网络电话使用手册(编辑修改稿)内容摘要:
wser will prompt you to enter the “User name” and “Password: as shown below. 9 One Chunnel GSM Gateway Enter the User name and Password and the press OK to access the GoIP Gateway Web Server. The default for both user name and password is “admin”. Status The Status page shown below is the default / home page of the GoIP Web server. Phone Information A. Serial Number Each Gateway has a unique serial number assigned by the factory such as HT304O12VTEST01. This number is important for centralized configuration, technical support, and warranty. This number is printed on the bottom of the Gateway and is associated with your software license. B. Firmware Version Firmware version identifies the firmware version of the Gateway such as . C. Hardware Mode This field shows terminal’s hardware type. D. Phone Status This field shows the status of Line’s connection status. If the connection is successful, this field displays LOGIN。 otherwise, it displays LOGOUT. Network Information A. LAN Port Configuration This field displays the status of the LAN port. B. PC Port Configuration This field displays the status of the LAN port. C. PPPoE If PPPoE is enabled, it displays its status. D. Default Route 10 One Chunnel GSM Gateway This field displays the IP address of the default routing Gateway. E. DNS Server This field displays the IP address of the Domain Name Server. GSM Module Information A. GSM Module This field displays the GSM module type. B. GSM Signal This field displays the GSM signal type. C. GSM Status This field shows the status of GSM connection status. If the connection is successful, this field displays LOGIN。 otherwise, it displays LOGOUT. Configurations Click on the “Configurations” tab on the left hand column to access the device configuration menu: Preference, Network, Call Settings, Call Divert, Save Changes, and Discard Changes. Click on “Preference” in the left menu of the configuration web, and the screen will be displayed as below: 11 One Chunnel GSM Gateway Language Currently GoIP supports English, Simplified Chinese and Traditional Chinese. Select the language desired and the Web page will be shown in the language selected accordingly. The language can also be selected at the top of the web page. Once selected, the webpage language is refreshed immediately. However, the language selection is not saved until the Save Changes icon is clicked. Time Zone and Time Server The GoIP Gateway supports Network Time Protocol (NTP) to obtain the date and time information from an NTP server (Time Server). The time zone is specified as in GMT 177。 offset. For example, the Pacific Standard Time is GMT8, and the Pacific Daylight Time is GMT7. Note: The GoIP Gateway supports CDR and Billing Information, it is important to set up these two parameters properly. 12 One Chunnel GSM Gateway AutoProvision The GoIP Gateway supports Auto Provisioning which enables configuration parameters to be set automatically without human intervention. The Auto Provisioning supports both HTTP and TFTP protocols. For higher security, encrypted configuration file is also supported. This feature requires external Auto Provisioning Server. Please contact your service provider for further information on this. Network Tone Network Tones are a set of tones used for VoIP calls. Select one of the countries defined or customized to define your own Network Tones. You can configure the Network Tones as Customized option: Each tone listed above is defined in the following format: nc, rpt, c1on, c1off, c2on, c2off, c3on, c3off, f1, f2, f3, f4, p1, p2, p3, p4 Where: nc is the number of cadences rpt is the repeat counter(0 infinite, 1~n repeat 1~n times) c1on is the cadence one on (in milliseconds) c1off is the cadence one off (in milliseconds) c2on is the cadence two on (in milliseconds) c2off is the cadence two off (in milliseconds) c3on is the cadence three on (in milliseconds) 13 One Chunnel GSM Gateway y c3off is the cadence three off (in milliseconds) f1 is the tone 1 frequency (300Hz3000Hz) f2 is the tone 2, frequency (300Hz3000Hz) f3 is the tone 3 frequency (300Hz3000Hz) f4 is the tone 4 (300Hz3000Hz) p1 is the attenuation index for f1, 0~31(0=3dB, 1dB increments) p2 is the attenuation index for f2, 0~31(0=3dB, 1dB increments) p3 is the attenuation index for f3, 0~31(0=3dB, 1dB increments) p4 is the attenuation index for f4, 0~31(0=3dB, 1dB increments) For example, the tone definition for a tone of 450Hz with a cadence of 700 ms on and 1000 ms off is 1,0,700,1000,0,0,0,0,450,0,0,0,20,0,0,0 Call Settings Click on the “Call Settings” to configure the VoIP call settings. The first thing to set is the Endpoint Type: or SIP. Phone For protocol phone, 2 configuration modes are supported: Single Configuration and Configuration by Group. Single Configuration The Single Configuration supports only one VoIP number to a single Gatekeeper.。网络电话使用手册(编辑修改稿)
相关推荐
( 1)抒情词。 苏轼的抒情词具有严肃博大的特点,具体包括从政之情、爱国之情、怀古之情、人伦之情等。 ( 2)咏物词。 苏轼词中约有 30 首咏物词。 他的咏物词形神兼备,富有寄托,代表作有《卜算子》(缺月挂疏桐)和《水龙吟》(似花还似非花)等。 ( 3)农村词。 苏轼的农村词约有 10 多首,代表作为《浣溪沙》五首,时 作者在徐州任上。 苏轼词风可分三类:( 1)豪放风格。
6. 根据马斯洛的需求层次理论,高收入的网络消费者需 求情况中 _______需求 所占的成分最多。 (A) 自我实现 (B) 社交 (C) 安全 (D) 生理 答案: A; 7. 根据马斯洛的需求层次理论,低收入的网络消费者需求情况中 _______需求 所占的成分最多。 (A) 自我实现 (B) 社交 (C) 安全 (D) 生理 答案: D; 8. 现代管理学从心理学、社会学
简单的人机对话;个性化,适合个性化学习;更新的频率要高等。 此外,各个网络教育单位也通过问卷调查、学生考试成绩等方式获取质量认证方面的信息,但往往更注重从生源与办学效益的角度出发,而忽略了网上学习自身一些规律性的东西。 上述一些标准和原则是零散而不成体系的,网络教育质量保证体系的缺乏使参加网络课程得到的学习认证难以和正规课程教育相提并论,造成社会上对网络教育、特别是学历教育的认可度不高。
电子商务重新定义了传统的流通模式,减少了中间环节,使得生产者和消费者的直接交易成为可能,从而在一定程度上改变了整个社会经济运行的方式。 网络消费 者的类型 按照网络消费者的消费主体为依据划分的话,网络消费者可分为个人消费者,企业消费者,网络消费者三大类 个人消费者 个人消费者对电子商务的需求是最现实的 , 是电子商务的主要市场。 网络上的用户 , 由初期的学术团体与科技机构 ,
投入逐年增多, 2020年 国家科学技术奖励工作办公室在“国家科学技术奖励网”公布了 2020 年度国家科学技术奖励初评结果。 其中“相约健康社区行巡讲精粹”丛书、“院士科 普书系”、《数学家的眼光》、“中国儿童百科全书”等 8 种书入围。 我国首次把科普图书纳入国家科学技术进步奖。 在这种大好形式下,怎样更快更好更多地把科研成果转化为公众可接受的普及知识仍然是亟待我们去探索的重要课题。
进入 d 盘,启动 ghost 目录下面的 就会出现下面的情况 d:\ghost\RTSPKT 0x60 line speed:100M System: [345]86 processor, PCI bus, Two 8259s Packet driver software interrupt is 0x60 Interrupt number is 0x9 I/O port is 0x6100