word模板之国外report内容摘要:

in the Header so it looks much lighter on screen than it actually is. Print the page to see actual colors.  To save time in the future, you can save the front cover of this report with your pany name and address. For stepbystep instructions on how to preserve your changes with the template, please read the following section. How To Modify This Report To create your own version of this template: 1. Insert your pany information in the address in the frame on the bottom of the cover page. 2. Choose File Save As. At the bottom of the menu, choose Document Template in the Save File as Type: box. Save the file under a new name to protect the original, or use the same name to replace the existing version. To create a document, choose File New and choose the template you just created. Your pany information should appear in place. How to Create a Footnote To create a footnote, choose Footnote from the I。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。