语法复习二:主谓一致16开内容摘要:

and I ____ his students. 4. Mary as well as her sisters ____ Chinese in China. A. are studying B. have studied C. studies D. study 5. Neither my father nor I ____ at home. 6. Not only my brother but also I ____ good at painting. Both of us ____ good painters.,。 are。 am。 are。 is 11 7. Every39。 boy and every girl ____ to attend the evening party. like 8. Over 80 percent of the population of China ____ peasants. C. would be 9. The population of China ____ larger than that of .any other country in the world. 10. Every means ____ tried but without any result. A. have been to be to be D. has been 11. Alice, together with two boys,____ for having broken the rule. A. was punished B. punished C. were punished D. being punished 12. The League secretary and the monitor____ asked to attend the .meeting this afternoon. being 13. The great writer and professor____. A. is an old man B. are both old men C. is an old man and a young man D. were two Chinese 14. There ____ a pen, two pencils and three books on the desk. 15. A large number of students in our class____ girls. A. are B. was C. is D. be 16. The number of deer, mountain lions and wild roses ____ much if people leave things as they are. A. doesn39。 t change 39。 t change 17. The Arabian Nights ____ well known to the English. A. is B. are C. was D. were 18. Chairman Mao39。 s works ____ published. A. has been been 19. A chemical works____ built there. A. is to being been C. were to been 20. The Olympic Games ____ held every ____ years.。 four。 four。 five。 five 21 .The United Stat。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。