bsen60335-2-96-20xxhouseholdandsimilarelectricalappliances—safety—part2-96particularrequireme内容摘要:

......................................................................................................... 18 13 Leakage current and electric strength at operating temperature...................................... 18 14 Transient overvoltages ................................................................................................... 19 15 Moisture resistance ........................................................................................................ 19 16 Leakage current and electric strength ............................................................................. 19 17 Overload protection of transformers and associated circuits ........................................... 20 18 E ndurance ...................................................................................................................... 20 19 Abnormal operation ....................................................................................................... . 23 20 Stability and mechanical hazards ................................................................................... 23 21 Mechanical strength ....................................................................................................... 23 22 Construction ................................................................................................................... 25 23 Internal wiring................................................................................................................. 27 24 Components ................................................................................................................... 27 25 Supply connection and external flexible cords ................................................................ 27 26 Terminals for external conductors ................................................................................... 28 27 Provision for earthing ..................................................................................................... 28 28 Screws and connections ................................................................................................. 28 29 Clearances, creepage distances and solid insulation ...................................................... 28 30 Resistance to heat and fire ............................................................................................. 29 31 Resistance to rusting ...................................................................................................... 29 32 Radiation, toxicity and similar hazards ............................................................................ 29 Annexes ....................................................................................................................... ........ 39 Annex AA (informative) Summary of installation instructions ................................................. 40 Annex ZC (normative) Normative references to international publications with their corresponding European publications ................................................................................... 41 B ibliography.......................................................................................................................... 42 Page 6 BS EN 60335296:2020+A2:2020 Figure 101 – Arrangement for testing heating units in timber ceilings .................................... 30 Figure 102 – Arrangement for testing modular heating units ................................................. 31 Figure 103 – Arrangement for testing heating units in timber floors ....................................... 32 Figure 104 – Arrangement for testing heating units below concrete....................................... 33 Figure 105 – Arrangement for testing heating units in timber floors and ceilings in bination .......................................................................................................................... 34 Figure 106 – Jig for locating the contact needle .................................................................... 35 Figure 107 – Arrangement for testing heating units above timber floors ................................ 36 Figure 108 – Arrangement for testing heating units above concrete floors............................. 37 Figure 109 – Arrangement for measuring capacitive currents ................................................ 38 Table 101 – Temperature rise limits for surfaces ................................................................... 18 Page 7 BS EN 60335296:2020+A2:2020 INTRODUCTION It has been assumed in the drafting of this International Standard that the execution of its provisions is entrusted to appropriately qualified and experienced persons. A 2 It also covers abnormal situations that can be expected in practice and takes into account the way in which electromagic phenomena can affect the safe operation of appliances. A 2 This standard takes into account the requirements of IEC 60364 as far as possible so that there is patibility wi th the wiring rules when the appliance is connected to the supply mains. However, national wiring rules may differ. If an appliance within the scope of this standard also incorporates functions that are covered by another part 2 of IEC 60335, the relevant part 2 is applied to each function separately, as far as is reasonable. If applicable, the influence of one function on the other is taken into account. A 2 W hen a part 2 standard does not include additional requirements to cover hazards dealt with in Part 1, Part 1 applies. NOTE 1 This means that the technical mittees responsible for the part 2 standards have determined that it is not necessary to specify particular requirements for the appliance in question ove。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。