考研英语大作文写作攻略及必背模板句型范文(编辑修改稿)内容摘要:

xtraordinary sophistication and versatility, which promises to reshape our lives and our world. 电视,这项以迅速变化和成长为标志的最普及和最有影响力的现代技术,正在步入一个新时代,一个极为成熟和多样化 的时代,这将重塑我们的生活和世界。 The greater the population there is in a locality, the greater the need there is for water, transportation, and disposal of refuse. 一个地方的人口越多,对其水、交通和垃圾处理的需求就会越大。 Adler is correct in his assertion that education does not end with graduation. 阿得勒的这句话很正确,教育不能随着毕业而结束。 With the opening and reform policy being carried out, thousands upon thousands of foreign visitors are crowding into our country. They are eager to see this old mysterious land with a splendid culture of more than 5,000 years. 随着改革开放政策的贯彻执行,数以万计的外国游人涌入中国。 他们渴望参观这个有着五千多年灿烂文化的神秘古国。 On no account can we ignore the value of knowledge. 我们绝对不能忽视知识的价值。 There is no denying the fact that air pol。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。