bsen50119-2001railwayapplications—fixedinstallations—electrictractionoverheadcontactlines内容摘要:

...................................... 41 Com m i ssi oni ng .............................................................................................. 42 Operati on and m ai ntenance docum entati on ..................................................... 42 Handov er ..................................................................................................... . 42 Annex A (norm ati v e) Env i ronm ental condi ti ons ............................................................. 43 Env i ronm ental param eters ............................................................................. . 43 W i nd pressure ...................................................................... ......................... 43 Preci pi tati on (snow, i ce, hum i di ty) .................................................................. . 43 Am bi ent tem perature ...................................................................................... 43 Sol ar radi ati on ............................................................................................... 43 Pol l uti on....................................................................................................... . 43 Addi ti onal requi rem ents.................................................................................. 44 Annex B (norm ati v e) Tem perature ri se i n conductors .................................................... . 45 El ectri cal desi gn of the conductor system ....................................................... . 45 Bi bl i ography................................................................................................................ . 46 T able 1 ラ Contact force ............................................................................................. 16 T able 3 ラ Factor Kloa d for grooved contact wires........................................................ 18 T able 4 ラ Factor Ktem p for stranded wires .................................................................. 19 T able 5 ラ Factor Kw i nd for stranded wires................................................................... 20 T able 6 ラ Factor Ki ce for stranded wires .................................................................... 20 T able 7 ラ Factor Kra dius for ropes of nonconducting materials .................................. 22 T able 8 ラ Contact wire gradients ............................................................................... 23 T able 9 ラ Electrical clearances ................................................................................. . 25 T able 10 ラ Phase voltage clearance .......................................................................... 25 T able ラ Pollution ................................................................................................. 44 T able ラ Maximum acceptable temperatures over which the mechanical properties of the material can be impaired. .......................................................... 45 5 EN 50119:2020 1 Scope This European Standard applies for the design and construction of electric traction overhead contact lines in railway and tramway applications (see clause 4). The standard is intended to be used by the system designer for the new construction of electric traction overhead contact lines or for the plete transformation of existing lines according to the client performance objectives. This document does not deal in detail with railway traction electrical supply systems or EMC requirements and is not applicable to feeders which are remote from the track. 2 Normative references This European Standard incorporates by dated or undated reference, provisions from other publications. These normative references are cited at the appropriate places in the text and the publications are listed hereafter. For dated references, subsequent amendments to or revisions of any of these publications apply to this European Standard only when incorporated within it by amendment or revision. For undated references the latest edition of the publication referred to applies. EN 501215 Railway applications Electromagic patibility Part 5: Emission and immunity of fixed power supply installations and apparatus EN 50122 series Railway applications ヨ Fixed installations EN 501221 Railway applications Fixed installations Part 1: Protective provisions relating to electrical safety and earthing EN 50123 series Railway applications Fixed installations DC switchgear EN 50124 series Railway applications Insulation coordination EN 501241 Railway applications Insulation coordination Part 1: Basic requirements Clearances and creepage distances for all electrical and electronic equipment EN 501251 Railway applications Environmental conditions for fixed installations Part 1: Equipment on board rolling stock EN 50149 Railway applications Fixed installations Electric traction Copper and copper alloy grooved contact wires EN 50152 series Railway applications Fixed installations Particular requirements for . switchgear EN 50163 Railway applications Supply voltages of traction systems EN 60099 series Surge arresters EN 60168 1994 Tests on indoor and outdoor post insulators of ceramic material or glass for systems with a nominal voltage greater than 1 000 V (IEC 60168:1994) EN 50119:2020 6 EN 60383 series Insulators for overhead lines with a nominal voltage above 1 kV (IEC 60383 series) EN 60507 Artificial pollution tests on highvoltage insulators to be used on . systems EN 60672 series Ceramic and glass insulating materials EN 61325 Insulators for overhead lines with a nominal voltage above 1 kV Ceramic or glass insul。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。