bsen13128-2001safetyofmachinetoolsmillingmachines(includingboringmachines内容摘要:

technical safety requirements and measures to be adopted by persons undertaking the design, construction and supply (including installation and dismantling, with arrangements for transport and maintenance) of milling machines (see ) including machines capable of performing boring operations (see ). Machines covered by this standard include but are not limited to: – knee and column type milling machines (see figures , )。 – bed–type milling machines (see figure )。 – multi–spindle milling machines (see figures and )。 – plano–milling machines (see figures and )。 – profile and contouring milling machines (see figure ), – milling and boring machines (see figure ). This standard takes account of intended use including reasonably foreseeable misuse, maintenance, cleaning, and setting operations. It presumes access to the machine from all directions. It describes means to reduce risks to operators and other exposed persons. This standard also applies to workpiece transfer devices when they form an integral part of the machine. This standard deals with significant hazards relevant to milling machines when they are used as intended and under the conditions foreseen by the manufacturer (see clause 4). Hazards arising from other metal working processes (. grinding, turning, forming, EDM, laser processing) are covered by other standards (see Bibliography). Milling machines with automatic tool changing capabilities are not covered by this standard (see prEN 12417:1996). This standard is not applicable to milling machines which were manufactured before the date of publication by CEN of this standard. 2 Normative references This European Standard incorporates, by dated or undated reference, provisions from other publications. These normative references are cited at the appropriate places in the text and the publications are listed hereafter. For dated references, subsequent amendments to or revisions of any of these publications apply to this European Standard only when incorporated in it by amendment or revision. For undated references the latest edition of the publication referred to applies (including amendments). EN 2921: 1991 Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology EN 2922: 1991 and EN 2922/A1:1995 Safety of machinery Basic concepts, general principles for design Part 2: Technical principles and specifications EN 294: 1992 Safety of machinery – Safety distances to prevent danger zones being reached by the upper limbs EN 349 Safety of machinery – Minimum gaps to avoid crushing of parts of the human body EN 457 Safety of machinery Auditory danger signals General requirements, design and testing (ISO 7731:1986 modified) EN 574 Safety of machinery Two hand control devices – Functional aspects – Principles for design EN 614 Safety of machinery Ergonomic design principles – Part 1 Terminology and general principles Part 2 Interaction between machinery design and work tasks EN 626 Safety of machinery – Reduction of risks to health from hazardous substances emitted by machinery EN 811 Safety of machinery – Safety distances to prevent danger zones being reached by the lower limbs Page 6 EN 13128:2020 EN 894: Safety of machinery –Ergonomics requirements and data for the design of displays and control actuators Part 1:1997 Human interactions Part 2:1997 Displays Part 3:2020 Control actuators EN 953:1997 Safety of machinery – Guards – General requirements for the design and construction of fixed and movable guards EN 9541 Safety of machinery Safetyrelated parts of control systems Part l: General principles for design EN 982:1996 Safety of machinery Safety requirements for fluid power systems and their ponents Hydraulics EN 983:1996 Safety of machinery Safety requirements for fluid power systems and their ponents Pneumatics EN 999 Safety of machinery – The positioning of protective equipment in respect of approach speeds of parts of the human body prEN 1005:1998 Safety of machinery – Human physical performance – Part 1: Terms and definitions Part 2: Manual handling of heavy weights associated with machinery Part 3: Remended force limits for machinery operation EN 1037:1995 Safety of machinery – Prevention of unexpected startup EN 1050:1996 Safety of machinery Principles for risk assessment EN 1088:1995 Safety of machinery Interlocking devices associated with guards – Principles for design and selection EN 1127–1:1997 Explosive atmospheres Explosion prevention and protection – Part 1: Basic concepts an methodology EN 1760–1:1997 Safety of machinery Pressure sensitive protective devices – Part 1: General principles for the design and testing of pressure sensitive mats and pressure sensitive floors EN 1837 Safety of machinery – Integral lighting of machines EN 608251:1994 + A11:1996 Safety of laser products – Equipment classification, requirements and user‘s guide EN ISO 3744:1995 Acoustics – Determination of sound power level of noise sources using sound pressure – Engineering method in an essentially free field over a reflecting plane EN ISO 3746:1995 Acoustics – Determination of sound power level of noise sources using sound pressure – Survey method using an enveloping measurement surface over a reflecting plane EN ISO 4871 Acoustics – Declaration and verification of noise emission values of machinery and equipment EN ISO 96141:1995 Acoustics – Determination of sound power level of noise sources using sound intensity – Part 1: Measurement at discrete points EN ISO 11202:1995 Acoustics – Noise emitted by machinery and equipment – Measurement method of emission sound power levels at the work station and at other specified positions – Survey method in situ EN ISO 11。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。