浅谈我国复混肥料(复合肥料)工业(编辑修改稿)内容摘要:
calcium nitrate, ammonia neutralization of mother liquor and evaporation process of slurry are discussed based on its increasing slurry viscosity, rowing fine crystal and troubling filtration in production of nitrophosphate by nitric acid deposing phosphate rock. Adopting concentrated phosphate rock raw material and making some technological improvements are feasible ways for stable operation before a reliable defluorinated technique from liquid phase is invented. 硝酸磷肥装置粉尘回收系统的改造 李阳宝,薛继勇,尹 汾,牛 山,薄奋勇 (天脊煤化工集团公司,山西 潞城 047507) 【饲料磷酸盐】 混合法生产磷酸二氢钙 葛 斌 (襄樊市化工厂,湖北 襄樊 441002) [关键词] 磷酸二氢钙;混合法;工程设计; 生产;效益 [摘 要] 介绍以湿法磷酸生产的饲料级磷酸氢钙和热法磷酸为原料,采用混合法 — 气流烘干流程生产磷酸二氢钙的方法。 着重谈了在此种流程的工程设计和生产中应注意的问题。 对以常见的 4种钙品粉体直接与热法磷酸混合生产磷酸二氢钙的效益作了简评。 Production of MCP by mixing process GE Bin (Xiangfan Chemical Factory, Xiangfan, Hubei 441002, China) Key words: monocalcium phosphate (MCP)。 mixing process。 engineering design。 production。 benefit Abstract: The feed grade DCP by wetprocess phosphoric acid production and thermalprocess phosphoric acid are as raw materials for MCP production with mixingpneumatic drying process. The engineering design of process and operation are discussed and the MCP benefits are pared, which are manufactured by 4 calcium chemicals reacting with thermalprocess phosphoric acid respectively. 【硫 酸】 硫酸生产中内喷文氏管的设计 李烈栋 (湖南今天化肥化工股份有限公司 松化分公司,湖南 常宁 421513) [关键词] 硫酸;内喷文氏管;旋转流;喷头 [摘 要] 从分析内喷文氏管喷头旋流特征入手,建立有关数学模型或表达式,提出对内喷文氏管喷头、收缩管支管内径、喷嘴与喉管距离进行设计的方法,并对设计中值得注意的问题进行理论和实践上的讨论。 Phosphate amp。 Compound Fertilizer 6 Design of Venturi scrubber with internal injection in sulfuric acid production LI Liedong (Songhua Branch, Jintian Fertilizer and Chemicals Co., Ltd, Changning, Hunan 421513, China) Key words: sulfuric acid。 Venturi scrubber with internal injection。 swirl fluid。 sprayer Abstract: Beginning at the characteristic analysis of swirl fluid in Venturi scrubber with internal injection, some concerned mathematical models and expressions are established. Then the design methods for the sprayer, inner diameter of shrinking pipe branch, spout and choke are presented. Some design items in theory and practice are discussed. 干燥塔的技术改造 赵 霞 (番禺凤山实业总公司,广东 广州 511483) 【复 混 肥】 30 kt/a 复混肥生产线的运行经验 熊惠文 (安徽华星化工股份有限公司,安徽 和县 238251) [关键词] 复混肥;运行;经验 [摘 要] 根据 30 kt/a复混肥生产线运行中存在的问题及其处理所取得的经验,讨论在复混肥设计中,设备的平面布置、设备 (如固体输送机、链磨机、烘干机等 )选用时应注意的问题。 Performance of pound fertilizer plant with 30 kt/a capacity XIONG Huiwen (Huaxin Chemical Stock Co., Ltd, Hexian, Anhui 238251, China) Key words: pound fertilizer。 operation。 experience Abstract: Based on some existing problems in the operation of pound fertilizer plant with 30 kt/a capacity and experiences to solve the problems, some suggestions for plant design are presented about the selection and layout of equipment, including solid conveyer, chain crusher and drier. 