bsen818-3-1999升降用的短节链条安全吊链用中等公差链条4级内容摘要:
ains those hazards which require action to reduce risk identified by risk assessment as being specific and significant for short link chain (medium tolerance) grade 4. Table 1 — Hazards and associated requirements Hazards identified in EN 1050:1996, annex A Relevant clause of EN 2922:1991/A1:1995, annex A Relevant clause/subclause of this part of EN 818 1e) Mechanical hazard due to inadequacy of strength 5 5 5 6 7 8 9 5 Safety requirements General The chain shall also conform to the appropriate requirements of EN 8181:1996. Dimensions Nominal size of chain, dn The nominal size of the chain shall be one of the sizes listed in Table 2, column 1. Tolerance on material diameter (except at the weld) The tolerance on the material diameter for each nominal size of chain shall be in accordance with Table 2, column 2. Page 6 EN 8183:1999 169。 BSI 091999 Weld diameter The maximum diameter at the weld for each nominal size of chain shall be in accordance with Table 2, column 3. The thickness of the steel at the weld shall nowhere be less than the actual diameter of the steel adjacent to the weld. Length dimensionally affected by welding The length dimensionally affected by welding e (see EN 8181:1996, Figure 1) shall not extend by more than 0,6dn to either side of the centre of the link. Pitch and widths The dimensions of the pitch and widths of the individual links and chain shall be as specified in Table 2, columns 4 to 8, and illustrated in EN 8181:1996, Figure 1. Table 2 — Dimensions Dimensions mm (1) (2) (3) (4) (5) (6) (7) (8) Nominal size dn Material diameter tolerance Weld diameter ds max. Pitch Internal width away from the weld w1 min. External width over the weld w2 max. pn pmax pmin 7 177。 0,28 7,7 21 21,6 20,4 9,1 25,9 8 177。 0,32 8,8 24 24,7 23,3 10,4 29,6 10 177。 0,4 11 30 30,9 29,1 13 37 13 177。 0,52 14,3 39 40,2 37,8 16,9 48,1 16 177。 0,64 17,6 48 49,4 46,6 20,8 59,2 18 177。 0,9 19,8 54 55,6 52,4 23,4 66,6 19 177。 1 20,9 57 58,7 55,3 24,7 70,3 20 177。 1 22 60 61,8 58,2 26 74 22 177。 1,1 24,2 66 68 64 28,6 81,4 23 177。 1,2 25,3 69 71,1 66,9 29,9 85,1 25 177。 1,3 27,5 75 77,3 72,8 32,5 92,5 26 177。 1,3 28,6 78 80,3 75,7 33,8 96,2 28 177。 1,4 30,8 84 86,5 81,5 36,4 104 32 177。 1,6 35,2 96 98,9 93,1 41,6 118 36 177。 1,8 39,6 108 111 105 46,8 133 40 177。 2 44 120 124 116 52 148 45 177。 2,3 49,5 135 139 131 58,5 167 Page 7 EN 8183:1999 169。 BSI 091999 Materials and heat treatment Quality of material General Within the limitations given in to the chain manufacturer shall select the type of steel to be used so that the finished chain, when suitably heattreated, meets the mechanical properties specified in this part of EN 818. Type of steel The steel used shall be produced by an electric process or by an oxygen blown process. Deoxidation The steel shall be fully killed as defined in EN 10025:1990/A1:1993, be stabilized against strain age embrittlement and have an austenitic grain size of 5 or finer when tested in accordance with ISO 643. Chemical position To ensure that chain is stabilized against strain age embrittlement during service the steel shall contain at least 0,025 % aluminium. The steel shall contain no more sulfur and phosphorus content than the limits given in Table 3. Table 3 — Sulfur and phosphorus content Element Maximum mass content % as determined by Cast analysis Check analysis Sulfur 0,025 0,030 Phosphorus 0,025 0,030 The silicon content shall be as specified in Table 4. NOTE The purpose of this requirement is to limit the detrimental effect when the chain is used in a galvanizing bath. Table 4 — Silicon content Element Mass content % as determined by Cast analysis Check analysis Silicon 0,12 to 0,30 0,15 to 0,35 Heat treatment All the chain shall be heattreated in accordance with a) or b) before being subjected to the manufacturing proof force. a) Chain shall be hardened from a temperature above the AC3 point and tempered. The tempering temperature shall be at least 475 176。 C. The tempering conditions shall be at least as effective as a temperature of 475 176。 C maintained for a period of 1 h. NOTE A method of verification is to test sample chains after they have been reheated to and maintained for 1 h at 475 176。 C and then cooled to room temperature。 following which they should conform in the finished condition to the requirements of and . b) Alternatively the chain shall be normalized from a temperature above the AC3 point. 169。 BSI 091999 Page 8 EN 8183:1999 Mechanical properties Manufacturing proof force (MPF) All the chain shall be subjected to the manufacturing proof force specified in Table 5, column 3 for the appropriate nominal size of chain. Breaking force (BF) and total ultimate elongation (A) Samples of chain in the finished condition shall have a breaking force at least equal to that specified in Table 5, column 4 for the appropriate nominal size of chain. On pletion of the static tensile test the total ultimate elongation as defined in EN 8181:1996 shall be not less than 25 %. Bend deflection Single link samples shall withstand the minimum deflection specif。bsen818-3-1999升降用的短节链条安全吊链用中等公差链条4级
相关推荐
三区景观规划示意图 图 10:园区总体规划 问题 3:金鸡湖于苏州市究 竟 处在什么地位。 解答:金鸡湖对于苏州的意义:它不仅是苏州工业园区的原点,也将是苏州城市发展战略中的重点。 图 11:金鸡湖景观规划 金鸡湖位于工业园区的中心地带, 环湖区域 70 平方公里 , 1994 年中国政府与新加坡政府签订了一个合资协议,正式启动对这片 平方公里 滨水社区的开发,旨在建造一个符合国际标 准
10%. 进行投资前必须提交投资申请报告,按照审批权限经主管财务的副总经理或公司总经理批准后方可执行. 公司在进行长期投资之前,应由投资项目小组进行投资立项的前期调查和可行 性研究,包括投资环境、投资机会、投 资收益和投资风险的分析。 对每一个投资项目方案,均应编制预期现金流量表,通过考核以下指标,筛选出最佳投资方案: 投资方案的净现值 投资方案的内部报酬率 投资方案的回收期
总结 在这次课程设计中我编写了两个程序,这是第二个,第一个因为不能使编号唯一而放弃,在老师指导下终于知道怎样让编号不会重复,然后在这个程序里集合了第一个程序里的优点,再加以改善,使得这个程序更加简洁实用,在编写的过程中,虽然遇到了各种各样的问题,但我都一一化解,把一个个错误解 决后心情都是非常畅快的,通过这次课程设计,让我真正地把学到的知识 应用于实践,从而使得自己对知识的 掌握程度得以加深加固
导线。 II 类器具 其电击防 护 不仅依 靠 基本绝缘 , 而 且提供 如 双重绝 缘 或加强绝 缘 那样的 附 加安全 防 护措 施的器具。 该类器 具 没有保 护 接地或 依 赖安装 条 件 的 措施。 注 1:该类 器 具可 以 是下述 类 型之一: —— 具有 一 个耐久 的 并且基 本 连续的 绝 缘材料 外 壳 的 器上 , 除铭牌 、 螺钉和 铆 钉等小 零 件外, 其外壳能 将
[Al Mg4,5Mn0,9] ................................................................................... ................. 39 Table 31 — Alloy EN AW5086 [Al Mg4] ..........................................
表,以反映他们的意见。 选举办法 行政部协助组织安排员工代表的选项举活动。 车间员工推举 本部门的员工代表候选人,要求候选人需具备以下条件: a)不担任任何管理性职务;。 b)连续工作时间相对较长; c)工作勤奋,遵规守纪; d)关心集体,有团队精神 , 热心员工福利、文化活动 , 愿意为其花费自己时间及精 德信诚 培训网 更多免费资料下载请进: 好好学习社区 力; e)有较好的语言表达能力。