bsen61076-2-105-20xxconnectorsforelectronicequipmentproductrequirementscircularconnectorsd内容摘要:

................... 19 Polarizing method ...................................................................................... 19 Vibration (sinusoidal) ................................................................................. 19 5 Test schedule ................................................................................................................. 19 General ................................................................................................................. 19 BS EN 610762105:2020 610762105 169。 IEC:2020 – 3 – Test group EP – Connection method tests ................................................. 28 Annex A (informative) Diameter of the female connector body ............................................. 29 B ibliography.................................................................................................................. ........ 30 Figure 1 – Tube insert, male contacts, mounting without thread ............................................ 11 Figure 2 – Fixed connector, male contacts, mounting with thread M5 0,5, with wire ends, single hole mounting M5 0,5, mounting orientation ................................................... 11 Figure 3 – Fixed connector, male contacts, mounting with thread M5 0,5, with wire ends, single hole rear mounting, thread M5 0,5, mounting orientation ................................ 12 Figure 4 – Fixed connector, female contacts, mounting with thread M5 0,5, with wire ends, single mounting, thread M5 0,5, mounting orientation ............................................... 12 Figure 5 – Fixed connector, female contacts, mounting with thread M5 0,5, with wire ends, single hole rear mounting, thread M5 0,5, mounting orientation ................................ 13 Figure 6 – Nonrewireable connector, male contacts, straight version, with locking nut ......... 13 Figure 7 – Nonrewireable connector, male contacts, right angled version, with locking nut .. 14 Figure 8 – Nonrewireable connector, female contacts, straight version, with locking nut ...... 14 Figure 9 – Nonrewireable connector, female contacts, right angled version, with locking nut ............................................................................................................................ 14 Figure 10 – Pin front view ..................................................................................................... 15 Figure 11 – Contact position front view ................................................................................. 16 Figure 12 – Gauge dimensions ............................................................................................. 16 Figure 13 – Contact resistance arrangement ......................................................................... 20 Figure 14 – Dynamic stress test arrangement ....................................................................... 21 Figure – Diameter of the female connector body ............................................................. 29 Table 1 – Styles of fixed connectors type A ........................................................................... 10 Table 2 – Styles of free connectors ....................................................................................... 13 Table 3 – Gauges ................................................................................................................. 17 Table 4 – Climatic category .................................................................................................. 17 Table 5 – Rated voltage – Rated impulse voltage – Pollution degree .................................... 17 Table 6 – Voltage proof......................................................................................................... 18 Table 7 – Number of mechanical operations ........................................................................ . 19 Table 8 – Insertion and withdrawal forces ............................................................................. 19 Table 9 – Number of test specimens .................................................................................... . 20 Table 10 – Test group P ....................................................................................................... 22 Table 11 – Test group AP .................................................................................................... . 23 Table 12 – Test group BP ..................................................................................................... 25 Table 13 – Test group CP .................................................................................................... . 27 Table 14 – Test group DP ..................................................................................................... 28 Table 15 – Test group EP .................................................................................................... . 28 BS EN 610762105:2020 – 6 – 610762105 169。 IEC:2020 INTERNATIONAL ELECTROTECHNICAL COMMISSION IEC SC 48B – Connectors IEC 610762105 ELECTRONIC COMPONENTS DETAIL SPECIFICATION in accordance with IEC 610761:2020 IEC 1248/08 Circular connectors M5 3 to 4 way Male and female contacts Nonrewireable (fixed connector could also be rewirable) Free cable connectors Straight and right angle connectors Fixed connectors Single hole mounting BS EN 610762105:2020 610762105 169。 IEC:2020 – 7 – CONNECTORS FOR ELECTRONIC EQUIPMENT – PRODUCT REQUIREMENTS – Part 2105: Circular connectors – Detail specification for M5 connectors with screwlocking 1 General information Throughout this standard。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。