过磷酸钙在高浓度复肥生产中的应用 张洋球 (安庆石化 复合肥厂,安徽 安庆 246001) [关键词] 高浓度;复混肥;生产;过磷酸钙;应用 [摘 要] 通过技改,在高浓度复肥生产中掺用一定量 (每吨产品加入 66kg SSP)理化性质欠佳的过磷酸钙,改进了高浓度复肥的生产配方,每吨原料生产成本降低 21 元,能耗降低 6 元, 5万吨 /年复肥厂年创经济效益 135万元。 Application of SSP in highanalysis pound fertilizer production ZHANG Yangqiu (Compound Fertilizer Plant of Anqing Petrochemical Company, Anqing,Anhui 246001, China) Key words: highanalysis。 pound fertilizer。 production。 single superphosphate (SSP)。 application Abstract: Through experiment, a modified formula is given of 66 kg SSP raw material with poor physicochemical property in per ton finishing product of highanalysis pound fertilizer, which results in decreasing 21 RMB Yuan raw material cost and 6 RMB Yuan energy consumption. So, annual economic benefit of million RMB Yuan will be brought for pound fertilizer plant with 50kt/a capacity. 低温下熔融原料生产复合肥 Phosphate amp。 Compound Fertilizer 7 包同力 (宁夏丰友化工有限公司 ,宁夏 银川 750021) 尿素 过磷酸钙系复混肥“析晶”的原因及预防措施 张志勇,李志远 (山东农业专用肥料厂,山东 齐河 251121) [关键词] 尿素;过磷酸钙;复混肥;析晶;规律 [摘 要] 尿素 过磷酸钙系复混肥料在夏季存放时易出现“析晶”现象,导致产品粉化而带来经济损失 ,对该问题进行初步的原因分析,并提出几种预防措施。 The cause of crystal precipitation in pound fertilizer based on ureaSSP and its preventive measures ZHANG Zhiyong, LI Zhiyuan (Shandong Agricultural Specialty Fertilizer Plant, Qihe, Shandong 251121, China) Key words: urea。 single superphosphate (SSP)。 pound fertilizer。 crystal precipitation。 rule Abstract: In summer storage, pound fertilizer based on ureaSSP is likely to crystal precipitation and crash, leading to economic loss to the producer. The causes are examined and several countermeasures are presented. 尿素 过磷酸钙系复混肥料生产的一种新工艺 董 彬 (四川康达集团 复合肥厂,四川 威。浅谈我国复混肥料(复合肥料)工业(编辑修改稿)
相关推荐
Δ y≥ 2 上式表明 , 微观粒子的坐标和动量不能同时确定。 牛顿力学的轨道概念在微观领域失去意义。 6. 按照牛顿理论的观点能量是连续变化的 ,但在微观领域 ,实验观测到的原子光谱是分立的 ,说明微观领域的粒子能量可以取分立值。 牛顿力学及其时空观念 ,在人类对自然相 现象的观测和实验中遇到的困难还有很多 ,以上只是选择了一些比较重要的 ,并能和中学教学相联系的典型例子。
个人都必须加强学习,活到老要学到老。 中学阶段是学习的黄金时代,中学生更应该刻苦学习,掌握真才学识,只有这样才能成为国家有用人才,不被时代淘汰。 通过学习目的的教育,可以使学生正确认识学习的意义及重要性,从而形成长远的间接的兴趣,产生正确的学习态度,提高学习的热情与学习的自觉性。 培养并激发学生具有强烈的 求知欲和浓厚的学习兴趣。 培 养学生的求知欲
学会对榜样进行合理选择,提高分析能力。 通过分析,使学生了解什么样的榜样更适合自己,同时对照自己,找出差距,明确努力方向,并见诸于行动。 学生所崇拜的榜样:如革命领袖、历史伟人、杰出人物和各方面的英雄模范,这些人物的崇高品德,伟大业绩和光辉形象对学生有巨大的典范指引作用。 学生最接近的榜样:如教师、家 长和其他长者,他们的言行,作风和各方面的表现对学生起着直接示范作用,有着潜移默化的影响。
愿违,最终发生了一次次漏泄事故后,再去重新研究方案进行治理,结果是多交了一次次学费。 有许多时候真是痛中思痛,追其根本原因就是马虎草率所致,就是对 产生磨损机理不去研究和探讨,说轻了是对工作不负责任,说重了是对防磨技术不懂,拿着企业效益当儿戏的具体表现。 循环流化床锅炉的燃烧采用的是低温循环燃烧,它的燃烧效率之高主要是靠多次的大循环和炉内成千上万个小循环来实现的。
对于 后进生 ,我们不要认为他们是铁板一块,“不可救药”,要用发展的观点来对待,他们身上还有不被人注意的“闪光点”,而这恰恰是 后进生 进步的“火种”和“光源”。 在班级管理中,我特别注意去努力发现“ 后进生 ”的长处,以便拿到开启他们心灵,矫正他们行为的“金钥匙”。 “闪光点”一经发现,就要为它的发展创造条件,像幼芽需要合适的土壤、温度和湿度一样,要发挥班集体的力量,造成有利于 后进生转化
保险公司按比例支付 赔偿数额,超过比例部分,医院自负。 医院投保的初衷,希望发生医疗损害赔偿费用保险公司能够全额承担赔偿,以解决无法预测的赔偿风险,而保险公司的限额做法,无法解决风险的转移和保障作用,造成医院认为买与不买保险差异不大,每年用于买保险的费用也足够支付赔偿费用,买保险可能花费更大。 (三)保险公司现行收取的保费有限,影响保险公司增加赔偿费用比例。 根据某保险公司的报告,一年收保费