应征得甲方同意后 ,选择合理的处理方式。 ( 3)所有功能房(如开备所、配电房、发动机房
告 2020 年 3 季度 14 点告负,地处西部内陆的重庆虽然较上一季度减少了近四成的新增开发量,但与去年同期相比高达 %的增幅表明区域市场总体仍然处于高速扩张状态中。 对住宅施工面 积指标的统计分析与新开工面积基本类似。 其共同之处在于,作为重点考察对象的地区或城市第三季度的相关指标,普遍低于二季度,在这一点上中西部板块及城市(如重庆)表现得更加明显。
功能或多功能的复合涂料已成为目前建筑涂料的发展主流。 其中:功能的复合化列举有以下几个方面:既防水又抗污,既有弹性又耐水性,既有弹性又能呼吸,既有弹性又能呼吸是指耐水弹性涂料与被亲水宫能团表面装饰微壳复合化,干燥后涂膜形成可控超滤器结构,水分子在亲水微壳间移动,弹性与透湿性并存,称呼吸弹性涂料。 对已有的水性树脂基料进行改性研究 例如在硅丙 水性树脂的开发方面,是以有机硅单体与丙稀酸单
箱 包装。 有机锗饮料 用 500ml 装的塑料瓶装瓶后,瓶上贴商标,再用产品 24 瓶装的纸箱包装。 有机锗酒用 500ml 装的酒瓶 装瓶后,瓶上贴商标, 每瓶 产品用 包装 盒 包装后,再用 6 瓶装的纸箱包装。 包装要达到国家饮料包装标准的要求。 延边石泉洞民族饮品有限公司扩建项目 第 四章 建设方案 17 选址 延边石泉洞饮品有限公司 占地面积 7000 平方米, 有 1100平方米
以有效地保持与客户之间的联系;及时发送 宝树实业公司 的最新企业消息;发送邀请函等。 信息中心发布系统 本系统主要支持对信息中心内的所有资料的上传、修改、删除等功 能,包括下载资料的链接和最新行业、公司新闻的更换等。 该系统支持时下流行的一些压缩文档格式,如:ZIP、 RAR 等。 方便需要索取资料的用户直接在线下载。 后台功能概括如下: 1.管理员用 word 方式进行排版
进了我的耳膜和心脏,接着小鼓铜锣一起轰鸣,一股原始混沌的神秘冲动和古老意念的混乱音符猛地从地底蹿出来通过双脚直抵进了我的心中,使我有了一种脱胎换骨般的剧痛的快感。 ⑤我像被魔语诅咒了似的,双目紧盯着他,只见他急敲慢敲,重敲轻敲,时而敲打鼓沿时而肘杵鼓面,时而跃腾猛捶,时而贴鼓轻抚,柔时如丝绸无骨,坚时像枪击钢板,乱时如乌云压顶,齐时如布兵排阵 ;铁马金戈乱箭飞,细雨轻风荷塘清,劈山开路是男儿