bsen60079-18-20xxelectricalapparatusforexplosivegasatmospheres—part18constructiontestandmarki内容摘要:

s ........................................................................................................ 32 Annex ZZ (informative) Coverage of Essential Requirements of EC Directives ......................................... 34 Page 4 EN 60079–18:2020 Figure 1 – Distances between free surface of pound and ponents or conductors .................................................................................................................................................. 14 Figure 2 – Distances between the wall or the free surface of the pound and the ponents or conductors ......................................................................................................................... 15 Figure 3 – Distances between the wall or the free surface of the pound and the ponents or conductors ......................................................................................................................... 16 Figure 4 – Minimum distances for multilayer printed wiring boards........................................................... 18 Figure – Basic requirements for pounds for ―m‖ apparatus. .......................................................... 29 Figure – Test procedure during thermal cycling test ............................................................................ 31 Table 1 – Distances through the pound ............................................................................................... 12 Table 2 – Minimum thickness of pound from free space ..................................................................... 13 Table 3 – Thickness of pound between the free surface of the pound and ponents or conductors ......................................................................................................................... 14 Table 4 – Thickness of the pound between the wall or the free surface of the pound and the ponents or conductors........................................................................................... 15 Table 5 – Thickness of the pound between the wall or the free surface of the pound and the ponents or conductors........................................................................................... 16 Table 6 – Minimum distances for multilayer printed wiring boards ............................................................ 17 Table 7 – Permissible primary cells ............................................................................................................ 20 Table 8 – Permissible secondary cells ....................................................................................................... 20 Table 9 – Test pressure .............................................................................................................................. 27 Table – Allocation of test samples........................................................................................................ 30 Page 5 EN 60079−18:2020 ! $ % amp。 39。 ( )* ( * * + .%/ + + ** * This part of IEC 60079 gives the specific requirements for the construction, testing and marking of electrical apparatus, parts of electrical apparatus and Ex ponents with the type of protection encapsulation ―m‖. This part of IEC 60079 only applies for encapsulated electrical apparatus, encapsulated parts of electrical apparatus and encapsulated Ex ponents (hereinafter always referred to as ―m‖ apparatus) where the rated voltage does not exceed 10 kV with a relative tolerance of +10 %. This standard supplements the general requirements in IEC 600790. 2 4 %。 ( The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. IE C 600790:⎯, IE C 600797:2020, IE C 6007911:1999, !! IE C 6007926:⎯, $ % amp。 39。 IE C 600861, ( ! IE C 60127 (all parts), ) IE C 602431, * ! * + IE C 60622, , ( amp。 , amp。 ( Page 6 EN 60079−18:2020 IE C 606641:1992, + + ! % Amendment 1 (2020) Amendment 2 (2020) IE C 60691, * amp。 . IE C 61150, / amp。 ( , amp。 ( ( ( ( IE C 6155826 , , + % + IE C 619511, , ( a amp。 ( ( ! 0 amp。 IE C 619512, , ( a amp。 (。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。