单片机智能小车毕业论文中英文资料外文翻译外文文献(编辑修改稿)内容摘要:
ectrical machine ring should match close, fasten tasseled phase can be to get very wide frequency band, because of the fast speed ring should be good, dynamic configuration sexual can perturbation resistance can force is powerful. According to the root, with more than ensemble close and this set of electrical machine control project by tolerance of the quantity and electrical machine speed straight flow of hair, the exhibitor to adopt the project with a single extremely H type can be changed into change device inverse PWM line speed. photoelectric detection module design The intelligent car was stuck on the black line running on white paper road, so this module design need to detect shop on the black rubber belt drive area, including Run straight along the arc district and driving district two area. Because of the black and white paper to light reflection coefficient is different, can according to receive reflected light. The strength of the judge road the black line. This paper USES is simple and practical detection methods, namely the infrared detection method. Infrared detection method, . use infrared ray in different colors of physical surface with different reflection properties characteristics. In the car driving process Continually to the ground to launch the infrared, when the infrared met white ground occurs when the reflected light, aimless and launch packed on the car of receiving tube receiving。 if Fruit is met black line is absorbed, and then the infrared cars receiving tube receiving less than signal. 1. 2 signal parative module design This part design USES a LM324 parator, of sensor signal voltage received pare and amplified, and will pare the results after Feed to the microcontroller, used to detect sensor sensitivity, diagram shown in figure 5 shows. When two sensors simultaneously detect light, straight forward. When the sensor can39。 t detect light, in cutoff state, double LM324 operational amplifier output low level to microcontroller, by program processing, If left Not detected light, then left correct direction。 If the right has not been detected light, then turn correct direction. 1. 3 motor control and driving module design Because use is double drive cars, this part of the circuit must be able to output of two different voltage values, respectively to controlling trolley right and left two motor drive, the two of the wheel speed and direction of the same or different, thus to control its advance and turning. In system design process, use two L9110 chips to connect SCM and dc motor respectively. L9110 is for control and drive motor design two channels pushpull power amplifier applicationspecific integrated circuit device, discrete circuits in monolithic IC integrated such that the peripheral equipments in lower cost and the whole machine can carry on sexual high. The core slice two a TTL/CMOS and let electricity flat lose into, have good antijamming, Two output terminal can pick flooding dynamic electric machine straight to the shipment of positive reverse move an。单片机智能小车毕业论文中英文资料外文翻译外文文献(编辑修改稿)
相关推荐
的最底端,另四条分别放置 在水塔内不同高度如图 35 所示。 图 35 传感器连接示意图 吉林工业职业技术 学院论文 15 此原理的电路设计比脉冲调制 式红外发射接收器 结构简单,方便。 此电路的灵敏度可以达到本设计的要求,能够准确地分辨出有水信号和无水信号不用调试便可很方便的使用。 由此可知,这种设计方案简单实用,元器件选用方便,费用低。 此电路无需调试,解决了第一种方案中调试繁琐
1/ A 922P 2. 0/ A 821U1A T 89 S 51R110KR210KR310KY112 M H zC730 p FC630 p F12345678P1 H E A D E R 8S1SWPBS2SWPBS3SWPBS4SWPBS5SWPBS6SWPBS7SWPBS8SWPBS9SWPBS 10SWPBS 11SWPBS 12SWPBS 13SWPBS 14SWPBS
MOV C, JC L2 STOP1: MOV C,。 = 0 时转移 JNC STOP1 LCALL DELAY1。 延时 MOV C, JNC STOP1 MOV 50H,00H LJMP MAIN。 设置闹钟。 SETATIME:LCALL DISPLAY2。 调用 DISPLAY2 显示闹钟 N0: LCALL DISPLAY2 MM2: JB ,N1。 =1 时转移 MOV C, JC
电后中断可唤醒 l 看门狗定时器 1双数据指针 l掉电标识符 功能特性描述: AT89S52 是一 种低功耗、高性能 CMOS8 位微控制器,具有 8K 在系统可编程 Flash 存储器。 使用 Atmel 公司高密度非易失性存储器技术制造,与工业 80C51 产品指令和引脚完全兼容。 片上 Flash 允许程序存储器在系统可编程,亦适于常规程器。 在单芯片上,拥有灵巧的 8 位 CPU
,但它有损于液晶屏的寿命。 1 VSS 电源地端 2 VDD 电源+ 5V 端 3 VEE 液晶显示器对比度调整端 4 RS 寄存器选择,高选数据寄存器、低选指令寄存器 5 R/W 读写信号,高为读、低为写 6 E 使能端,高电平跳变为低电平时有效 7~ 14 D0~ D7 双向数据口 1 16 LED+、 LED 调节液晶背光 郑州大学 本科毕业论文 9 123456A B C
8位双向 I/O口, P2口缓冲器可接收,输出 4TTL门电流,当 P2口被写“ 1”时,其管脚被内部上拉电阻拉高,且作为输入。 并因此作为输入时, P2口的管脚被外部拉低,将输出电流。 这是由于内部上拉的缘故。 P2口当用于外部程序存储器或 16位地址外部数据存储器进行存取时, P2口输出地址的高八位。 在给出地址“ 1”时,它利用内部上拉优势,当对外部八位地址数据存储器进行读写时,