at89c51单片机简介毕业论文中英文资料外文翻译文献(编辑修改稿)内容摘要:
/counters, serial port and interrupt system to continue functioning. The Power Down Mode saves the RAM contents but freezes the oscillator disabling all other chip functions until the next hardware reset. Pin Description: VCC Supply voltage. GND Ground. Port 0 Port 0 is an 8bit open drain bidirectional I/O port. As an output port each pin can sink eight TTL inputs. When is are written to port 0 pins, the pins can be used as 毕业论文 8 high impedance inputs. Port 0 may also be configured to be the multiplexed loworder address/data bus during accesses to external program and data memory. In this mode P0 has internal pullups. Port 0 also receives the code bytes during Flash programming, and outputs the code bytes during program verification. External pullups are required during program verification. Port 1 Port 1 is an 8bit bidirectional I/O port with internal pullups. The Port 1 output buffers can sink/source four TTL inputs. When 1s are written to Port 1 pins they are pulled high by the internal pullups and can be used as inputs. As inputs, Port 1 pins that are externally being pulled low will source current (IIL) because of the internal pullups. Port 1 also receives the loworder address bytes during Flash programming and verification. Port 2 Port 2 is an 8bit bidirectional I/O port with internal pullups. The Port 2 output buffers can sink/source four TTL inputs. When 1s are written to Port 2 pins they are pulled high by the internal pullups and can be used as inputs. As inputs, Port 2 pins that are externally being pulled low will source current (IIL) because of the internal 2 emits the highorder address byte during fetches from external program memory and during accesses to external data memory that use 16bit addresses (MOVX @ DPTR). In this application it uses strong internal pullups when emitting 1s. During accesses to external data memory that use 8bit addresses (MOVX @ RI), Port 2 emits the contents of the P2 Special Function Register. Port 2 also receives the highorder address bits and some control signals during Flash programming and verification. Port 3 Port 3 is an 8bit bidirectional I/O port with internal pullups. The Port 3 output buffers can sink/source four TTL inputs. When 1s are written to Port 3 pins they are pulled high by the internal pullups and can be used as inputs. As inputs, Port 3 pins that are externally being pulled low will source current (IIL) because of the 3 also serves the functions of various special features of the AT89C51 as listed below:Port 3 also receives some control signals for Flash programming and verification. 9 PIN FUNCTION RXD TXD INT0 INT1 TO T1 WR RD RST Reset input. A high on this pin for two machine cycles while the oscillator is running resets the device. ALE/PROG Address Latch Enable output pulse for latching the low byte of the address during accesses to external memory. This pin is also the program pulse input (PROG) during Flash programming. In norm。at89c51单片机简介毕业论文中英文资料外文翻译文献(编辑修改稿)
相关推荐
窗体后, Form1上的输出结果。 2. Private Sub Form_Click() Dim c As Integer, j As Integer, k As Integer k = 0 c = 1 For j = 1 To 6 If j 4 Then c = c + 5 Exit For Else k = k + 1 End If Next j Print c, k End Sub
对象名和成员运算符访问对象中的成员;通过指向对象的指针访问对象中的成员;通过对象的引用变量来访问对象中的成员。 类的封装性和信息隐蔽 公 用接口与私有实现的分离;类声明和成员函数定义的分离;面向对象程序设计中的几个名词的解释。 类和对象的简单应用举例 通过实例,介绍基于类和对象的程序的编写方法。 第十 章 关于类和对象的进一步讨论 构造函数 对象的初始化;构造函数的作用;带参数的构造函数
,哪些表面是在普通机床上加工。 整个零件加工工艺过程都要经过哪些工序,需要采用何种类型的机床将零件加工成形。 零件加工的工艺路线是指数控机床切削加工过程中 , 刀具 山东科技大学学生设计(论文) 15 设计项目及内容 主要结果 的运动轨迹和运动方向。 我们所选的工艺路线应能保证零件的加工精度与零件表面的粗糙度要求。 为提高生产率,在确定工艺路线时应尽量缩短加工路线 , 减少刀具空行程移动时间 ,
境因素。 KTV 中影响非固定因素的最为重要的因素是音乐, KTV 也借此缔结了人与人、人与环境的全新关系模式。 即人对环境接入模式,借助于音乐、视频。 激发联想、引起回忆、沉入陶醉、体现空间环境中的人性、人情、本我特征,这是 KTV 美学的基础和内涵。 音乐是最能体现人性美的艺术语言, KTV音乐是人们的心灵 的呼唤的声音,心灵交流的语言、心灵沟通的媒介、心灵交换的信息。 其柔和、朦胧的
化系统 佳乐 数字社区智能楼宇对讲 系统 泉州佳乐电器有限公司 福建泉州浔美工业区佳乐科技园 059522110888 Page 11 of 28 装修时移线对系统的影响),能最大限度的节约成本。 安装调试 “佳乐” 数字社区智能系统 安装调试简单,设备安装方便, 联网系统采用标准的综合布线架设调试方式,单元内系统 均采用 水 晶插头对接 方式,只需 按 T568B 标准 压 好水晶 插头
优势分析 技术优势 : XX 县 XX养殖农民专业 合作社 经过多年来的发展,积累了丰富的养殖经验, 经常邀请相关技术专家给社员讲课,并聘请专人担当合作社 的技术顾问。 全程 指导 蛋鸡生长 、 防疫等工作, 定期为合作社社员集中开展养殖技术和防疫培训,深入现场防疫和指导生产,并为养鸡产业化发展献计献策, 确保 鲜蛋质量。 合作社经多年发展,结合养殖实际,自主研发的自动清粪机、自动上料机