英语四级写作高分突破专项训练(二)(编辑修改稿)内容摘要:

etitionCompetition makes people active and creative. It is very necessary to pete if human society wants to advance. Without it, we would bee lazy and nobody would take any responsibility.“Three monks,there will be no drinking water.”This Chinese proverb vividly describes why China s productivity was so low before Mr. Deng came into power. At that time, we had the so called planned economy. There was no petition at all. So farmers didnt work hard. Workers didn t work hard. China was on the edge of can stimulate people to try their best to do things. For example, in 100 meter race, each sportsman runs as quickly as possible, trying to win the champion, the same things happen in our society and in our daily life. If a pany wants to surpass, it must pete with them. It must raise its efficiency. All the panies doing this will no doubt benefit the whole society and the whole human a student, I must pete with other students in our studies. I must study hard in a。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。