thebox-typelowmeltingpointglassmeltsealsstovemainlyuses(编辑修改稿)内容摘要:

ntined, the high alloy turbulent flow booster pressor casting, the exhaust pipe, the thin steel plate, the copper, the aluminum and so on colored profession and so on metal plate, belt, alloy ponents, chain link, welding wire, standard letter, silicon steel plate, tool, spheroidizing, machinery annealing processing. The portable cover furnace covers, in two stove places, two by a heating covers, a cooling cover is posed, heats up the cover to use the steel plate volume system to weld the formation densely, the furnace lining uses the energy conservation newest technology entire textile fiber modular structure, the furnace top folds the law high pressure for the entire textile fiber wave to tie up to hang the flat top, the high aluminum bolt loads clothing hung at full length the resistor tape, the furnace top installment diplopore quick freezing temperature decrease gate. The stove place for the heat preservation water cooling vacuum rubber seal structure, the stainless steel leads the wind seat stand, the high efficiency vacuum seal air blower. In covers for the stainless steel plate volume system welds the formation densely, covers the bottom flange and the vacuum seal groove by largescale sets up the vehicle lathe finishing processing formation. Cooling covers by the double air blower screw blows of fast vacuum pump is the 2X series turns on lathe piece type mechanical vacuum pump The portable cover furnace controls the warm cabi to use the microputer procedure craft curve high accuracy to control automatically warm, pletes the heat treatment craft curve Vacuum agglutination electric stove ZK2010(JZS16) vacuum agglutination electric stove is the energy conservation well type cycle work vacuum electric uses in astronautics, the aviation airplane manufacture profession, the automobile manufacture profession, the petroleum mechanical profession, the precision machinery manufacturing industry, the metal or the nonmetallic material and the ponents vacuum agglutination. Also may use in the precision part or the fing luminous nonoxidation does not decarbonize using of the heat treatment and the product conforms to the Chinese Aviation Ministry of industry military standard GJB5099888 I kind of vacuum agglutination electric stove. Mainly is made the well type furnace shell by the steel plate volume, welds by the section group is made furnace body structure . The furnace lining conservation refractory brick, the furnace lining and the furnace shell clamps sets at the aluminum silicate textile fiber felt, the crevice packing inflation heat preservation powder, belongs to model energy conservation furnace lining , Electricity saving . The electric heating part uses the domestic and foreign unification standard new to bear ultra warm high temperature resistance wire 0Cr25Al5, the vacuum tank uses the 1Cr18Ni9Ti stainless steel plate volume system, uses the protection automatically to weld densely, tries after my factory largescale X light crack detection room crack detection to suppress. The bung uses in the stainless steel to keep warm the bung, the bung kneading board and the shell of tank uses the dark double water cooling vacuum rubber seal, on the stove kneading board the installment has pulls out the vacuum connection, delivers the protective atmosphere connection, the vacuum pressure gauge. The bung and the stove pot are depend on the workshop driving to hang the entire vacuum tank the natural air cooled or the basin force fast cold, in order to loading and unloading work order to enhance the production efficiency, may order two real pot in turn continued operations. Also may along with the stove natural vacuum agglutination electric stove uses turns on lathe the piece type mechanical vacuum pump to refuel proliferates the pump to pull out vacuum or the forvacuum sufficient nitrogen protection continuously, uses in nonoxidation heatings and so on vacuum agglutination, light annealing, tempering, quenching. Vacuum tubular resistance furnace The vacuum tubular resistance furnace (quartz heating furnace) is the energy conservation cycle work vacuum resistance furnace, the host uses in the metallurgy profession, the industry and mining enterprise, the universities, colleges and institutes, the scientific research unit makes the vacuum heating, the vacuum agglutination, the nanomaterials agglutination and so on each use. The vacuum tubular resistance furnace outer covering is made by the steel plate volume, the chamber the fireproof material burns the porous circular cylinder by Gao Lvzhi, the furnace lining and the furnace shell uses the aluminum silicate textile fiber and the ultra light quality heat preservation resistance wire uses high alloy resistance wire 0Cr25Al5, circles makes the spiralshaped arrangement at the chamber all around. Lower part the furnace body installs by four pulleys, may make the axial motion on the vacuum tubular resistance furnace the chamber the placement has the stainless steel vacuum tube, pulls out the vacuum from the vacuum tube, rear end exhausts or enters the circle the system in the vacuum tubular resistance furnace body installment by the multilayered copper pipe the horizontal field winding, must let water through cooling. Roller resistance furnace The RG2 series roller type resistance furnace is the national standards energy conservation cycle work drum stove, mainly for the ball bearing, the roller, the thin shape steel disk and so on in groups the small metal parts heat treatment uses. The RG2 series roller type resistance furnace outer covering is made the rectangle furnace body by the steel plate and the furnace lining uses the ultra light quality high strength energy conservation refractory brick, t。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。