bsen61754-7-20xxfibreopticinterconnectingdevicesandpassivecomponents—fibre内容摘要:

cal datum targets. Also connector interfaces among 16 to 24 fibres will intermate and will correctly align the lower defined numbers of optical datum targets. Female plug Adaptor Male plug Backplane housing Printed board housing IEC 1065/2020 Figure 1 – MPO connector configurations – 6 – BS EN 617547:2020 ∅ ∅A C D ∅E ∅F ∅G ∅H T U S X Z R Q P K I O J N AC AB Y L AA Coupling sleeve M Pinholes See Figure 3 AD IEC 395/08 Figure 2 – MPO female plug connector angled interface – 7 – BS EN 617547:2020 Table 1 – Dimensions of the MPO female plug connector angled interface Reference Dimensions Notes Minimum Maximum A C D E F G H I J K L M N O P Q R S T U AA AB AC AD 0,699 mm 4,597 mm 6,3 mm 8,34 mm 9,49 mm 10,85 mm 12,19 mm 8,8 mm 7,9 mm 1,4 mm 0,2 mm 2,4 mm 2,8 mm 4,89 mm 5,59 mm 5,7 mm – 2,9 mm – 2,4 mm 42176。 – – 7,5176。 0,701 mm 4,603 mm 6,5 mm 8,54 mm 9,59 mm 11,05 mm 12,59 mm 9,2 mm 8,1 mm – 0,8 mm 2,6 mm 3,0 mm 4,99 mm 5,69 mm – 7,7 mm 3,1 mm 0,8 mm 2,5 mm 45176。 45176。 45176。 8,5176。 1 2 3 4 and 5 NOTE 1 Each pinhole must accept a gauge pin as shown in Figure 4 to a depth of 5,5 mm with a maximum force of 1,7 N. In addition, two pinholes of a plug must accept a gauge as shown in Figure 5 to a depth of 5,5 mm with a maximum force of 3,4 N. NOTE 2 Dimension C is defined as the distance between two pinhole centres. NOTE 3 Dimension I is given for a fibre endface centre of a plug end when not mated. It is noticed that a ferrule is movable by a certain axial pression force, and therefore dimension I is variable. Ferrule pression force must be 7,8 N to 11,8 N when a position of the fibre endface from the datum Z is in the range of 8,2 mm to 8,4 mm. NOTE 4 Coupling sleeve must be movable by a certain axial pression force. Dimension L is given for a coupling sleeve end when not mated. Coupling sleeve pression force must be 2,9 N to 6,9 N when a position of the coupling sleeve endface from datum Z is in the range of 0 mm to 0,1 mm to the right or to the left of datum Z. NOTE 5 An adaptor coupling part must be unlocked by a leftdirection movement of a coupling sleeve, when it is separate from an adaptor. W hen the coupling sleeve is moved for unlocking, a position of the coupling sleeve endface must be larger than 2,0 mm in the left direction from the datum Z. – 8 – BS EN 617547:2020 X X 0,125 0,125 0,125 0,125 0,375 0,625 0,375 0,625 0,875 1,125 0,875 1,125 X 0,125 0,125 0,375 0,375 X 0,125 0,125 0,375 0,625 0,875 1,125 1,375 0,375 0,625 0,875 1,125 1,375 X 0,125 0,125 0,375 0,625 0,875 0,375 0,625 0,875 Y Y Y Two fibres Four fibres Eight fibres Y Y Ten fibres Twelve fibres IEC 1594/04 Figure 3 – Optical datum target location diagrams (1 of 2) – 9 – BS EN 617547:2020 0,125 0,125 0,125 0,125 X X 0,375 0,625 0,875 1,125 1,375 0,375 0,625 0,875 0,375 0,625 0,875 1,125 1,375 0,375 0,625 0,875 0,125 0,125 X 0,375 0,625 0,875 1,125 0,375 0,625 0,875 1,125 0,250 0,250 0,250 0,250 Y Y Sixteen fibres 0,250 0,250 Twenty fibres Y Twenty four fibres IEC 1595/04 NOTE The optical datum target location diagram is shown in the figure. Here, datum X is defined as the line passing through two pinhole centres, and datum Y is defined as the line perpendicular to datum X and passing through the midpoint of two pinhole centres. Figure 3 (2 of 2) – 10 – BS EN 617547:2020 ∅BA ∅A 0,0005 BB BC B IEC 1596/04 Figure 4 – Gauge pin Table 2 – Dimensions of the gauge pin Reference Dimensions mm Notes Minimum Maximum A B BA BB BC 0,698 5 10,8 0,2 0,2 6,0 0,699 0 11,2 0,4 0,5 – 1 2 NOTE 1 Surface roughness Rz = 0,1 μm for the length of dimension BC. NOTE 2 Typical dimensions. – 11 – BS EN 617547:2020 ∅BA ∅A D C ∅0,001 W W BB U BC 0,000 5 IEC 396/08 Figure 5 – Gauge for plug Table 3 – Dimensions of the gauge for plug Reference Dimensions mm Notes Minimum Maximum A C D U BA BB BC 0,698 5 4,599 5 6,3 2,4 0,2 0,2 6,0 0,699 0 4,600 5 6,5 2,5 0,4 0,5 6,5 For two pins, 1 2 2 NOTE 1 Surface roughness Rz = 0,1 μm. NOTE 2 Typical dimensions. – 12 – BS EN 617547:2020 ∅A C D ∅E ∅F ∅G ∅H ∅BA T U S X Z ∅0,002 W K I J AC AB R Q P Guidepin O。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。