bsen840-1-20xxmobilewastecontainers—part1containerswith2wheelswithacapacityupto400lforcomblif内容摘要:
4 Volumes This standard identifies the two classes of containers: Class I small size (nominal volume up to 200 l)。 Class II large size (nominal volume between 200 l and 400 l). Within the two abovementioned classes of containers the volumes shown in Table 1 are identified. Table 1 — Volumes 80 5 100 5 1206 210 5 240 5 34025 For methods of measuring capacity see EN 8405. The volumes shown in Table 1 correspond to mobile waste container39。 s capacities at present used in Europe. Since there are some overlapping capacities due to the tolerances, client and manufacturer shall decide while ordering the capacity chosen. Nominal volumes different from those referenced in Table 1 can be used by agreement between user and manufacturer. The tolerance of the volumes shall be 177。 10 % maximum measured according to EN 8405. 5 Dimensions and design The design of the containers need not correspond to the drawings given in Figure 1. The functional dimensions given in Tables 2 and 3 shall be respected. Remendations for manufacturers of lifting devices are given in annex B (see also EN 15011). The container shall be constructed so that when it is unloaded or loaded with a nominal load (see clause 6), it fits on an approved patible lifting device. It shall be automatically locked safely into the lifting device during the lifting operation. The frontal receiver shall correspond to one of the options given in Figure 2 (Form A, B or C). The lid(s) shall fit the body. It/they shall be made with at least 2 fixing points and have at least one means of opening. EN 8401:2020 (E) 6 Each wheel shall be capable of withstanding a static load of 100 kg. All the surfaces of the container including design features shall be smooth and free of any foreign bodies or flaws. The container shall be able to be immobilised by design. 6 Nominal load The container shall be constructed strongly enough to carry a load of 0,4 kg/dm3 x nominal volume. 7 Safety and health requirements The container shall meet the safety and health requirements according to EN 8406. 8 Testing The container shall fulfil the performance requirements and the tests of EN 8405. 9 Marking Each container plying with the requirements of this European Standard shall be durably and readably marked on the body in a visible part with: number of this European Standard (EN 8401)。 nominal volume。 manufacturer’s name or trademark。 total permissible mass, in kilograms。 year and month of manufacturing. Additional marking for quality, recycling, etc. is allowed. Beginning 5 years after the publication of this standard, plastic parts of containers, lids and wheels shall be marked in accordance wi th EN ISO 11469. The use of recycled materials is allowed, presuming that all requirements of this standard are plied with. EN 8401:2020 (E) 7 10 Designation The container plying with the requirements of this European Standard shall be designated as follows: Container EN 8401 240 A 96 Description Standard number Nominal volume, in litres Frontal receiver form: A = frontal receiver form A B = frontal receiver form B C = frontal receiver form C Nominal load, in kilograms EN 8401:2020 (E) 8 Dimen sion N176。 80 l 100 l 120 l 130 l 140 l Remarks a b a b a b a 1 448 177。 5 480 177。 5 472 177。 5 505 max. 472 177。 5 505 max. Total width of the container a 2 448 177。 5 480 177。 5 472 177。 5 390 177。 10 480 177。 5 472 177。 5 390 177。 10 480 177。 5 Width of the frontal receiver 3 530 max. 555 max. 558 max. 555 max. 558 max. 555 max. 4 975 max. 1021 max. 1005 max. 1021 max. 1100 max. Total height including handles on the lid a 5 860 min.。 1030 max. 860 min.。 1030 max. 860 min.。 1030 max. 860 min.。 1030 max. 860 min.。 1030 max. 6 450 max. 490 max. 497 max. 490 max. 497 max. 490 max. 7 1010 max. 1090 max. 1010 max. 1090 max. 1155 max. 8 430 min.。 670 max. 430 min.。 670 max. 430 min.。 670 max. 430 min.。 670 max. 430 min.。 670 max. For 300 mm wheels, the maximum dimension is 70 mm more a 9 410 max. 450 max. 440 177。 10 440 177。 10 440 177。 10 450 max. 10 320 177。 10 20 455 177。 15 20 455 177。 15 20 a 11 195 min. 195 min. 195 min. 195 min. 195 min. Larger wheels accepted a 12 19 min. 19 min. 19 min. 19 min. 19 min. a 13 6 2 4,5 2 6 4,5 2 6 4,5 2 6 4,5 6 2 4,5 a 14 25 min. 25 min. 25 min. 25 min. 25 min. a 15 5 5 5 5 5 a 16 2 212 2 212 2 212 2 212 212 2 17 This dimension is no more used. a 18 26 177。 1 26 177。 1 26 177。 1 26 177。 1 26 177。 1 a 19 58 max. 58 max. 58 max. 58 max. 58 max. a 20 20 min. 20 min. 20 min. 20 min. 20 min. a 21 130 max. 130 max. 130 max. 130 max. 130 max. 22 15 max. 15 max. 15 max. 15 max. 15 max. a 23 8 33 0 8 8 8 8 a 24 40 5 7 40 5 7 40 5 7 40 5 7 40 5 7 25 230 177。 12 279 177。 5 270 177。 12 279 177。 5 270 177。 12 Optional measurement a 26 147 177。 8 180 177。 5 180 177。 5 291 177。 5 180 177。 5 180 177。 5 291 177。 5 180 177。 5 Compulsory dimensions when ribs are fitted, max. ribs thickness 6 mm 27 270176。 min. 270176。 min. 270176。 min. 270176。 min. 270176。 min. a Compulsory dimensions for functional and safety reasons. The other dimensions indicated are suggested remended values. Table 2 — Dimensions for containers from 80 l to 140 l。bsen840-1-20xxmobilewastecontainers—part1containerswith2wheelswithacapacityupto400lforcomblif
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。