英语学习一定要养成的20个习惯(编辑修改稿)内容摘要:

peared clumsy. Our son clapped behind us, daddy is holding mummy in his arms. His words brought me a sense of pain. From the bedroom to the sitting room, then to the door, I walked over ten meters with her in my arms. She closed her eyes and said softly。 don39。 t tell our son about the divorce. I nodded, feeling somewhat upset. I put her down outside the door. She went to wait for the bus to work. I drove alone to the office. 因此,第一天当我开始执行抱妻行动时,我俩的举动都显得非常笨拙。 我们的儿子跟在后面,边拍手掌边欢呼“爹啲把妈咪抱在手上咯。 ” 他的话带给我痛苦的感觉。 从卧房到起居室,再到大门,我抱着妻子走了超过十公尺的路。 她闭上双眼轻轻地说,别告诉儿子我们离婚的事。 我点点头,有点难过。 我把妻放到大门外,她走去公车站等车上班,我自个儿开车到公司去。 On the second day, both of us acted much more easily. She leaned on my chest. I could smell the fragrance of her blouse. I realized that I hadn39。 t looked at this woman carefully for a long time. I realized she was not young any more. There were fine wrinkles on her face, her hair was graying! Our marriage had taken its toll on her. For a minute I wondered what I had done to her. 第二天,我俩的举止都比昨天自然多了。 妻斜靠在我胸部上,我还闻得到她外套上芳香的味道。 我突然意识到我已经有很长一段时间没有好好地细心留意过这个女人了。 我意识到她已不再年轻,一些细小的皱纹爬上了她的脸,她的满头乌丝有几根开始转成灰白。 我们的婚姻已然给她带来损耗。 有那么片刻,我诧异曾为她做过了什么。 On the fourth day, when I lifted her up, I felt a sense of intimacy returning. This was the woman who had given ten years of 【学而网】英语学习频道 【学而网】 英语学习频道 首页 | 学而之道 | 经典赏析 | 童话故事 | BBC 广播剧 | 经典歌曲 | VOA 特别英语 | 学而论坛 3 her life to me. 第四天,当我把妻抱起时,我感觉到久违了的一股亲密情感似乎又回来了。 就是怀中的这个女人,曾把她生命中美好的十年光阴给了我。 On the fifth and sixth day, I realized that our sense of intimacy was growing again. I didn39。 t tell Dew about this. It became easier to carry her as the month slipped by. Perhaps the everyday workout made me stronger. She was choosing what to wear one morning. She tried on quite a few dresses but could not find a suitable one. Then she sighed, all my dresses have grown bigger. I suddenly realized that she had grown so thin, that was the reason why I could carry her more easily. Suddenly it hit me。 she had buried so much pain and bitterness in her heart. Subconsciously I reached out and touched her head. 在第五和第六天,我意识到我们之间的亲密情感越来越强烈。 我没有告诉露这些。 随着日子一天天地溜走,我似乎越来越容易抱动她,也许是每天如此的抱抱运动令到我的。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。